Guidance for in situ subaqueous capping of contaminated sediments

In-Situ Capping is defined as the placement of a subaqueous covering or cap of clean isolating material over an in-situ deposit of contaminated sediment. ISC is a potentially economical and effective approach for remediation of contaminated sediment. A number of sites have been remediated by in-situ capping operations worldwide. This document provides technical guidance for subaqueous, in-situ capping as a remediation technique for contaminated sediments. The document was prepared as a part of the studies conducted for the U.S. Environmental Protection Agency (USEPA) under the Assessment and Remediation of Contaminated Sediments (ARCS) Program, administered by USEPA's Great Lakes National Program Office (GLNPO), in Chicago, Illinois. Caps for in-situ sediment remediation may be constructed of clean sediments, sand, gravel, or may involve a more complex design with geotextiles, liners and multiple layers. In-situ capping can provide several primary functions: physical isolation of the contaminated sediment from the benthic environment; stabilization of contaminated sediments, preventing resuspension and transport to other sites; and, reduction of the flux of dissolved contaminants into the water column. To achieve these results, an in-situ capping project must be treated as an engineered project with carefully considered design, construction, and monitoring. The basic criterion for a successful capping project is simply that the cap required to perform some or all of these functions be successfully designed, placed, and maintained. This document provides descriptions of the processes involved with in-situ capping, identification of the design requirements of an in-situ capping project, and a recommended sequence for design. Detailed guidance is provided on site and sediment characterization, cap design, equipment and placement techniques, and monitoring and management considerations. This report should be cited as follows: Palermo, M., Maynord, S., Miller, J., and Reible, D. 1998. "Guidance for In-Situ Subaqueous Capping of Contaminated Sediments," EPA 905-896-004. Great Lakes National Program Office, Chicago, IL.

[1]  Donald W. Taylor,et al.  Fundamentals of soil mechanics , 1948 .

[2]  K. Terzaghi,et al.  Soil mechanics in engineering practice , 1948 .

[3]  B. K. Hough,et al.  Basic soils engineering , 1966 .

[4]  J. Quirk,et al.  Permeability of porous solids , 1961 .

[5]  G. L. England,et al.  The Theory of One-Dimensional Consolidation of Saturated Clays , 1967 .

[6]  Robert W Neal,et al.  Evaluation of the Submerged Discharge of Dredged Material Slurry During Pipeline Dredge Operations , 1978 .

[7]  Louis J. Thibodeaux,et al.  Chemodynamics, environmental movement of chemicals in air, water, and soil , 1979 .

[8]  W. Lyman Handbook of chemical property estimation methods , 1982 .

[9]  H. Togashi Sand Overlaying for Sea Bottom Sediment Improvement by Conveyor Barge , 1983 .

[10]  J. O'Connor,et al.  Dredging Operations Technical Support Program. Evaluation of the 1980 Capping Operations at the Experimental Mud Dump Site, New York Bight Apex. , 1983 .

[11]  Sand Overlaying for Bottom Sediment Improvement by Sand Spreader , 1983 .

[12]  J. S. Jeris,et al.  Diffusion and partitioning of hexachlorobiphenyl in sediments. , 1985, Environmental science & technology.

[13]  Forum to Review Confined Disposal Facilities for Dredged Materials in the Great Lakes.: Report of the Dredging Subcommittee to the Great Lakes Water Quality Board , 1986 .

[14]  J. Bear,et al.  Modeling groundwater flow and pollution , 1987 .

[15]  Environmental Effects of Dredging: Engineering Considerations for Capping Subaqueous Dredged Material Deposits -- Design Concepts and Placement Techniques. , 1987 .

[16]  Clifford Goodman,et al.  American Society for Testing and Materials , 1988 .

[17]  D. Hood,et al.  Scientific monitoring strategies for ocean waste disposal , 1989 .

[18]  R. A. Shafer,et al.  Evaluation of dredged material disposal alternatives for US Navy homeport at Everett, Washington. Final report , 1989 .

[19]  J. Brannon,et al.  Consolidation and contaminant migration in a capped dredged material deposit , 1990 .

[20]  New Bedford Harbor Superfund Project, Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. Report 12. Executive Summary , 1990 .

[21]  Numerical modelling for the prediction of sedimentary improvement by sand capping over a contaminated seabed , 1991 .

[22]  Timothy D. Stark Program Documentation and User's Guide: PCDDF89, Primary Consolidation and Desiccation of Dredged Fill. , 1991 .

[23]  Calcite covering of sediment as a possible way of curbing blue-green algae , 1992 .

[24]  Louis J. Thibodeaux,et al.  Efficiency of capping contaminated sediments in situ. 2. Mathematics of diffusion-adsorption in the capping layer , 1993 .

[25]  Jack Fowler,et al.  Dredged Material Filled Geotextile Containers , 1993 .

[26]  M. Taniguchi,et al.  Continuous Measurements of Ground‐Water Seepage Using an Automatic Seepage Meter , 1993 .

[27]  C. Blain,et al.  ADCIRC: An Advanced Three-Dimensional Circulation Model for Shelves, Coasts, and Estuaries. Report 5. A Tropical Storm Database for the East and Gulf of Mexico Coasts of the United States. , 1994 .

[28]  Armand J. Silva,et al.  Geotechnical Analysis of Capped Dredged Material Mounds , 1994 .

[29]  D. Resio,et al.  Empirical Guidance for Siting Berms to Promote Stability or Nourishment Benefits , 1994 .

[30]  Norman W. Scheffner,et al.  LTFATE: A model to investigate the long-term fate and stability of dredged material disposal sites. User`s guide. Final report , 1995 .

[31]  K. Valsaraj,et al.  Pollutant fluxes to aquatic systems via bed-sediment processes , 1995 .

[32]  A. Zeman,et al.  Preliminary Results of Demonstration Capping Project in Hamilton Harbour , 1997 .

[33]  Gregory L. Williams,et al.  Guidance for Subaqueous Dredged Material Capping. , 1998 .