A hybrid approach to manufacturing enterprise simulation

Manufacturing enterprise decisions can be classified into four groups: business decisions, design decisions, engineering decisions, and production decisions. Numerous physical and software simulation techniques have been used to evaluate specific decisions by predicting their impact on the system as measured by one or more performance measures. We focus on production decisions, where discrete-event simulation models perform that evaluation. We argue that such an evaluation is limited in time and scope, and does not capture the potential impact of these decisions on the whole enterprise. We propose integrating these discrete-event models with system dynamic models and we show the potential benefits of such an integration using an example of semiconductor enterprise.

[1]  K. Mani Chandy,et al.  Distributed Simulation: A Case Study in Design and Verification of Distributed Programs , 1979, IEEE Transactions on Software Engineering.

[2]  Judith S. Dahmann,et al.  Creating Computer Simulation Systems: An Introduction to the High Level Architecture , 1999 .

[3]  Young-Jun Son,et al.  Design and development of a prototype distributed simulation for evaluation of supply chains , 2004 .

[4]  Madhav Erraguntla,et al.  Integrated Modeling and Analysis Generator Environment (IMAGE): a decision support tool , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).

[5]  Moshe M. Barash,et al.  Complexity in manufacturing systems, Part 1: Analysis of static complexity , 1998 .

[6]  Paul A. Fishwick,et al.  OOPM: An Object-Oriented Multimodeling and Simulation Application Framework , 1998, Simul..

[7]  David Jefferson,et al.  Fast Concurrent Simulation Using the Time Warp Mechanism. Part I. Local Control. , 1982 .

[8]  Charles R. McLean,et al.  The IMS MISSION architecture for distributed manufacturing simulation , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[9]  Yeong-Dae Kim,et al.  A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules , 1998 .

[10]  P. M. Pelagagge,et al.  Simulation tool for design and management optimization of automated interbay material handling and storage systems for large wafer fab , 1995 .

[11]  Siddharth Misra FRAMEWORK FOR ADAPTIVE TIME SYNCHRONIZATION METHOD FOR INTEGRATION OF DISTRIBUTED , HETEROGENEOUS , SUPPLY CHAIN SIMULATIONS , 2003 .

[12]  Richard A. Wysk,et al.  Implementation of a simulation-based control architecture for supply chain interactions , 2002, Proceedings of the Winter Simulation Conference.

[13]  Steffen Bayer,et al.  Business dynamics: Systems thinking and modeling for a complex world , 2004 .

[14]  P. Senge THE FIFTH DISCIPLINE , 1997 .

[15]  D. Towill Industrial dynamics modelling of supply chains , 1996 .

[16]  Jean J. O'Reilly,et al.  Introduction to factor/aim , 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038).

[17]  Mohamed Mohamed Naim,et al.  Establishing a Framework for Effective Materials Logistics Management , 1994 .

[18]  Paul A. Fishwick Web-based simulation: some personal observations , 1996, Winter Simulation Conference.

[19]  Albert T. Jones,et al.  Component based simulation modeling from neutral component libraries , 2003, Comput. Ind. Eng..

[20]  Yuehwern Yih,et al.  Development of a real-time multi-objective scheduler for a semiconductor fabrication system , 2003 .

[21]  B. Vos,et al.  Virtuous and vicious cycles on the road towards international supply chain management , 1999 .

[22]  Shigeki Umeda,et al.  An integration test-bed system for supply chain management , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).

[23]  J. Forrester Industrial Dynamics , 1997 .

[24]  Lawrence M. Wein,et al.  Scheduling semiconductor wafer fabrication , 1988 .

[25]  Hyeung-Sik Min Development of a real -time multiobjective scheduler for semiconductor fabrication systems , 2002 .

[26]  Alois Ferscha,et al.  Java based conservative distributed simulation , 1997, WSC '97.

[27]  Robert W. Dutton,et al.  IEEE Transactions on Semiconductor Manufacturing , 2005 .

[28]  Wolfgang Metzler,et al.  „Period Three Implies Chaos“ und der Satz von Šarkovskii , 1998 .

[29]  J. Forrester Principles of systems : text and workbook, chapters 1 through 10 , 1968 .

[30]  D. M. Miller,et al.  Application of discrete event simulation in production scheduling , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).

[31]  Taho Yang,et al.  Integrated facility layout and material handling system design in semiconductor fabrication facilities , 1997 .

[32]  Toshiya Kaihara,et al.  A distributed virtual factory in agile manufacturing environment , 2000 .

[33]  Fu-Kwun Wang,et al.  Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab , 2001 .

[34]  John D. Sterman,et al.  System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .

[35]  J. Yorke,et al.  Period Three Implies Chaos , 1975 .

[36]  Explore Configuring,et al.  A Simulation Study to , 2004 .

[37]  Marios C. Angelides,et al.  System dynamics modelling in supply chain management: research review , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[38]  Ditto,et al.  Experimental control of chaos. , 1990, Physical review letters.

[39]  Averill M. Law,et al.  Simulation Modeling & Analysis , 1991 .

[40]  Lee Dong-Ho,et al.  A SIMULATION STUDY ON LOT RELEASE CONTROL, MASK SCHEDULING, AND BATCH SCHEDULING IN SEMICONDUCTOR WAFER FABRICATION FACILITIES , 1998 .