Supply chain optimisation with assembly line balancing

Supply chain management operates at three levels, strategic, tactical and operational. While the strategic approach generally pertains to the optimisation of network resources such as designing networks, location and determination of the number of facilities, etc., tactical decisions deal with the mid-term, including production levels at all plants, assembly policy, inventory levels and lot sizes, and operational decisions are related to how to make the tactical decisions happen in the short term, such as production planning and scheduling. This paper mainly discusses and explores how to realise the optimisation of strategic and tactical decisions together in the supply chain. Thus, a supply chain network (SCN) design problem is considered as a strategic decision and the assembly line balancing problem is handled as a tactical decision. The aim of this study is to optimise and design the SCN, including manufacturers, assemblers and customers, that minimises the transportation costs for determined periods while balancing the assembly lines in assemblers, which minimises the total fixed costs of stations, simultaneously. A nonlinear mixed-integer model is developed to minimise the total costs and the number of assembly stations while minimising the total fixed costs. For illustrative purposes, a numerical example is given, the results and the scenarios that are obtained under various conditions are discussed, and a sensitivity analysis is performed based on performance measures of the system, such as total cost, number of stations, cycle times and distribution amounts.

[1]  Josefa Mula,et al.  Mathematical programming models for supply chain production and transport planning , 2010, Eur. J. Oper. Res..

[2]  Armin Scholl,et al.  State-of-the-art exact and heuristic solution procedures for simple assembly line balancing , 2006, Eur. J. Oper. Res..

[3]  Ming Zhou,et al.  A parallel station heuristic for the mixed-model production line balancing problem , 1997 .

[4]  M. Gen,et al.  Study on multi-stage logistic chain network: a spanning tree-based genetic algorithm approach , 2002 .

[5]  Z. H. Che,et al.  A modified Pareto genetic algorithm for multi-objective build-to-order supply chain planning with product assembly , 2010, Adv. Eng. Softw..

[6]  Alexandre Dolgui Balancing Assembly and Transfer Lines , 2006, Eur. J. Oper. Res..

[7]  Turan Paksoy,et al.  A genetic algorithm approach for multi-objective optimization of supply chain networks , 2006, Comput. Ind. Eng..

[8]  Hasan Pirkul,et al.  Planning and coordination of production and distribution facilities for multiple commodities , 2001, Eur. J. Oper. Res..

[9]  S.A. Torabi,et al.  An interactive possibilistic programming approach for multiple objective supply chain master planning , 2008, Fuzzy Sets Syst..

[10]  Benita M. Beamon,et al.  A multi-objective approach to simultaneous strategic and operational planning in supply chain design , 2000 .

[11]  Lee Ann Jarousse Strategic supply chain management. , 2011, Hospitals & health networks.

[12]  Dario Pacciarelli,et al.  Optimally balancing assembly lines with different workstations , 2002, Discret. Appl. Math..

[13]  Shoshanah Cohen,et al.  Strategic Supply Chain Management , 2004 .

[14]  Cheng-Liang Chen,et al.  Multi-objective optimization of multi-echelon supply chain networks with uncertain product demands and prices , 2004, Comput. Chem. Eng..

[15]  Hadi Gökçen,et al.  A goal programming approach to simple U-line balancing problem , 2006, Eur. J. Oper. Res..

[16]  Imad Alatiqi,et al.  Optimizing the Supply Chain of a Petrochemical Company under Uncertain Operating and Economic Conditions , 2004 .

[17]  Mitsuo Gen,et al.  Hybrid genetic algorithm for multi-time period production/distribution planning , 2005, Comput. Ind. Eng..

[18]  Soumen Ghosh,et al.  A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems , 1989 .

[19]  Atul P. Kanyalkar,et al.  An integrated aggregate and detailed planning in a multi-site production environment using linear programming , 2005 .

[20]  M. Goetschalckx,et al.  A primal decomposition method for the integrated design of multi-period production–distribution systems , 1999 .

[21]  Clarence H. Martin,et al.  Integrated Production, Distribution, and Inventory Planning at Libbey-Owens-Ford , 1993 .

[22]  U. V. Shenoy,et al.  Pinch analysis for aggregate production planning in supply chains , 2004, Comput. Chem. Eng..

[23]  Nafee Rizk,et al.  Synchronized production–distribution planning in a single-plant multi-destination network , 2008, J. Oper. Res. Soc..

[24]  W. Wilhelm,et al.  Strategic, tactical and operational decisions in multi-national logistics networks: A review and discussion of modelling issues , 2000 .

[25]  Raymond R. Tan,et al.  A heuristic-based algebraic targeting technique for aggregate planning in supply chains , 2008, Comput. Chem. Eng..

[26]  Masayuki Matsui,et al.  A management design approach to assembly line systems , 2003 .

[27]  Chih-Hung Tsai,et al.  A fuzzy goal programming approach with priority for channel allocation problem in steel industry , 2008, Expert Syst. Appl..

[28]  Emilio Esposito,et al.  Material requirement planning and the supply chain at Alenia Aircraft , 1997 .

[29]  Turan Paksoy,et al.  Revised multi-choice goal programming for multi-period, multi-stage inventory controlled supply chain model with popup stores in Guerrilla marketing , 2010 .

[30]  Tadeusz Sawik,et al.  Coordinated supply chain scheduling , 2009 .

[31]  Turan Paksoy,et al.  Design and optimization of a strategic production-distribution model for supply chain management: case study of a plastic profile manufacturer in Turkey , 2007 .

[32]  Linet Özdamar,et al.  Capacity driven due date settings in make-to-order production systems , 1997 .

[33]  Brahim Rekiek,et al.  State of art of optimization methods for assembly line design , 2002, Annu. Rev. Control..

[34]  Mitsuo Gen,et al.  A steady-state genetic algorithm for multi-product supply chain network design , 2009, Comput. Ind. Eng..

[35]  Ichiro Nishizaki,et al.  Fuzzy Programming and Profit and Cost Allocation for a Production and Transportaion Problem in a Housing Material Manufacturer : A Case Study , 1999 .

[36]  Qi-Ming He,et al.  Modeling and analysis of a supply-assembly-store chain , 2007, Eur. J. Oper. Res..

[37]  Turan Paksoy,et al.  Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing , 2009, Eur. J. Oper. Res..

[38]  Subhash C. Sarin,et al.  A survey of the assembly line balancing procedures , 1998 .

[39]  Johan Håkansson,et al.  A review of assembly line balancing and sequencing including line layouts , 2008 .

[40]  Armin Scholl,et al.  A survey on problems and methods in generalized assembly line balancing , 2006, Eur. J. Oper. Res..

[41]  Ichiro Nishizaki,et al.  Fuzzy programming and profit and cost allocation for a production and transportation problem , 2001, Eur. J. Oper. Res..

[42]  W. Wilhelm,et al.  A family of hierarchical models for the design of deterministic assembly systems , 1997 .

[43]  Hadi Gökçen,et al.  Assembly line balancing: Two resource constrained cases , 2005 .

[44]  Z. H. Che,et al.  Cooperator selection and industry assignment in supply chain network with line balancing technology , 2009, Expert Syst. Appl..

[45]  Iftekhar A. Karimi,et al.  Planning and scheduling of parallel semicontinuous processes. 1. Production planning , 1997 .

[46]  David F. Pyke,et al.  Performance characteristics of stochastic integrated production-distribution systems , 1993 .

[47]  Hong Yan,et al.  A strategic model for supply chain design with logical constraints: formulation and solution , 2003, Comput. Oper. Res..

[48]  Mingyuan Chen,et al.  A linear programming model for integrated steel production and distribution planning , 1997 .

[49]  R. Ganeshan Managing supply chain inventories: A multiple retailer, one warehouse, multiple supplier model , 1999 .

[50]  Stephen C. Graves,et al.  An Integer Programming Procedure for Assembly System Design Problems , 2011, Oper. Res..

[51]  Ugur Özcan,et al.  Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm , 2010, Eur. J. Oper. Res..

[52]  Umut Rifat Tuzkaya,et al.  A holonic approach based integration methodology for transportation and warehousing functions of the supply network , 2009, Comput. Ind. Eng..

[53]  Patrick R. McMullen,et al.  Multi-objective assembly line balancing via a modified ant colony optimization technique , 2006 .

[54]  Ilker Baybars,et al.  A survey of exact algorithms for the simple assembly line balancing , 1986 .

[55]  Pisal Yenradee,et al.  Inventory/distribution control system in a one-warehouse/multi-retailer supply chain , 2008 .

[56]  Matthias Amen,et al.  An exact method for cost-oriented assembly line balancing , 2000 .