Optimal scheme of a sort of workshop equipment layout

The question of logistic cost related to the product in process is put forward in the manufacturing system. The shortage of present method used in the workshop equipment layout was brought forward on the basis of the some analysis. By summing up the calculating method of the equivalent flow capacity, a new scheme is put forward. Then, an example based on one enterprise is presented to verify the usefulness of the new approach. Finally, with considering sorts of the factors effected the flow of the product in process, a practical approach is given for the optimal layout of the workshop equipment.