Two-stage chance-constrained staffing with agent recourse for multi-skill call centers

We consider a stochastic staffing problem with uncertain arrival rates. The objective is to minimize the total cost of agents under some chance constraints, defined over the randomness of the service level in a given time period. In the first stage, an initial staffing must be determined in advance based on imperfect forecast of the arrival rates. At a later time, when the forecast becomes more accurate, this staffing can be corrected with recourse actions, by adding or removing agents at the price of some penalty costs. We present a method that combines simulation, mixed integer programming, and cut generation to solve this problem.

[1]  Pierre L'Ecuyer,et al.  Modeling Daily Arrivals to a Telephone Call Center , 2003, Manag. Sci..

[2]  Michel Gendreau,et al.  Optimizing daily agent scheduling in a multiskill call center , 2010, Eur. J. Oper. Res..

[3]  Pierre L'Ecuyer,et al.  Modeling and forecasting call center arrivals: A literature survey and a case study , 2015 .

[4]  Sandjai Bhulai,et al.  A Simple Staffing Method for Multiskill Call Centers , 2008, Manuf. Serv. Oper. Manag..

[5]  Oualid Jouini,et al.  Performance indicators for call centers with impatient customers , 2013 .

[6]  Robert B. Cooper,et al.  An Introduction To Queueing Theory , 2016 .

[7]  Armann Ingolfsson,et al.  The application of forecasting techniques to modeling emergency medical system calls in Calgary, Alberta , 2007, Health care management science.

[8]  Pierre L'Ecuyer,et al.  Forecasting Call Center Arrivals: Fixed-Effects, Mixed-Effects, and Bivariate Models , 2012, Manuf. Serv. Oper. Manag..

[9]  Laureano Fernando Escudero Bueno,et al.  A two-stage stochastic integer programming approach , 2005 .

[10]  Gary W. Loveman,et al.  Putting the Service-Profit Chain to Work , 1994 .

[11]  J. Michael Harrison,et al.  A Method for Staffing Large Call Centers Based on Stochastic Fluid Models , 2005, Manuf. Serv. Oper. Manag..

[12]  Terry P. Harrison,et al.  A simulation based scheduling model for call centers with uncertain arrival rates , 2008, 2008 Winter Simulation Conference.

[13]  Sandjai Bhulai,et al.  Simple Methods for Shift Scheduling in Multiskill Call Centers , 2008, Manuf. Serv. Oper. Manag..

[14]  Terry P. Harrison,et al.  A stochastic programming model for scheduling call centers with global Service Level Agreements , 2010, Eur. J. Oper. Res..

[15]  Pierre L'Ecuyer,et al.  Staffing Multiskill Call Centers via Linear Programming and Simulation , 2008, Manag. Sci..

[16]  Haipeng Shen,et al.  Parametric Forecasting and Stochastic Programming Models for Call-Center Workforce Scheduling , 2015, Manuf. Serv. Oper. Manag..

[17]  Ward Whitt,et al.  A Staffing Algorithm for Call Centers with Skill-Based Routing , 2005, Manuf. Serv. Oper. Manag..

[18]  Pierre L'Ecuyer,et al.  A Java library for simulating contact centers , 2005, Proceedings of the Winter Simulation Conference, 2005..

[19]  Avishai Mandelbaum,et al.  Telephone Call Centers: Tutorial, Review, and Research Prospects , 2003, Manuf. Serv. Oper. Manag..

[20]  F. Al-Shamali,et al.  Author Biographies. , 2015, Journal of social work in disability & rehabilitation.

[21]  Pierre L'Ecuyer,et al.  Staffing multi-skill call centers via search methods and a performance approximation , 2009 .

[22]  Sanjay Mehrotra,et al.  A Two-Stage Stochastic Integer Programming Approach to Integrated Staffing and Scheduling with Application to Nurse Management , 2015, Oper. Res..

[23]  Itay Gurvich,et al.  Staffing Call Centers with Uncertain Demand Forecasts: A Chance-Constrained Optimization Approach , 2010, Manag. Sci..

[24]  Wyean Chan Optimisation des horaires des agents et du routage des appels dans les centres d’appels , 2014 .

[25]  J. Michael Harrison,et al.  Design and Control of a Large Call Center: Asymptotic Analysis of an LP-Based Method , 2006, Oper. Res..

[26]  Pierre L'Ecuyer,et al.  Dynamic Call Center Routing Policies Using Call Waiting and Agent Idle Times , 2014, Manuf. Serv. Oper. Manag..

[27]  Pierre L'Ecuyer,et al.  Rate-Based Daily Arrival Process Models with Application to Call Centers , 2016, Oper. Res..

[28]  J. E. Kelley,et al.  The Cutting-Plane Method for Solving Convex Programs , 1960 .

[29]  Avishai Mandelbaum,et al.  Designing a Call Center with Impatient Customers , 2002, Manuf. Serv. Oper. Manag..

[30]  R. Wets,et al.  L-SHAPED LINEAR PROGRAMS WITH APPLICATIONS TO OPTIMAL CONTROL AND STOCHASTIC PROGRAMMING. , 1969 .

[31]  Shane G. Henderson,et al.  Optimizing Call Center Staffing Using Simulation and Analytic Center Cutting-Plane Methods , 2008, Manag. Sci..