Optimal Booster Station Design and Operation under Uncertain Load

Given industrial applications, the costs for the operation and maintenance of a pump system typically far exceed its purchase price. For finding an optimal pump configuration which minimizes not only investment, but life-cycle costs, methods like Technical Operations Research which is based on Mixed-Integer Programming can be applied. However, during the planning phase, the designer is often faced with uncertain input data, e.g. future load demands can only be estimated. In this work, we deal with this uncertainty by developing a chance-constrained two-stage (CCTS) stochastic program. The design and operation of a booster station working under uncertain load demand are optimized to minimize total cost including purchase price, operation cost incurred by energy consumption and penalty cost resulting from water shortage. We find optimized system layouts using a sample average approximation (SAA) algorithm, and analyze the results for different risk levels of water shortage. By adjusting the risk level, the costs and performance range of the system can be balanced, and thus the system's resilience can be engineered.

[1]  A. Charnes,et al.  Chance-Constrained Programming , 1959 .

[2]  Patrizia Beraldi,et al.  A Solution Approach for Two-Stage Stochastic Nonlinear Mixed Integer Programs , 2009, Algorithmic Oper. Res..

[3]  Andreas Schmitt,et al.  Resilience in Mechanical Engineering - A Concept for Controlling Uncertainty during Design, Production and Usage Phase of Load-Carrying Structures , 2018, Applied Mechanics and Materials.

[4]  Tamás Szántai,et al.  Stochastic programming in water management: A case study and a comparison of solution techniques , 1991 .

[5]  Benjamin Müller,et al.  The SCIP Optimization Suite 5.0 , 2017, 2112.08872.

[6]  T. F. Gross,et al.  An Analytical Approach for the Optimal Operation of Pumps in Booster Systems , 2016 .

[7]  Peter F. Pelz,et al.  Designing Pump Systems by Discrete Mathematical Topology Optimization: The Artificial Fluid Systems Designer (AFSD) , 2012 .

[8]  B. Norman,et al.  A solution to the stochastic unit commitment problem using chance constrained programming , 2004, IEEE Transactions on Power Systems.

[9]  Peter F. Pelz,et al.  Developing a Control Strategy for Booster Stations under Uncertain Load , 2015 .

[10]  Andrea Lodi,et al.  Mathematical programming techniques in water network optimization , 2015, Eur. J. Oper. Res..

[11]  Peter F. Pelz,et al.  Multicriterial Design of a Hydrostatic Transmission System Via Mixed-Integer Programming , 2015, OR.

[12]  Peter F. Pelz,et al.  Multicriterial Optimization of Technical Systems Considering Multiple Load and Availability Scenarios , 2015 .

[13]  Alexander Shapiro,et al.  Sample Average Approximation Method for Chance Constrained Programming: Theory and Applications , 2009, J. Optimization Theory and Applications.

[14]  Wencong Su,et al.  A Literature Review of Stochastic Programming and Unit Commitment , 2015 .

[15]  J. Lofberg,et al.  YALMIP : a toolbox for modeling and optimization in MATLAB , 2004, 2004 IEEE International Conference on Robotics and Automation (IEEE Cat. No.04CH37508).

[16]  A. Shapiro Monte Carlo sampling approach to stochastic programming , 2003 .

[17]  Alexander Shapiro,et al.  Lectures on Stochastic Programming: Modeling and Theory , 2009 .

[18]  Yongpei Guan,et al.  A Chance-Constrained Two-Stage Stochastic Program for Unit Commitment With Uncertain Wind Power Output , 2012, IEEE Transactions on Power Systems.

[19]  Shouqi Yuan,et al.  Cyclic Spectral Analysis of Vibration Signals for Centrifugal Pump Fault Characterization , 2018, IEEE Sensors Journal.