A detailed workforce planning model including non-linear dependence of capacity on the size of the staff and cash management

This paper introduces an original planning model which integrates production, human resources and cash management decisions, taking into account the consequences that decisions in one area may have on other areas and allowing all these areas to be coordinated. The most relevant characteristics of the planning problem are: (1) production capacity is a non-linear function of the size of the staff; (2) firing costs may depend on the worker who is fired; (3) working time is managed under a working time account (WTA) scheme, so positive balances must be paid to workers who leave the company; (4) there is a learning period for hired workers; and (5) cash management is included. A mixed integer linear program is designed to solve the problem. Despite the size and complexity of the model, it can be solved in a reasonable time. A numerical example, the main results of a computational experiment and a sensibility analysis illustrate the performance and benefits of the model.

[1]  Albert Corominas,et al.  Using a MILP model to establish a framework for an annualised hours agreement , 2007, Eur. J. Oper. Res..

[2]  Amaia Lusa,et al.  Planning working time accounts under demand uncertainty , 2011, Comput. Oper. Res..

[3]  Achim Koberstein,et al.  Modeling and optimizing of strategic and tactical production planning in the automotive industry under uncertainty , 2009, OR Spectr..

[4]  Marino Widmer,et al.  A case study of single shift planning and scheduling under annualized hours: A simple three-step approach , 2004, Eur. J. Oper. Res..

[5]  Rudy Hung,et al.  Scheduling a workforce under annualized hours , 1999 .

[6]  Osman Alp,et al.  Integrated workforce capacity and inventory management under labour supply uncertainty , 2009 .

[7]  Hamid Tohidi,et al.  Productivity outcomes of teamwork as an effect of information technology and team size , 2006 .

[8]  Rohit Bhatnagar,et al.  Contingent manpower planning in a high clock speed industry , 2007 .

[9]  Loo Hay Lee,et al.  SimMan - A simulation model for workforce capacity planning , 2009, Comput. Oper. Res..

[10]  Atul P. Kanyalkar,et al.  An integrated aggregate and detailed planning in a multi-site production environment using linear programming , 2005 .

[11]  Lee Luong,et al.  Modeling and Optimization of Aggregate Production Planning - A Genetic Algorithm Approach , 2008 .

[12]  A holistic framework for short-term supply chain management integrating production and corporate financial planning , 2007 .

[13]  Albert Corominas,et al.  Using MILP to plan annualised working hours , 2002, J. Oper. Res. Soc..

[14]  K. Singhal,et al.  Holt, Modigliani, Muth, and Simon's work and its role in the renaissance and evolution of operations management , 2007 .

[15]  Albert Corominas,et al.  Production planning under a working time accounts scheme , 2009 .

[16]  Brian H. Kleiner,et al.  Aggregate planning today , 1994 .

[17]  Murat Köksalan,et al.  An integrated production and financial planning model and an application , 1996 .

[18]  Sophie D'Amours,et al.  Simulation and performance evaluation of partially and fully integrated sales and operations planning , 2010 .

[19]  Roger W. Schmenner,et al.  Economics and operations management: towards a theory of endogenous production speed , 2002 .

[20]  Albert Corominas,et al.  A support tool for working time bargaining by considering individual time accounts and annual leave , 2010 .

[21]  Albert Corominas,et al.  Capacity planning with working time accounts in services , 2010, J. Oper. Res. Soc..

[22]  Hanif D. Sherali,et al.  Two-stage workforce planning under demand fluctuations and uncertainty , 2009, J. Oper. Res. Soc..

[23]  C. C. Holt,et al.  A Linear Decision Rule for Production and Employment Scheduling , 1955 .

[24]  Albert Corominas,et al.  Human resource management using working time accounts with expiry of hours , 2009 .

[25]  David L. Woodruff,et al.  Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .

[26]  J. Venkateswaran,et al.  Hybrid system dynamic—discrete event simulation-based architecture for hierarchical production planning , 2005 .

[27]  Adil Baykasoğlu MOAPPS 1.0: Aggregate production planning using the multiple-objective tabu search , 2001 .

[28]  David L. Woodruff,et al.  Connecting MRP, MRP II and ERP — Supply Chain Production Planning Via Optimization Models , 2005 .

[29]  Albert Corominas,et al.  Planning Annualised Hours with a Finite Set of Weekly Working Hours and Joint Holidays , 2004, Ann. Oper. Res..

[30]  Xi Yang,et al.  Operations risk management by optimally planning the qualified workforce capacity , 2010, European Journal of Operational Research.

[31]  Huei Chuen Huang,et al.  A successive convex approximation method for multistage workforce capacity planning problem with turnover , 2008, Eur. J. Oper. Res..

[32]  H. Ashcroft,et al.  The Productivity of Several Machines Under the Care of One Operator , 1950 .

[33]  John W. Fowler,et al.  Heuristics for workforce planning with worker differences , 2008, Eur. J. Oper. Res..

[34]  Nadia Lahrichi,et al.  A flexible MILP model for multiple-shift workforce planning under annualized hours , 2010, Eur. J. Oper. Res..