A Study on the Design Procedure of Mega Foundations for a High-rise Building Using Bi-Directional High Pressure Pile Load Test (BDH PLT)

In this paper, a case of a high-rise building supported by a large-diameter drilled shaft socketed in a weathered ground has been studied. The design case of pile foundation presented in this paper could be a representative example of execution of pile design through three(3) design stages of "preliminary design-proof test-supplementary design". As proof test, two(2) BDH PLT (Bi-directional High Pressure Pile Load Test) were performed at the early construction stage. By following the design process of this way, the economic pile design could be carried out and a large amount of construction cost saving could be realized.