Mixed integer programming approaches to partial disassembly line balancing and sequencing problem

Abstract Product recovery has received greater attention in recent years mainly due to increased environmental awareness of consumers and stricter environmental regulations imposed by governments. In product recovery, disassembly of the product into its constituent parts is the most significant activity and generally performed on a disassembly line. During disassembly, a complete or partial disassembly of the product may be preferred. In complete disassembly, all parts must be disassembled, while partial disassembly allows to disassemble a subset of parts (e.g., the ones with relatively high revenues). This study deals with a partial disassembly line balancing and sequencing (PDLBS) problem considering revenues of parts to be disassembled, general workstation cost, additional cost of workstation(s) with hazardous parts, and cost of direction changes. For the PDLBS problem, a generic mixed integer programming (MIP) model, with the aim of maximizing total profit, is developed. To strengthen the MIP formulation, two sets of valid inequalities are proposed. The computational results show that the MIP model with valid inequalities is able to provide optimal solutions for the PDLBS problems with up to 30 tasks. To obtain near-optimal solutions for large-sized problems, a MIP-based solution approach is proposed. The proposed approach decomposes the entire MIP model into selection and assignment (SA) and sequencing (SEQ) models. The SA model is an exact relaxation of the MIP model (with valid inequalities) obtained by removing all the sequencing variables and constraints. Hence, SA model also produces an efficient upper bound for the PDLBS problem. The SEQ model, accordingly, aims to find an optimal sequence of tasks subject to the fixed selection and assignment of tasks provided by the SA model. The computational results show that the proposed MIP-based solution approach provides efficient solutions with small optimality gaps for large-sized problems.

[1]  Nurcan Deniz,et al.  An extended review on disassembly line balancing with bibliometric & social network and future study realization analysis , 2019, Journal of Cleaner Production.

[2]  Xinyu Li,et al.  A multi-objective algorithm for U-shaped disassembly line balancing with partial destructive mode , 2020, Neural Computing and Applications.

[3]  F. Tevhide Altekin,et al.  Remedial actions for disassembly lines with stochastic task times , 2016, Comput. Ind. Eng..

[4]  Can Akkan,et al.  Task-failure-driven rebalancing of disassembly lines , 2012 .

[5]  Alexandre Dolgui,et al.  Disassembly Line Balancing Problem with Fixed Number of Workstations under Uncertainty , 2014 .

[6]  Alexandre Dolgui,et al.  Disassembly Line Balancing and Sequencing under Uncertainty , 2014 .

[7]  Mehmet Ali Ilgin,et al.  Disassembly line balancing with sequencing decisions: A mixed integer linear programming model and extensions , 2019, Journal of Cleaner Production.

[8]  Sencer Yeralan,et al.  A disassembly line balancing problem with fixed number of workstations , 2016, Eur. J. Oper. Res..

[9]  Dong Li,et al.  Partial disassembly line balancing under uncertainty: robust optimisation models and an improved migrating birds optimisation algorithm , 2020, Int. J. Prod. Res..

[10]  Levent Kandiller,et al.  Profit-oriented disassembly-line balancing , 2008 .

[11]  Surendra M. Gupta,et al.  Disassembly to order system under uncertainty , 2006 .

[12]  Eren Özceylan,et al.  Disassembly line balancing problem: a review of the state of the art and future directions , 2019, Int. J. Prod. Res..

[13]  Eren Özceylan,et al.  Resource Constrained Disassembly Line Balancing Problem , 2016 .

[14]  Beatrice Lazzerini,et al.  EMOGA: A Hybrid Genetic Algorithm With Extremal Optimization Core for Multiobjective Disassembly Line Balancing , 2018, IEEE Transactions on Industrial Informatics.

[15]  Alexandre Dolgui,et al.  A sample average approximation method for disassembly line balancing problem under uncertainty , 2014, Comput. Oper. Res..

[16]  Alexandre Dolgui,et al.  Profit-oriented partial disassembly line design: dealing with hazardous parts and task processing times uncertainty , 2018, Int. J. Prod. Res..

[17]  Beatrice Lazzerini,et al.  End-of-life product disassembly with priority-based extraction of dangerous parts , 2020 .

[18]  Surendra M. Gupta,et al.  Use of MCDM techniques in environmentally conscious manufacturing and product recovery: State of the art , 2015 .

[19]  MengChu Zhou,et al.  Modeling and Planning for Dual-Objective Selective Disassembly Using and/or Graph and Discrete Artificial Bee Colony , 2019, IEEE Transactions on Industrial Informatics.

[20]  Alexandre Dolgui,et al.  Dealing with uncertainty in disassembly line design , 2014 .

[21]  S. Nickel,et al.  IBM ILOG CPLEX Optimization Studio , 2020 .

[22]  Chao Guan,et al.  Multi-objective partial parallel disassembly line balancing problem using hybrid group neighbourhood search algorithm , 2020 .

[23]  Liang Gao,et al.  A multi-objective discrete flower pollination algorithm for stochastic two-sided partial disassembly line balancing problem , 2019, Comput. Ind. Eng..

[24]  Chaoyong Zhang,et al.  An improved gravitational search algorithm for profit-oriented partial disassembly line balancing problem , 2017, Int. J. Prod. Res..

[25]  Alexandre Dolgui,et al.  Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem , 2014 .

[26]  Xinyu Li,et al.  Modeling and optimization of multi-objective partial disassembly line balancing problem considering hazard and profit , 2019, Journal of Cleaner Production.

[27]  Xinyu Li,et al.  Energy consumption and profit-oriented disassembly line balancing for waste electrical and electronic equipment , 2020 .

[28]  Alexandre Dolgui,et al.  Chance Constrained Programming Model for Stochastic Profit-Oriented Disassembly Line Balancing in the Presence of Hazardous Parts , 2013, APMS.

[29]  Xinyu Li,et al.  Partial disassembly line balancing for energy consumption and profit under uncertainty , 2019, Robotics Comput. Integr. Manuf..