Manufacturing systems operation: Dispatch rules versus intelligent control

[1]  Marc E. Posner,et al.  Minimizing Weighted Completion Times with Deadlines , 1985, Oper. Res..

[2]  E. Barkmeyer,et al.  A computer architecture for small-batch manufacturing: Industry will profit from a system that defines the functions of its component-manufacturing modules and standardizes their interfaces , 1983, IEEE Spectrum.

[3]  J. A. Buzacott,et al.  Flexible manufacturing systems: a review of analytical models , 1986 .

[4]  Steven Nahmias,et al.  Optimal Policy for a Two-Stage Assembly System under Random Demand , 1985, Oper. Res..

[5]  R. Suri New Techniques for Modelling and Control of Flexible Automated Manufacturing Systems , 1981 .

[6]  Michael Pinedo,et al.  Scheduling Jobs with Exponentially Distributed Processing Times and Intree Precedence Constraints on Two Parallel Machines , 1985, Oper. Res..

[7]  Gabriel R. Bitran,et al.  ON THE DESIGN OF HIERARCHICAL PRODUCTION PLANNING SYSTEMS , 1977 .

[8]  Kathryn E. Stecke,et al.  The Optimality of Unbalancing Both Workloads and Machine Group Sizes in Closed Queueing Networks of Multiserver Queues , 1985, Oper. Res..

[9]  Robert E. Shannon,et al.  Simulation: A Survey with Research Suggestions , 1975 .

[10]  Stanley B. Gershwin,et al.  An algorithm for the computer control of a flexible manufacturing system , 1983 .

[11]  Michael Pinedo,et al.  Stochastic Scheduling with Release Dates and Due Dates , 1983, Oper. Res..

[12]  Joseph D. Blackburn,et al.  Improved heuristics for multistage requirements planning systems , 1982 .

[13]  Stanley Gershwin,et al.  An algorithm for the computer control of production in a flexible manufacturing system , 1981, 1981 20th IEEE Conference on Decision and Control including the Symposium on Adaptive Processes.

[14]  Charles R. McLean,et al.  A Computer Architecture for Small Batch Manufacturing , 1983 .

[15]  George Chryssolouris,et al.  Decision making on the factory floor: An integrated approach to process planning and scheduling , 1984 .

[16]  Ezey M. Dar-El,et al.  Job shop scheduling—A systematic approach , 1982 .

[17]  Chris N. Potts,et al.  A Branch and Bound Algorithm for the Total Weighted Tardiness Problem , 1985, Oper. Res..

[18]  Stanley B. Gershwin,et al.  Short term production scheduling of an automated manufacturing facility , 1984, The 23rd IEEE Conference on Decision and Control.

[19]  Christopher H. Nevison,et al.  Dynamic Lot-Sizing When Demand Timing Is Uncertain , 1984, Oper. Res..

[20]  Stephen C. Graves,et al.  A Review of Production Scheduling , 1981, Oper. Res..

[21]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[22]  Christopher H. Nevison A Cost Adjustment Heuristic for Dynamic Lot-Sizing with Uncertain Demand Timing , 1985, Oper. Res..