KICT 오픈 하우징 실험주택의 리모델링 사례 연구
暂无分享,去创建一个
The frist Experimental Open Housing in Korea opened in June 2000 at KICT, which is designed for future housing remodeling and flexibility. The remodeling type is C Type(3LDK) which is one of the three Experimental Open Housing units. The remodeling started in July 2003 as a preparation stage. It took 3 months to remove the existing interior components and to complete remodeling. The purpose of the remodeling is to check remodeling process and to find out problems, further more, to establish design guidelines, to establish construction methods, and to develope components for easy housing remodeling. During the survey, we studied the overall removal procedure of Unit bath room, interior components and materials, and plumbing pipelines and electrical wires of the existing units (C Type), and we observed the reinstall procedure of the storing floor system, interior components, and the utility system. We discussed the problems of the procedures and suggested how to solve the problems. As a result, we find the efficiency of the design and construction methods that considers remodelling.