Time consumption analysis of the mechanized cut-to-length harvesting system
暂无分享,去创建一个
[1] Edwin S. Miyata,et al. Application of work sampling technique to analyze logging operations. , 1981 .
[2] Pertti Harstela. Principle of comparative time studies in mechanized forest work , 1988 .
[3] B. Brunberg,et al. Basic data for productivity standards for single-grip harvesters in thinning , 1989 .
[4] I. Samset. Some observations on time and performance studies in forestry , 1990 .
[5] Rolf Björheden,et al. Basic Time Concepts For International Comparisons of Time Study Reports , 1991 .
[6] R. W. Brinker,et al. Productivity of a Scandinavian cut-to-length system while second thinning pine plantations , 1993 .
[7] J. F. McNeel,et al. Modelling Harvester-Forwarder System Performance in a Selection Harvest , 1994 .
[8] Pete Bettinger,et al. Thinning Productivity and Cost for a Mechanized Cut-to-Length System in the Northwest Pacific Coast Region of the USA , 1994 .
[9] Bryce J. Stokes,et al. Comparison of two thinning systems. Part 1. Stand and site impacts , 1995 .
[10] T. Gullberg,et al. Evaluating Operator-Machine Interactions in Comparative Time Studies , 1995 .
[11] T. Gullberg. Time consumption model for off-road extraction of shortwood , 1997 .
[12] L. D. Kellogg,et al. Simulating a harvester-forwarder softwood thinning : A software evaluation , 1997 .
[13] Robert A. Tufts,et al. Productivity and cost of the ponsse 15-series, cust-to-length harvesting systems in southern pine plantations , 1997 .
[14] Matti Sirèn,et al. Hakkuukonetyö, sen korjuujälki ja puustovaurioiden ennustaminen. , 1998 .
[15] Jingxin Wang,et al. An Interactive Simulation System for Modeling Stands, Harvests, and Machines , 1999 .
[16] Tomas Nordfjell,et al. Productivity and Costs in Shelterwood Harvesting , 2000 .
[17] Matti Sirén,et al. Productivity and Costs of Thinning Harvesters and Harvester-Forwarders , 2003 .
[18] Lars Eliasson,et al. Productivity in Final Felling and Thinning for a Combined Harvester-Forwarder (Harwarder) , 2003 .
[19] Bruce Talbot,et al. Assessing the Utility of Two Integrated Harvester-Forwarder Machine Concepts Through Stand-Level Simulation , 2003 .
[20] Jori Uusitalo,et al. Characteristics and Significance of a Harvester Operators’ Working Technique in Thinnings , 2004 .
[21] Metsäteho Oy,et al. Productivity and Cutting Costs of Thinning Harvesters , 2004 .
[22] Heikki Ovaskainen,et al. Comparison of harvester work in forest and simulator environments , 2005 .
[23] Y. Nuutinen,et al. The effect of log bunching on forwarding efficiency , 2005 .
[24] Pekka Ranta,et al. Hakkuukoneenkuljettajan hiljaisen tiedon merkitys hakkuutulokseen työpistetasolla. , 2005 .