Improving production planning through finite-capacity MRP
暂无分享,去创建一个
Rossella Pozzi | Tommaso Rossi | R. Cigolini | Margherita Pero | Rossella Pozzi | T. Rossi | R. Cigolini | M. Pero
[1] J. Miltenburg,et al. Computational complexity of algorithms for MRP and JIT production planning problems in enterprise resource planning systems , 2001 .
[2] Thom J. Hodgson,et al. A simulation-based finite capacity scheduling system , 1997, WSC '97.
[3] Richard F. Hartl,et al. Simulation-based optimization methods for setting production planning parameters , 2014 .
[4] Michael P. Wellman,et al. Planning and Control , 1991 .
[5] Rakesh Nagi,et al. Cycle time reduction by improved MRP-based production planning , 2000 .
[6] Oliver Wight. The Executive's Guide to Successful MRP II , 1982 .
[7] P. C. Pandey,et al. A finite capacity material requirements planning system , 2000 .
[8] Tommaso Rossi,et al. A simulation-based finite capacity MRP procedure not depending on lead time estimation , 2011 .
[9] Anders Segerstedt. Formulas of MRP , 1996 .
[10] Fabrizio Dallari,et al. Applying an integrated logistics network design and optimisation model: the Pirelli Tyre case , 2012 .
[11] Teeradej Wuttipornpun,et al. Development of finite capacity material requirement planning system for assembly operations , 2004 .
[12] S. Reiter. A System for Managing Job-Shop Production , 1966 .
[13] Fabrizio Dallari,et al. An integrated model for designing and optimising an international logistics network , 2012 .
[14] R. John Milne,et al. Optimizing planned lead times for enhancing performance of MRP systems , 2015 .
[15] Li Sun,et al. Comparing dynamic risk-based scheduling methods with MRP via simulation , 2012 .
[16] Reha Uzsoy,et al. A comparison of multiple linear regression approaches for fitting clearing functions to empirical data , 2014 .
[17] George Ioannou,et al. Lead time estimation in MRP/ERP for make-to-order manufacturing systems , 2012 .
[18] Patrik Jonsson,et al. A longitudinal study of material planning applications in manufacturing companies , 2006 .
[19] John J. Kanet,et al. Integrating production planning and control: towards a simple model for Capacitated ERP , 2010 .
[20] Jan Olhager,et al. The effect of MRP lot sizing on actual cumulative lead times in multi-level systems , 1998 .
[21] Richard B. Chase,et al. Production and operations management : manufacturing and services , 1995 .
[22] Reha Uzsoy,et al. Zero-order production planning models with stochastic demand and workload-dependent lead times , 2015 .
[23] Herbert Jodlbauer,et al. Material and capacity requirements planning with dynamic lead times , 2012 .
[24] Alexandre Dolgui,et al. A State of the Art on Supply Planning and Inventory Control under Lead Time Uncertainty , 2013 .
[25] Martin Taal,et al. Integrating MRP and finite capacity planning , 1997 .
[26] Jinwoo Park,et al. A high performance finite capacitated MRP process using a computational grid , 2009 .
[27] S. T. Enns. MRP performance effects due to lot size and planned lead time settings , 2001 .
[28] Tommaso Rossi,et al. Evaluating supply chain integration: a case study using fuzzy logic , 2008 .
[29] N. Raghavan,et al. Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility , 2001 .
[30] R. R. P. Jackson,et al. Production Planning and Control , 1965 .
[31] Cemalettin Öztürk,et al. A MIP based heuristic for capacitated MRP systems , 2012, Computers & industrial engineering.
[32] Ping Ji,et al. A mixed integer programming model for advanced planning and scheduling (APS) , 2007, Eur. J. Oper. Res..
[33] Arslan M. Ornek,et al. Capacitated lot sizing with alternative routings and overtime decisions , 2006 .
[34] J. Little. A Proof for the Queuing Formula: L = λW , 1961 .
[35] Raul Poler Escoto,et al. MRP with flexible constraints: A fuzzy mathematical programming approach , 2006, Fuzzy Sets Syst..
[36] S. K. Das,et al. Finite capacity scheduling method for MRP with lot size restrictions , 2001 .
[37] Kenneth Fordyce,et al. Optimized material requirements planning for semiconductor manufacturing , 2012, J. Oper. Res. Soc..
[38] John O. McClain,et al. Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction , 1983 .