Model and algorithm of integrated lot planning for steelmaking-continous casting-hot rolling
暂无分享,去创建一个
[1] Lixin Tang,et al. A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex , 2000, Eur. J. Oper. Res..
[2] Wang Ding-wei,et al. Dynamic Programming Algorithm and Optimization Model of Charge Design for Steel-Making , 2006 .
[3] Pan Xuejun. Integrated method of steel-making and continuous casting planning , 2007 .
[4] T. Stützle,et al. MAX-MIN Ant System and local search for the traveling salesman problem , 1997, Proceedings of 1997 IEEE International Conference on Evolutionary Computation (ICEC '97).
[5] Pierre Hansen,et al. Variable Neighborhood Search , 2018, Handbook of Heuristics.
[6] Li Tie-ke. Constraint satisfaction algorithm of batch planning for steel making-continuous casting-hot rolling , 2007 .
[7] Zhu Bao-lin. Integrated Planning for Steelmaking-Hot Rolling , 2006 .
[8] Yu-Wang Chen,et al. Hybrid evolutionary algorithm with marriage of genetic algorithm and extremal optimization for production scheduling , 2008 .
[9] Peter I. Cowling,et al. Integration of continuous caster and hot strip mill planning for steel production , 2000 .
[10] Li Tieke. Model and algorithm of hot rolling batch planning , 2010 .
[11] Liu Shi-xin,et al. Model and algorithm for solving hot strip rolling batch planning problems , 2007 .
[12] Tang Li-xin,et al. ANALYSIS OF MODELING FACTOR OF INTEGRATED LOT PLANNING FOR SM CC HRM , 2000 .
[13] Peter Cowling,et al. A flexible decision support system for steel hot rolling mill scheduling , 2003, Comput. Ind. Eng..
[14] Ust Beijing. Optimization Method for Hot Charge Rolling Manufacture Plan , 2002 .