Effect of turbine wake on optimal generation schedule and transmission losses in wind integrated power system

Abstract The aim of this paper is to study the effect of turbine wake on economic load dispatch (ED) of power system having substantial wind power capacity. The loss of power due to wind turbine wake is included in the proposed model. The ED problem is solved by Gbest guided artificial bee colony algorithm (GABC) to determine the optimum generation schedule of thermal units. The simulation results for 20 unit test system without considering wind power are presented to prove the superiority of the GABC-algorithm over previously reported methods. Finally the effect of wind speed variations, wind shade area and turbine spacing on fuel cost and transmission losses is analyzed considering modified 20 unit test system.

[1]  Sam Kwong,et al.  Gbest-guided artificial bee colony algorithm for numerical function optimization , 2010, Appl. Math. Comput..

[2]  Taher Niknam,et al.  A new evolutionary algorithm for non-linear economic dispatch , 2011, Expert Syst. Appl..

[3]  Torben J. Larsen,et al.  Simulation of shear and turbulence impact on wind turbine performance , 2010 .

[4]  Eric S. Fraga,et al.  Mathematical programming formulations for non-smooth and non-convex electricity dispatch problems , 2013 .

[5]  S. Roy,et al.  Inclusion of Short Duration Wind Variations in Economic Load Dispatch , 2012, IEEE Transactions on Sustainable Energy.

[6]  F. Trivellato,et al.  The ideal power curve of small wind turbines from field data , 2012 .

[7]  J. D. Glover,et al.  Improved cost functions for economic dispatch compensations (on power systems) , 1991 .

[8]  Gunner Chr. Larsen,et al.  A Simple Wake Calculation Procedure , 1988 .

[9]  Shuhui Li,et al.  Using neural networks to estimate wind turbine power generation , 2001 .

[10]  A. Y. Abdelaziz,et al.  Economic Dispatch Using an Enhanced Hopfield Neural Network , 2008 .

[11]  Thomas Haugsten Hansen Offshore Wind Farm Layouts : Performance Comparison for a 540 MW Offshore Wind Farm , 2009 .

[12]  Wilsun Xu,et al.  Economic Load Dispatch Constrained by Wind Power Availability: A Here-and-Now Approach , 2010, IEEE Transactions on Sustainable Energy.

[13]  Leandro dos Santos Coelho,et al.  Solving economic load dispatch problems in power systems using chaotic and Gaussian particle swarm optimization approaches , 2008 .

[14]  Allen J. Wood,et al.  Power Generation, Operation, and Control , 1984 .

[15]  Abbas Rabiee,et al.  Erratum to Continuous quick group search optimizer for solving non-convex economic dispatch problems , 2013 .

[16]  J. F. Ainslie,et al.  CALCULATING THE FLOWFIELD IN THE WAKE OF WIND TURBINES , 1988 .

[17]  Sakti Prasad Ghoshal,et al.  Seeker optimisation algorithm: application to the solution of economic load dispatch problems , 2011 .

[18]  K. Deb An Efficient Constraint Handling Method for Genetic Algorithms , 2000 .

[19]  N. Jensen A note on wind generator interaction , 1983 .

[20]  David C. Yu,et al.  An Economic Dispatch Model Incorporating Wind Power , 2008, IEEE Transactions on Energy Conversion.

[21]  V. Miranda,et al.  Economic dispatch model with fuzzy wind constraints and attitudes of dispatchers , 2005, IEEE Transactions on Power Systems.

[22]  Walid Husien,et al.  Effect of the wake behind wind rotor on optimum energy output of wind farms , 2013 .

[23]  Abbas Rabiee,et al.  Continuous quick group search optimizer for solving non-convex economic dispatch problems , 2012 .

[24]  Xian Liu,et al.  Economic Load Dispatch Constrained by Wind Power Availability: A Wait-and-See Approach , 2010, IEEE Transactions on Smart Grid.

[25]  Ching-Tzong Su,et al.  New approach with a Hopfield modeling framework to economic dispatch , 2000 .

[26]  G. Sheblé,et al.  Power generation operation and control — 2nd edition , 1996 .

[27]  Eduard Muljadi,et al.  Pitch-controlled variable-speed wind turbine generation , 1999, Conference Record of the 1999 IEEE Industry Applications Conference. Thirty-Forth IAS Annual Meeting (Cat. No.99CH36370).

[28]  P. K. Chattopadhyay,et al.  Solving complex economic load dispatch problems using biogeography-based optimization , 2010, Expert Syst. Appl..

[29]  A. H. Murphy,et al.  Time Series Models to Simulate and Forecast Wind Speed and Wind Power , 1984 .

[30]  D. Karaboga,et al.  On the performance of artificial bee colony (ABC) algorithm , 2008, Appl. Soft Comput..