An Exact Approach for the Single Machine Scheduling Problem with Linear Early and Quadratic tardy penalties

In this paper, we consider the single machine scheduling problem with linear earliness and quadratic tardiness costs, and no machine idle time. We propose a lower bounding procedure based on the relaxation of the jobs' completion times. Optimal branch-and-bound algorithms are then presented. These algorithms incorporate the proposed lower bound, as well as an insertion-based dominance test.The branch-and-bound procedures are tested on a wide set of randomly generated problems. The computational results show that the branch-and-bound algorithms are capable of optimally solving, within reasonable computation times, instances with up to 20 jobs.

[1]  Pei-Chann Chang,et al.  A heuristic to minimize a quadratic function of job lateness on a single machine , 1998 .

[2]  Hemant V. Kher,et al.  The Production of Several Items in a Single Facility with Linearly Changing Demand Rates , 2002, Decis. Sci..

[3]  M. Azizoglu,et al.  Bicriteria scheduling problem involving total tardiness and total earliness penalties , 1991 .

[4]  Gary D. Scudder,et al.  Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..

[5]  Robert E. Tarjan,et al.  One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties , 1988, Math. Oper. Res..

[6]  Candace Arai Yano,et al.  Minimizing mean tardiness and earliness in single machine scheduling problems with unequal due-dates , 1994 .

[7]  Jeffrey Schaller Minimizing the sum of squares lateness on a single machine , 2002, Eur. J. Oper. Res..

[8]  Tapan Sen,et al.  Minimizing a weighted quadratic function of job lateness in the single machine system , 1996 .

[9]  V. Sridharan,et al.  Scheduling with Inserted Idle Time: Problem Taxonomy and Literature Review , 2000, Oper. Res..

[10]  C. Klein,et al.  Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness , 1999 .

[11]  Jorge M. S. Valente Heuristics for the single machine scheduling problem with early and quadratic tardy penalties , 2007 .

[12]  Jeffrey E. Schaller Single machine scheduling with early and quadratic tardy penalties , 2004, Comput. Ind. Eng..

[13]  Sushil K. Gupta,et al.  Minimizing a quadratic function of job lateness on a single machine , 1983 .