Operation Time Variability in Multi Product Unpaced Production Lines
暂无分享,去创建一个
[1] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[2] L. Douglas Smith,et al. Allocating inter-station inventory capacity in unpaced production lines with heteroscedastic processing times , 1977 .
[3] Charles R. Standridge,et al. Modeling and Analysis of Manufacturing Systems , 1993 .
[4] Semyon M. Meerkov,et al. Buffer capacity for accommodating machine downtime in serial production lines , 2001, Proceedings of the 40th IEEE Conference on Decision and Control (Cat. No.01CH37228).
[5] Tayfur Altiok,et al. The Allocation of Interstage Buffer Capacities in Production Lines , 1983 .
[6] J. George Shanthikumar,et al. On optimal arrangement of stations in a tandem queueing system with blocking , 1992 .
[7] Sabry Shaaban,et al. The effects of unbalancing operation time variability on the performance of unreliable lines , 2013 .
[8] Akif Asil Bulgak,et al. Modeling and design optimization of asynchronous flexible assembly systems with statistical process control and repair , 1991 .
[9] Kelvin C. W. So,et al. The effect of the coefficient of variation of operation times on the allocation of storage space in , 1991 .
[10] Ray Wild,et al. A note on the operating characteristics of‘ balanced’ and ‘ unbalanced’ production flow lines , 1972 .
[11] Robert R. Inman,et al. EMPIRICAL EVALUATION OF EXPONENTIAL AND INDEPENDENCE ASSUMPTIONS IN QUEUEING MODELS OF MANUFACTURING SYSTEMS , 1999 .
[12] Frederick S. Hillier,et al. Toward characterizing the optimal allocation of storage space in production line systems with variable processing times , 1993 .
[13] A. D. Knott,et al. THE INEFFICIENCY OF A SERIES OF WORK STATIONS—A SIMPLE FORMULA , 1970 .
[14] Ray Wild,et al. The operating characteristics of‘ single’ and ‘ double’ non-mechanical flow line systems , 1973 .
[15] Ihsan Sabuncuoglu,et al. Analysis of serial production lines: characterisation study and a new heuristic procedure for optimal buffer allocation , 2006 .
[16] T. E. El-Rayah,et al. The effect of inequality of interstage buffer capacities and operation time variability on the efficiency of production line systems , 1979 .
[17] Frederick S. Hillier,et al. The effect of machine breakdowns and interstage storage on the performance of production line systems , 1991 .
[18] E. Muth. The production rate of a series of work stations with variable service times , 1973 .
[19] G. G. Hitchings,et al. The effects of performance time variance on a balanced, four-station manual assembly line , 1973 .