Intelligent scheduling and planning systems for telecommunications resource management
暂无分享,去创建一个
[1] Barry Richards,et al. Nogood Backmarking with Min-Conflict Repair in Constraint Satisfaction and Optimization , 1994, PPCP.
[2] Austin Tate,et al. Open planning, scheduling and constraint management architectures , 1995 .
[3] Edward Tsang. Scheduling techniques: a comparative study , 1995 .
[4] Mark Wallace,et al. Constraint logic programming for scheduling and planning , 1995 .
[5] Patrick Prosser,et al. A distributed asynchronous system for predictive and reactive scheduling , 1991, Artif. Intell. Eng..
[6] R. Laithwaite. Work allocation challenges and solutions in a large-scale work management environment , 1995 .
[7] I B Crabtree,et al. Planning Beneficial and Profitable Network Upgrade Paths , 1996 .
[8] Yuejun Jiang,et al. Ng-backmarking: an algorithm for constraint satisfaction , 1995 .
[9] N. Azarmi. A knowledge based resource scheduler for network maintenance , 1991 .
[10] Mark S. Fox,et al. Constraint-Directed Search: A Case Study of Job-Shop Scheduling , 1987 .
[11] Patrick Prosser,et al. Stochastic techniques for resource management , 1995 .
[12] J. Simpson,et al. Experience in applying OR techniques to the solution of practical resource management problems , 1995 .
[13] Wc Taylor,et al. Special Issue , 2000, International Journal of Recent Technology and Engineering.
[14] N. Azarmi,et al. Workforce scheduling with constraint logic programming , 1995 .