Two-stage production scheduling with an option of outsourcing from a remote supplier

This paper studies a two-stage production system with n job orders where each job needs two sequential operations. In addition to the two in-house production facilities, the manufacturer has another option of outsourcing some stage-one operations to a remote outside supplier. The jobs with their stage-one operations outsourced are subject to a batch transportation delay from the outside supplier before their respective stage-two operations can be started in-house. The problem is to design an integrated schedule that considers both the in-house production and the outsourcing with the aim of optimally balancing the outsourcing cost and the makespan. The problem is NP-hard. We have developed an optimal algorithm and a heuristic algorithm to solve the problem, and conducted computational experiments to validate our model and algorithms. Our modeling and algorithm framework can be extended to handle other more general cases such as when the outside supplier has a production facility with a different processing efficiency and when there are many outside suppliers on a spot market.

[1]  Chung-Lun Li,et al.  Lot streaming with supplier–manufacturer coordination , 2004 .

[2]  Xiangtong Qi,et al.  A logistics scheduling model: scheduling and transshipment for two processing centers , 2006 .

[3]  George L. Vairaktarakis,et al.  Integrated Scheduling of Production and Distribution Operations , 2005, Manag. Sci..

[4]  T. C. Edwin Cheng,et al.  Single Supplier Scheduling for Multiple Deliveries , 2001, Ann. Oper. Res..

[5]  Jinwoo Park,et al.  A new approach to job shop scheduling problems with due date constraints considering operation subcontracts , 2005 .

[6]  George L. Vairaktarakis,et al.  Optimization of processing and delivery decisions involving third-party machines , 2005 .

[7]  Zhi-Long Chen,et al.  Scheduling with subcontracting options , 2008 .

[8]  Chris N. Potts,et al.  The Coordination of Scheduling and Batch Deliveries , 2005, Ann. Oper. Res..

[9]  George L. Vairaktarakis,et al.  Minimizing makespan in hybrid flowshops , 1994, Oper. Res. Lett..

[10]  Ceyda Oguz,et al.  A Genetic Algorithm for Hybrid Flow-shop Scheduling with Multiprocessor Tasks , 2005, J. Sched..

[11]  Michael Pinedo,et al.  Planning and Scheduling in Supply Chains: An Overview of Issues in Practice , 2004 .

[12]  Alessandro Agnetis,et al.  Supply chain scheduling: Sequence coordination , 2006, Discret. Appl. Math..

[13]  Xiangtong Qi A logistics scheduling model: Inventory cost reduction by batching , 2005 .

[14]  Ik Sun Lee,et al.  Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed , 2008, Eur. J. Oper. Res..

[15]  Chung Yee Lee,et al.  Production and transport logistics scheduling with two transport mode choices , 2005 .

[16]  Zhi-Long Chen,et al.  Machine scheduling with transportation considerations , 2001 .

[17]  Hua Xuan,et al.  A new Lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion time , 2006, Comput. Oper. Res..

[18]  Zhi-Long Chen,et al.  Order Assignment and Scheduling in a Supply Chain , 2006, Oper. Res..

[19]  Christos Koulamas,et al.  A note on makespan minimization in two-stage flexible flow shops with uniform machines , 2006, Eur. J. Oper. Res..

[20]  Johnny C. Ho,et al.  Generating Pareto schedules with outsource and internal parallel resources , 2006 .

[21]  Milind Dawande,et al.  Supply Chain Scheduling: Distribution Systems , 2006 .

[22]  Xiangtong Qi,et al.  Coordinated Logistics Scheduling for In-House Production and Outsourcing , 2008, IEEE Transactions on Automation Science and Engineering.

[23]  Ik Sun Lee,et al.  Single machine scheduling with outsourcing allowed , 2008 .

[24]  Chung-Yee Lee,et al.  Machine scheduling with job delivery coordination , 2004, Eur. J. Oper. Res..

[25]  Chung-Lun Li,et al.  Machine scheduling with deliveries to multiple customer locations , 2005, Eur. J. Oper. Res..

[26]  Joseph Y.-T. Leung,et al.  Two Machine Scheduling under Disruptions with Transportation Considerations , 2006, J. Sched..

[27]  Chris N. Potts,et al.  Supply chain scheduling: Batching and delivery , 2003, Oper. Res..

[28]  Jan Karel Lenstra,et al.  Complexity of machine scheduling problems , 1975 .

[29]  P. S. Sundararaghavan,et al.  Minimizing makespan in parallel flowshops , 1997 .

[30]  Chiung Moon,et al.  Advanced planning and scheduling with outsourcing in manufacturing supply chain , 2002 .