Analysis of the minimum activation period of batteries in frequency containment reserve

The capacity of battery energy storage systems (BESS) to adjust power output swiftly and precisely makes them ideal for provision of frequency containment reserve (FCR), the fastest type of frequency control. Since BESS are only recent providers of FCR, there is uncertainty in the applicable requirements while regulation adapts to BESS. In this paper, the minimum activation period as an unresolved regulation issue is investigated. Therefore, two generic methods to calculate the resulting limits of the normal operation range are introduced (considering and not considering corrective power) and compared for a minimum activation period of 15 and 30 minutes. The operation of BESS providing FCR was simulated based on the two calculation methods for numerous system designs. Results of these simulations demonstrate the significance of the regulation on BESS operation and design. Shorter minimum activation period reduces required corrective energy and increase income potential from FCR significantly.

[1]  John D. Boyes,et al.  Lessons Learned from the Puerto Rico Battery Energy Storage System , 1999 .

[2]  Johanna L. Mathieu,et al.  Maximizing the potential of energy storage to provide fast frequency control , 2013, IEEE PES ISGT Europe 2013.

[3]  H.-J. Kunisch,et al.  Battery Energy Storage Another Option for Load-Frequency-Control and Instantaneous Reserve , 1986, IEEE Transactions on Energy Conversion.

[4]  Goran Andersson,et al.  Power and energy capacity requirements of storages providing frequency control reserves , 2013, 2013 IEEE Power & Energy Society General Meeting.

[5]  B. Nykvist,et al.  Rapidly falling costs of battery packs for electric vehicles , 2015 .

[6]  Thomas Erge,et al.  Trends in the German PCR market: Perspectives for battery systems , 2015, 2015 12th International Conference on the European Energy Market (EEM).

[7]  Andreas Ulbig,et al.  Impact of Frequency Control Reserve Provision by Storage Systems on Power System Operation , 2014 .

[8]  Christoph Weber,et al.  Pricing of reserves: Valuing system reserve capacity against spot prices in electricity markets☆ , 2008 .

[9]  A. Oudalov,et al.  Optimizing a Battery Energy Storage System for Primary Frequency Control , 2007, IEEE Transactions on Power Systems.

[10]  D. Kottick,et al.  Battery energy storage for frequency regulation in an island power system , 1993 .

[11]  Christof Wittwer,et al.  Optimal Provision of Primary Frequency Control with Battery Systems by Exploiting All Degrees of Freedom within Regulation , 2016 .

[12]  Axel Ockenfels,et al.  Economics and design of balancing power markets in Germany , 2014 .