Research of Construction Schedule Optimization using Particle Swarm Optimization
暂无分享,去创建一个
[1] Ian C. Goulter,et al. MIXED INTEGER MODEL FOR RESOURCE ALLOCATION IN PROJECT MANAGEMENT , 1989 .
[2] F. F. Boctor,et al. Some efficient multi-heuristic procedures for resource-constrained project scheduling , 1990 .
[3] Lucy C. Morse,et al. A study of combining heuristics for scheduling projects with limited multiple resources , 1988 .
[4] Y Cengiz Toklu. Application of genetic algorithms to construction scheduling with or without resource constraints , 2002 .
[5] Russell C. Eberhart,et al. A discrete binary version of the particle swarm algorithm , 1997, 1997 IEEE International Conference on Systems, Man, and Cybernetics. Computational Cybernetics and Simulation.
[6] Robert B. Harris. Packing Method for Resource Leveling (PACK) , 1990 .
[7] Gerald W. Evans,et al. Time-Constrained Resource Leveling , 1991 .
[8] Said M. Easa,et al. Resource Leveling in Construction by Optimization , 1989 .
[9] Weng Tat Chan,et al. CONSTRUCTION RESOURCE SCHEDULING WITH GENETIC ALGORITHMS , 1996 .
[10] Robert I. Carr,et al. Resource Strategies for Dynamic Project Management , 1991 .
[11] P. Fazio,et al. Calculating Weight Matrix of Neural Network for Resource Leveling , 1998 .
[12] Mohan M. Kumaraswamy,et al. Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization , 2004 .
[13] Fadi A. Karaa,et al. Resource Management in Construction , 1986 .