Leanness estimation procedural hierarchy using interval-valued fuzzy sets (IVFS)

Purpose – Lean manufacturing is an operational strategy oriented toward achieving the shortest possible cycle time by eliminating waste. It is derived from the Toyota Production System and its key thrust is to increase the value-added work by eliminating waste and reducing incidental work. In today's competitive global marketplace, the concept of lean manufacturing has gained vital consciousness to all manufacturing sectors, their supply chains, and hence a logical measurement index system is indeed required in implementing leanness in practice. Such leanness estimation can help the enterprises to assess their existing leanness level and can compare different industries who are adapting this lean concept. The paper aims to discuss these issues. Design/methodology/approach – The present work exhibits an efficient fuzzy-based leanness assessment system using generalized interval-valued (IV) trapezoidal fuzzy numbers set. The concept of “degree of similarity” between two IV fuzzy numbers has been explored he...

[1]  José Luis Duarte Ribeiro,et al.  A framework for assessing the use of lean production practices in manufacturing cells , 2011 .

[2]  S. Vinodh,et al.  Fuzzy logic based leanness assessment and its decision support system , 2011 .

[3]  Manoj Kumar Tiwari,et al.  Lean tool selection in a die casting unit: a fuzzy-based decision support heuristic , 2006 .

[4]  Toni L. Doolen,et al.  A review of lean assessment in organizations: An exploratory study of lean practices by electronics manufacturers , 2005 .

[5]  Chien-Ho Ko Application of Lean Production System in the Construction Industry: An Empirical Study , 2010 .

[6]  Peter T. Ward,et al.  Lean manufacturing: context, practice bundles, and performance , 2003 .

[7]  Mahnaz Zarei,et al.  FOOD SUPPLY CHAIN LEANNESS USING A DEVELOPED QFD MODEL , 2011 .

[8]  S. Vinodh,et al.  Thirty criteria based leanness assessment using fuzzy logic approach , 2012 .

[9]  N. Zakuan,et al.  Lean manufacturing concept: the main factor in improving manufacturing performance - a case study , 2009, Int. J. Manuf. Technol. Manag..

[10]  A. de Korvin,et al.  Measuring the leanness of manufacturing systems-A case study of Ford Motor Company and General Motors , 2008 .

[11]  Ting-Yu Chen,et al.  A risk management method for enhancing patient safety based on interval-valued fuzzy numbers , 2011 .

[12]  P. V. Mohanram,et al.  A survey on lean practices in Indian machine tool industries , 2011 .

[13]  Kuan Yew Wong,et al.  Lean performance evaluation of manufacturing systems: A dynamic and innovative approach , 2011, WCIT.

[14]  Rose A.M.N.,et al.  LEAN MANUFACTURING BEST PRACTICES IN SMES , 2011 .

[15]  Seyed Mahmod Zanjirchi,et al.  Measuring Organizational Leanness Using Fuzzy Approach , 2010 .

[16]  S. Vinodh,et al.  AHP-BASED LEAN CONCEPT SELECTION IN A MANUFACTURING ORGANIZATION , 2011 .

[17]  Kuan Yew Wong,et al.  Approaches and practices of lean manufacturing: the case of electrical and electronics companies , 2011 .

[18]  Kuan Yew Wong,et al.  An investigation and identification of lean supply chain performance measures in the automotive SMES , 2011 .

[19]  Suresh Garg,et al.  Development of index for measuring leanness: study of an Indian auto component industry , 2010 .

[20]  Xiaoping Li,et al.  The applications of interval-valued fuzzy numbers and interval-distribution numbers , 1998, Fuzzy Sets Syst..

[21]  Hamid Seifoddini,et al.  Efficacy of Lean Metrics in Evaluating the Performance of Manufacturing Systems , 2008 .

[22]  S. Vinodh,et al.  Evaluation of leanness using fuzzy association rules mining , 2011 .

[23]  Shyi-Ming Chen,et al.  Fuzzy risk analysis based on interval-valued fuzzy numbers , 2009, Expert Syst. Appl..

[24]  Ching-Torng Lin,et al.  Agility index in the supply chain , 2006 .

[25]  S. Vinodh,et al.  Leanness assessment using multi-grade fuzzy approach , 2011 .

[26]  R. Kesavan,et al.  Suitability Assessment of Lean Kitting Assembly through Fuzzy Based Simulation Model , 2010 .

[27]  William G. Sullivan,et al.  EQUIPMENT REPLACEMENT DECISIONS AND LEAN MANUFACTURING , 2002 .