The optimal frequency and sequencing of tests in the inspection of multicharacteristic components
暂无分享,去创建一个
[1] Jen Tang,et al. Design of Screening Procedures: A Review , 1994 .
[2] Tzvi Raz,et al. Location and sequencing of imperfect inspection operations in serial multi-stage production systems , 1991 .
[3] Kwei Tang,et al. Optimal inspection policy in sequential screening , 1991 .
[4] Bharat T. Doshi,et al. Analysis of operating strategies in test/repair areas , 1991 .
[5] A. Raouf,et al. An optimal sequence in multicharacteristics inspection , 1990 .
[6] Jen Tang,et al. Design of product specifications for multi-characteristic inspection , 1989 .
[7] Hau L. Lee,et al. On the optimality of a simplified multicharacteristic component inspection model , 1988 .
[8] Meir J. Rosenblatt,et al. Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .
[9] Avraham Shtub,et al. Strategic allocation of inspection effort in a serial, multi-product production system , 1987 .
[10] Herbert Moskowitz,et al. Multiattribute Bayesian Acceptance Sampling Plans Under Nondestructive Inspection , 1986 .
[11] Donald P. Ballou,et al. The Impact of Inspector Fallibility on the Inspection Policy in Serial Production Systems , 1982 .
[12] Bong Jin Yum,et al. The Optional Allocation of Inspection Effort in a Class of Nonserial Production Systems , 1981 .
[13] Gary D. Eppen,et al. Optimal Location of Inspection Stations in a Multistage Production Process , 1974 .
[14] J. W. Schmidt,et al. Economic Multiattribute Acceptance Sampling , 1972 .
[15] Robert R. Britney,et al. Optimal Screening Plans for Nonserial Production Systems , 1972 .
[16] Leon S. White,et al. The Analysis of a Simple Class of Multistage Inspection Plans , 1966 .
[17] M. Lambrecht,et al. The optimal sequencing and frequency of tests in the inspectation of multicharacteristic components , 1992 .
[18] Miryam Barad,et al. A break-even quality level approach to location of inspection stations in a multi-stage production process , 1990 .
[19] Dev S. Kochhar,et al. Multiple Inspections to Meet Desired Outgoing Quality , 1987 .
[20] A. Raouf,et al. A Cost-Minimization Model for Multicharacteristic Component Inspection , 1983 .
[21] Glenn F. Lindsay,et al. Allocation of Screening Inspection Effort---A Dynamic-Programming Approach , 1964 .