A hybrid approach to manufacturing enterprise simulation
暂无分享,去创建一个
Abhijit Deshmukh | M. Helal | L. Rabelo | Y.-J. Son | A. Jones | J. Min | Y. Son | A. Deshmukh | L. Rabelo | M. Helal | A. Jones | J. Min
[1] K. Mani Chandy,et al. Distributed Simulation: A Case Study in Design and Verification of Distributed Programs , 1979, IEEE Transactions on Software Engineering.
[2] Judith S. Dahmann,et al. Creating Computer Simulation Systems: An Introduction to the High Level Architecture , 1999 .
[3] Young-Jun Son,et al. Design and development of a prototype distributed simulation for evaluation of supply chains , 2004 .
[4] Madhav Erraguntla,et al. Integrated Modeling and Analysis Generator Environment (IMAGE): a decision support tool , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).
[5] Moshe M. Barash,et al. Complexity in manufacturing systems, Part 1: Analysis of static complexity , 1998 .
[6] Paul A. Fishwick,et al. OOPM: An Object-Oriented Multimodeling and Simulation Application Framework , 1998, Simul..
[7] David Jefferson,et al. Fast Concurrent Simulation Using the Time Warp Mechanism. Part I. Local Control. , 1982 .
[8] Charles R. McLean,et al. The IMS MISSION architecture for distributed manufacturing simulation , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).
[9] Yeong-Dae Kim,et al. A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules , 1998 .
[10] P. M. Pelagagge,et al. Simulation tool for design and management optimization of automated interbay material handling and storage systems for large wafer fab , 1995 .
[11] Siddharth Misra. FRAMEWORK FOR ADAPTIVE TIME SYNCHRONIZATION METHOD FOR INTEGRATION OF DISTRIBUTED , HETEROGENEOUS , SUPPLY CHAIN SIMULATIONS , 2003 .
[12] Richard A. Wysk,et al. Implementation of a simulation-based control architecture for supply chain interactions , 2002, Proceedings of the Winter Simulation Conference.
[13] Steffen Bayer,et al. Business dynamics: Systems thinking and modeling for a complex world , 2004 .
[14] P. Senge. THE FIFTH DISCIPLINE , 1997 .
[15] D. Towill. Industrial dynamics modelling of supply chains , 1996 .
[16] Jean J. O'Reilly,et al. Introduction to factor/aim , 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038).
[17] Mohamed Mohamed Naim,et al. Establishing a Framework for Effective Materials Logistics Management , 1994 .
[18] Paul A. Fishwick. Web-based simulation: some personal observations , 1996, Winter Simulation Conference.
[19] Albert T. Jones,et al. Component based simulation modeling from neutral component libraries , 2003, Comput. Ind. Eng..
[20] Yuehwern Yih,et al. Development of a real-time multi-objective scheduler for a semiconductor fabrication system , 2003 .
[21] B. Vos,et al. Virtuous and vicious cycles on the road towards international supply chain management , 1999 .
[22] Shigeki Umeda,et al. An integration test-bed system for supply chain management , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).
[23] J. Forrester. Industrial Dynamics , 1997 .
[24] Lawrence M. Wein,et al. Scheduling semiconductor wafer fabrication , 1988 .
[25] Hyeung-Sik Min. Development of a real -time multiobjective scheduler for semiconductor fabrication systems , 2002 .
[26] Alois Ferscha,et al. Java based conservative distributed simulation , 1997, WSC '97.
[27] Robert W. Dutton,et al. IEEE Transactions on Semiconductor Manufacturing , 2005 .
[28] Wolfgang Metzler,et al. „Period Three Implies Chaos“ und der Satz von Šarkovskii , 1998 .
[29] J. Forrester. Principles of systems : text and workbook, chapters 1 through 10 , 1968 .
[30] D. M. Miller,et al. Application of discrete event simulation in production scheduling , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).
[31] Taho Yang,et al. Integrated facility layout and material handling system design in semiconductor fabrication facilities , 1997 .
[32] Toshiya Kaihara,et al. A distributed virtual factory in agile manufacturing environment , 2000 .
[33] Fu-Kwun Wang,et al. Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab , 2001 .
[34] John D. Sterman,et al. System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .
[35] J. Yorke,et al. Period Three Implies Chaos , 1975 .
[36] Explore Configuring,et al. A Simulation Study to , 2004 .
[37] Marios C. Angelides,et al. System dynamics modelling in supply chain management: research review , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).
[38] Ditto,et al. Experimental control of chaos. , 1990, Physical review letters.
[39] Averill M. Law,et al. Simulation Modeling & Analysis , 1991 .
[40] Lee Dong-Ho,et al. A SIMULATION STUDY ON LOT RELEASE CONTROL, MASK SCHEDULING, AND BATCH SCHEDULING IN SEMICONDUCTOR WAFER FABRICATION FACILITIES , 1998 .