Capacitated Lot-Sizing and Scheduling Problem for Second-Tier Suppliers in the Automotive Sector
暂无分享,去创建一个
Raul Poler | Josefa Mula | Manuel Díaz-Madroñero | Beatriz Andres | S. Sanchis | J. Mula | R. Poler | Manuel Díaz-Madroñero | B. Andrés | S. Sanchis
[1] Horst Tempelmeier,et al. Dynamic capacitated lot-sizing problems: a classification and review of solution approaches , 2010, OR Spectr..
[2] Diego Klabjan,et al. Lead time considerations for the multi-level capacitated lot-sizing problem , 2015, Eur. J. Oper. Res..
[3] Herbert Meyr,et al. The general lotsizing and scheduling problem , 1997 .
[4] Maria Antónia Carravilla,et al. A note on "the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times , 2008, Comput. Oper. Res..
[5] Günter Fandel,et al. Simultaneous lot sizing and scheduling for multi-product multi-level production , 2006 .
[6] D. Klabjan,et al. Single machine multi-product capacitated lot sizing with sequence-dependent setups , 2007 .
[7] Diwakar Gupta,et al. The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times , 2005, Comput. Oper. Res..
[8] Zeger Degraeve,et al. Modeling industrial lot sizing problems: a review , 2008 .
[9] Hanif D. Sherali,et al. Primary pharmaceutical manufacturing scheduling problem , 2014 .
[10] Mohammad Saidi-Mehrabad,et al. MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints , 2013 .
[11] Wilbert E. Wilhelm,et al. Scheduling and lot sizing with sequence-dependent setup: A literature review , 2006 .