Research Background and Plan of Enhanced Geothermal System Project for MW Power Generation in Korea

Geothermal energy is believed to be an important source among the renewable energy sources to provide the base load electricity. Although there has been a drastic increase in the use of geothermal heat pump in Korea, there is no geothermal power plant in operation in Korea. Fortunately, the first EGS (Enhanced Geothermal System) Project in Korea has started in Dec 2010. This five year project is divided into two stages; two years for exploration and drilling of 3 km depth to confirm the minimum target temperature of 100 degrees, and another three years composed drilling 5 km doublet, hydraulic stimulation of geothermal reservoir with expected temperature of 180 degrees (40 kg/s) and construction of MW geothermal power plant in the surface. This EGS project would be a landmark effort that invited a consortium of industry, research institutes and university with expertises in the fields of geology, hydrogeology, geophysics, geomechanics and plant engineering.