Reliability-based maintenance scheduling of generating units in restructured power systems

Maintenance scheduling of generating units in restructured power systems is a collaborative and interactive process between independent system operators (ISOs) and generating companies (GENCOs). The ISO should comply with GENCO maintenance preferences subject to targeted system reliability levels. This process might be multistage since the admission of all initial unit outage requests may threaten system reliability. Hence, the ISO accepts some proposals and determines alternatives for the remaining units. The GENCOs are then allowed to conrm the alternatives or revise them. In this paper the ISO problem of generating unit maintenance scheduling is tackled. The objective function is to minimize the deviation of awarded schedule from the requested schedule, as measured in MW weeks. A novel and eective optimization technique is developed to solve the problem at hand. In the proposed methodology, risk leveling and dynamic programming optimization algorithms are concurrently utilized to lessen the computation burden and enhance the solution process. The eectiveness of the proposed method and its applicability to real-life systems are veried by examining the generation section of the IEEE reliability test system (IEEE-RTS). The performance of the new method is also compared with that of the individual risk leveling approach.

[1]  R. Billinton,et al.  A Reliability Test System for Educational Purposes-Basic Data , 1989, IEEE Power Engineering Review.

[2]  T.N. Mohammadi,et al.  A New Approach for Generation Maintenance Scheduling in a Deregulated Power System , 2005, TENCON 2005 - 2005 IEEE Region 10 Conference.

[3]  Roy Billinton,et al.  Short-term generating unit maintenance scheduling in a deregulated power system using a probabilistic approach , 2003 .

[4]  E. Handschin,et al.  Unit maintenance scheduling in open systems using genetic algorithm , 1999, 1999 IEEE Transmission and Distribution Conference (Cat. No. 99CH36333).

[5]  H. Khatib,et al.  Maintenance Scheduling of Generating Facilities , 1979, IEEE Transactions on Power Apparatus and Systems.

[6]  Bing Han,et al.  Global Generator and Transmission Maintenance Scheduling Based On a Mixed Intelligent Optimal Algorithm in Power Market , 2006, 2006 International Conference on Power System Technology.

[7]  A.J. Conejo,et al.  Generation maintenance scheduling in restructured power systems , 2005, IEEE Transactions on Power Systems.

[8]  R. Eshraghnia,et al.  Generation Maintenance Scheduling in Power Market Based on Genetic Algorithm , 2006, 2006 IEEE PES Power Systems Conference and Exposition.

[9]  Fushuan Wen,et al.  Generation unit maintenance scheduling in electricity market environment , 2008, 2008 Third International Conference on Electric Utility Deregulation and Restructuring and Power Technologies.

[10]  N. Kumarappan,et al.  Hybrid GA/SA based generation maintenance scheduling with line flow constraints in power market , 2010, 2010 Joint International Conference on Power Electronics, Drives and Energy Systems & 2010 Power India.

[11]  Mohammad Shahidehpour,et al.  Maintenance Scheduling in Restructured Power Systems , 2000 .