Drillstem tests aid tubing and gas lift designs

The objective of this study is to establish a procedure by which tubing size selection and gas lift design are accomplished. Two example problems are solved, one in which the well will flow by natural means and the other in which artificial life is required at the onset of production, to illustrate the ideas and procedure presented. 13 refs.