Manufacturing systems operation: Dispatch rules versus intelligent control
暂无分享,去创建一个
[1] Marc E. Posner,et al. Minimizing Weighted Completion Times with Deadlines , 1985, Oper. Res..
[2] E. Barkmeyer,et al. A computer architecture for small-batch manufacturing: Industry will profit from a system that defines the functions of its component-manufacturing modules and standardizes their interfaces , 1983, IEEE Spectrum.
[3] J. A. Buzacott,et al. Flexible manufacturing systems: a review of analytical models , 1986 .
[4] Steven Nahmias,et al. Optimal Policy for a Two-Stage Assembly System under Random Demand , 1985, Oper. Res..
[5] R. Suri. New Techniques for Modelling and Control of Flexible Automated Manufacturing Systems , 1981 .
[6] Michael Pinedo,et al. Scheduling Jobs with Exponentially Distributed Processing Times and Intree Precedence Constraints on Two Parallel Machines , 1985, Oper. Res..
[7] Gabriel R. Bitran,et al. ON THE DESIGN OF HIERARCHICAL PRODUCTION PLANNING SYSTEMS , 1977 .
[8] Kathryn E. Stecke,et al. The Optimality of Unbalancing Both Workloads and Machine Group Sizes in Closed Queueing Networks of Multiserver Queues , 1985, Oper. Res..
[9] Robert E. Shannon,et al. Simulation: A Survey with Research Suggestions , 1975 .
[10] Stanley B. Gershwin,et al. An algorithm for the computer control of a flexible manufacturing system , 1983 .
[11] Michael Pinedo,et al. Stochastic Scheduling with Release Dates and Due Dates , 1983, Oper. Res..
[12] Joseph D. Blackburn,et al. Improved heuristics for multistage requirements planning systems , 1982 .
[13] Stanley Gershwin,et al. An algorithm for the computer control of production in a flexible manufacturing system , 1981, 1981 20th IEEE Conference on Decision and Control including the Symposium on Adaptive Processes.
[14] Charles R. McLean,et al. A Computer Architecture for Small Batch Manufacturing , 1983 .
[15] George Chryssolouris,et al. Decision making on the factory floor: An integrated approach to process planning and scheduling , 1984 .
[16] Ezey M. Dar-El,et al. Job shop scheduling—A systematic approach , 1982 .
[17] Chris N. Potts,et al. A Branch and Bound Algorithm for the Total Weighted Tardiness Problem , 1985, Oper. Res..
[18] Stanley B. Gershwin,et al. Short term production scheduling of an automated manufacturing facility , 1984, The 23rd IEEE Conference on Decision and Control.
[19] Christopher H. Nevison,et al. Dynamic Lot-Sizing When Demand Timing Is Uncertain , 1984, Oper. Res..
[20] Stephen C. Graves,et al. A Review of Production Scheduling , 1981, Oper. Res..
[21] William L. Maxwell,et al. Theory of scheduling , 1967 .
[22] Christopher H. Nevison. A Cost Adjustment Heuristic for Dynamic Lot-Sizing with Uncertain Demand Timing , 1985, Oper. Res..