A Comprehensive Survey and Future Trend of Simulation Study on Fms Scheduling
暂无分享,去创建一个
[1] W. E. Wilhelm,et al. Effectiveness of alternate operations in a flexible manufacturing system , 1985 .
[2] J. Kaltwasser,et al. Hierarchical Control of Flexible Manufacturing Systems , 1986 .
[3] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[4] Kwasi Amoako-Gyampah. A comparative study of FMS tool allocation and part type selection approaches for a varying part type mix , 1994 .
[5] David R. Denzler,et al. Experimental investigation of flexible manufacturing system scheduling decision rules , 1987 .
[6] Lotfi A. Zadeh,et al. The Concepts of a Linguistic Variable and its Application to Approximate Reasoning , 1975 .
[7] Waldemar Karwowski,et al. Fuzzy concepts in production management research: a review , 1986 .
[8] Kripa Shanker,et al. A loading and dispatching problem in a random flexible manufacturing system , 1985 .
[9] Paolo Gaiardelli,et al. Hybrid genetic algorithmsfor a multiple-objective scheduling problem , 1998, J. Intell. Manuf..
[10] Joel A. Schnur,et al. Stimulation through simulation , 1987 .
[11] George Chryssolouris,et al. Dynamic scheduling of manufacturing job shops using genetic algorithms , 2001, J. Intell. Manuf..
[12] Eric M. Malstrom,et al. Evaluation of traditional work scheduling rules in a flexible manufacturing system with a physical simulator , 1988 .
[13] Yeong-Dae Kim. A comparison of dispatching rules for job shops with multiple identical jobs and alternative routeings , 1990 .
[14] Andrew Wallace,et al. Application of AI to AGV control?agent control of AGVs , 2001 .
[15] Richard A. Wysk,et al. Multi-pass expert control system - a control/scheduling structure for flexible manufacturing cells , 1988 .
[16] Soumen Ghosh,et al. An evaluation of the interaction between dispatching rules and truncation procedures in job-shop scheduling , 1993 .
[17] Richard A. Wysk,et al. An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing , 1989 .
[18] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[19] C. R. Bector,et al. A review of scheduling rules in flexible manufacturing systems , 1989 .
[20] W. M. Nawijn,et al. Quasi on-line scheduling Procedures for Flexible Manufacturing Systems , 1988 .
[21] Sharad K. Maheshwari,et al. Simultaneous evaluation and selection of strategies for loading and controlling machines and material handling system in FMS , 1995 .
[22] L. N. Van Wassenhove,et al. Analysis of Scheduling Rules for an FMS , 1990 .
[23] Hüseyin Sarper. Evaluation of simple dispatching rules for dynamic single-machine earliness/tardiness problem , 1994 .
[24] Ram Rachamadugu,et al. Scheduling with Sequencing Flexibility , 1993 .
[25] N. Jawahar,et al. Knowledge-based workcell attribute oriented dynamic schedulers for flexible manufacturing systems , 1998 .
[26] Damien Trentesaux,et al. Hybrid approach to decision-making for job-shop scheduling , 1999 .
[27] Sang M. Lee,et al. A multi-objective production planning model in a flexible manufacturing environment , 1989 .
[28] Ihsan Sabuncuoglu,et al. Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion , 1992 .
[29] Joseph J. Talavage,et al. A transient-based real-time scheduling algorithm in FMS , 1991 .
[30] Hao Xing,et al. Automated knowledge acquisition for design and manufacturing: The case of micromachined atomizer , 2001, J. Intell. Manuf..
[31] Felix T. S. Chan,et al. Simulation of Scheduling Rules in A Flexible Manufacturing System Using Fuzzy Logic , 1996, IEA/AIE.
[32] Andrew Kusiak,et al. Intelligent scheduling of automated machining systems , 1992 .
[33] H. A. Pak,et al. Heuristical job allocation in a flexible manufacturing system , 1986 .
[34] James P. Ignizio,et al. A practical overview of neural networks , 1997, J. Intell. Manuf..
[35] R. S. Lashkari,et al. A new formulation of operation allocation problem in flexible manufacturing systems: mathematical modelling and computational experience , 1987 .
[36] Yuehwern Yih,et al. A competitive neural network approach to multi-objective FMS scheduling , 1998 .
[37] Hans Ziegler,et al. Improving job shop performance by coordinating dispatching rules , 1995, Other Conferences.
[38] Chih-Ming Liu,et al. Intelligent scheduling of FMSs with inductive learning capability using neural networks , 1995 .
[39] J. A. Buzacott,et al. Flexible manufacturing systems: a review of analytical models , 1986 .
[40] Fts Chan,et al. An intelligent fuzzy decision support system for scheduling of FMS , 1996 .
[41] Shinichi Nakasuka,et al. Dynamic scheduling system utilizing machine learning as a knowledge acquisition tool , 1992 .
[42] Gary D. Scudder,et al. Priority scheduling with cost considerations , 1983 .
[43] George Chryssolouris,et al. Manufacturing systems operation: Dispatch rules versus intelligent control , 1988 .
[44] Uttarayan Bagchi,et al. Experimental investigation of real-time scheduling in flexible manufacturing systems , 1985 .
[45] Joseph J. Talavage,et al. A mixed dispatching rule approach in FMS scheduling , 1994 .
[46] Jim Hutchison,et al. Scheduling approaches for random job shop flexible manufacturing systems , 1991 .
[47] Chun-Hung Chen,et al. A Hybrid approach for integer programming combining genetic algorithms, linear programming and ordinal optimization , 2001, J. Intell. Manuf..
[48] S. G. Deshmukh,et al. Simulation for analysis of scheduling rules for a flexible manufacturing system , 1995 .
[49] Subhash Wadhwa,et al. Impact of Routing Flexibility on the Performance of an FMS—A Simulation Study , 1997 .
[50] Andrew Kusiak,et al. Flexible Manufacturing Systems: A Structural Approach , 1985 .
[51] Yuehwern Yih,et al. A framework for part type selection and scheduling in FMS environments , 1995 .
[52] Xiaodong Deng,et al. Artificial intelligence and expert systems applications in new product development—a survey , 1999, J. Intell. Manuf..
[53] Gerald W. Evans,et al. A review of multi-criterion approaches to FMS scheduling problems , 1991 .
[54] Semra Tunali. Evaluation of alternate routing policies in scheduling a job-shop type FMS , 1997 .
[55] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[56] Nagen Nagarur,et al. An integrated decision support system for FMS: using intelligent simulation , 1994 .
[57] Kathryn E. Stecke. Variations in flexible manufacturing systems according to the relevant types of automated materials handling , 1984 .
[58] Hungtao Joseph Wen,et al. Formation and dynamic routing of part families among flexible manufacturing cells , 1993 .
[59] Fts Chan,et al. A fuzzy integrated decision-making support system for scheduling of FMS using simulation , 1997 .
[60] Chandrasekharan Rajendran,et al. A comparative analysis of two different approaches to scheduling in flexible flow shops , 2000 .
[61] Fts Chan,et al. Simulation of Flexible Manufacturing Systems via Fuzzy Control Scheduling , 1995 .
[62] D. Harrison,et al. The Application of Parallel Multipopulation Genetic Algorithms to Dynamic Job-Shop Scheduling , 2000 .
[63] Felix T.S. Chan,et al. The Applications of Flexible Manufacturing Technologies in Business Process Reengineering , 2001 .
[64] Kathryn E. Stecke,et al. Loading and control policies for a flexible manufacturing system , 1981 .
[65] S. E. Kilic,et al. Job shop scheduling using fuzzy logic , 2004 .
[66] Homer Rahnejat,et al. Simulation aids design for flexible automation , 1986 .
[67] Felix T.S. Chan,et al. Real-time operation selection in an FMS using simulation- a fuzzy approach , 1997 .
[68] Robert LIN,et al. NOTE ON FUZZY SETS , 2014 .
[69] Subhash C. Sarin,et al. The machine loading and tool allocation problem in a flexible manufacturing system , 1987 .
[70] Ws S. Lau,et al. An intelligent hybrid system for initial process parameter setting of injection moulding , 2000 .
[71] Yoke San Wong,et al. Machine Selection Rules in a Dynamic Job Shop , 2000 .
[72] Ronald E. Giachetti,et al. A decision support system for material and manufacturing process selection , 1998, J. Intell. Manuf..
[73] Toshio Fukuda,et al. Structured intelligence for self-organizing manufacturing systems , 1999, J. Intell. Manuf..
[74] Robert M. O'Keefe,et al. Part input into a flexible flow system: An evaluation of look-ahead simulation and a fuzzy rule base , 1992 .
[75] Henry C. Co,et al. Sequencing in flexible manufacturing systems and other short queue-length systems , 1988 .
[76] Xiaodong Xie,et al. A simulation analysis of sequencing rules for ASRS in a pull-based assembly facility , 1993 .
[77] Ram Rachamadugu,et al. Classification and review of FMS scheduling procedures , 1994 .
[78] Kathryn E. Stecke,et al. Machine utilizations achieved using balanced FMS production ratios in a simulated setting , 1988 .
[79] Hing Kai Chan,et al. Dynamic Scheduling for a Flexible Manufacturing System - The Pre-emptive Approach , 2001 .
[80] Xuan F. Zha,et al. Integrated knowledge-based Petri net intelligent flexible assembly planning , 1998, J. Intell. Manuf..
[81] Jean-Louis Malouin,et al. Evaluation of the Shortest Processing Time Scheduling Rule with Truncation Process , 1973 .
[82] P. Aravindan,et al. Development of a computer simulator for dynamic scheduling of FMS to achieve optimal performance , 1996 .
[83] Mohamed F. Abin. Solution of scheduling problems of job-shop type FMS with alternative machine tools , 1986 .
[84] Yugeng Xi,et al. A rolling horizon job shop rescheduling strategy in the dynamic environment , 1997 .
[85] Yuehwern Yih,et al. Integration of inductive learning and neural networks for multi-objective FMS scheduling , 1998 .
[86] Kum Khiong Yang,et al. A comparison of job shop dispatching rules using a total cost criterion , 1994 .
[87] Ranga V. Ramasesh. Dynamic job shop scheduling: A survey of simulation research , 1990 .
[88] Ronald D. Armstrong,et al. Single machine scheduling to minimize mean absolute lateness: A heuristic solution , 1990, Comput. Oper. Res..
[89] Gary D. Scudder,et al. Scheduling rule selection for the forbidden early shipment environment: a comparison of economic objectives , 1992 .
[90] F. Frank Chen,et al. Intelligent scheduling and control of rail-guided vehicles and load/unload operations in a flexible manufacturing system , 1999, J. Intell. Manuf..
[91] Farzad Mahmoodi,et al. The Effects of Scheduling Rules and Routing Flexibility on the Performance of a Random Flexible Manufacturing System , 1999 .
[92] Kathryn E. Stecke,et al. Using mathematical programming and simulation to study FMS machine utilizations , 1987, WSC '87.
[93] Thomas R. Hoffmann,et al. Composite cost-based rules for priority scheduling in a randomly routed job shop , 1985 .
[94] Bernard Grabot,et al. Dispatching rules in scheduling Dispatching rules in scheduling: a fuzzy approach , 1994 .
[95] Ihsan Sabuncuoglu,et al. Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system , 1992 .
[96] Ihsan Sabuncuoglu,et al. A STUDY OF SCHEDULING RULES OF FLEXIBLE MANUFACTURING SYSTEMS : A SIMULATION APPROACH , 1998 .
[97] Jiyin Liu,et al. A new classification scheme for flexible manufacturing systems , 1993 .
[98] Joseph J. Talavage,et al. Intelligent dispatching for flexible manufacturing , 1991 .
[99] Joong-In Kim,et al. Multi-criteria operational control rules in flexible manufacturing systems (FMSs) , 1990 .
[100] T. Sekiguchi,et al. Fuzzy inference-based multiple criteria FMS scheduling , 1999 .
[101] Yuehwern Yih,et al. A study on decision rules of a scheduling model in an FMS , 1993 .
[102] Hans-Jürgen Zimmermann,et al. A method to control flexible manufacturing systems , 1989 .
[103] Richard Bellman,et al. Mathematical Aspects Of Scheduling And Applications , 1982 .
[104] James O'Kane,et al. A knowledge-based system for reactive scheduling decision-making in FMS , 2000, J. Intell. Manuf..
[105] Robert M. O'Keefe,et al. Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system , 1992 .
[106] Hoda A. ElMaraghy. Simulation and graphical animation of advanced manufacturing systems , 1982 .
[107] Gregory V. Frazier. An evaluation of group scheduling heuristics in a flow-line manufacturing cell , 1996 .
[108] Rakesh Nagi,et al. Fuzzy set theory applications in production management research: a literature survey , 1998, J. Intell. Manuf..
[109] S. C. Kim,et al. Impact of sequence-dependent setup time on job shop scheduling performance , 1994 .
[110] Xuan F. Zha,et al. Integrated knowledge-based approach and system for product design for assembly , 1999, Int. J. Comput. Integr. Manuf..
[111] Joe H. Mize,et al. Scheduling and control of flexible manufacturing systems: a critical review , 1994 .
[112] Felix T.S. Chan,et al. A fuzzy approach to operation selection , 1997 .