Large-Scale Implementation of On-Line Calibration Monitoring - Issues and Possible Solutions
暂无分享,去创建一个
[1] P. F. Fantoni. A NEURO-FUZZY MODEL APPLIED TO FULL RANGE SIGNAL VALIDATION OF PWR NUCLEAR POWER PLANT DATA , 2000 .
[2] Mark A. Kramer,et al. Autoassociative neural networks , 1992 .
[3] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[4] Mario Hoffmann,et al. SIGNAL GROUPING ALGORITHM FOR AN IMPROVED ON-LINE CALIBRATION MONITORING SYSTEM , 2006 .
[5] D. E. Goldberg,et al. Genetic Algorithms in Search , 1989 .
[6] J. P. Herzog,et al. Application of a model-based fault detection system to nuclear plant signals , 1997 .
[7] R. W. King,et al. Model-based nuclear power plant monitoring and fault detection: Theoretical foundations , 1997 .
[8] Robert E. Uhrig,et al. Use of Autoassociative Neural Networks for Signal Validation , 1998, J. Intell. Robotic Syst..