Parameter Estimation of a Delay Time Model of Wearing Parts Based on Objective Data

The wearing parts of a system have a very high failure frequency, making it necessary to carry out continual functional inspections and maintenance to protect the system from unscheduled downtime. This allows for the collection of a large amount of maintenance data. Taking the unique characteristics of the wearing parts into consideration, we establish their respective delay time models in ideal inspection cases and nonideal inspection cases. The model parameters are estimated entirely using the collected maintenance data. Then, a likelihood function of all renewal events is derived based on their occurring probability functions, and the model parameters are calculated with the maximum likelihood function method, which is solved by the CRM. Finally, using two wearing parts from the oil and gas drilling industry as examples—the filter element and the blowout preventer rubber core—the parameters of the distribution function of the initial failure time and the delay time for each example are estimated, and their distribution functions are obtained. Such parameter estimation based on objective data will contribute to the optimization of the reasonable function inspection interval and will also provide some theoretical models to support the integrity management of equipment or systems.

[1]  A. H. Christer,et al.  Modelling maintenance practice of production plant using the delay-time concept , 1995 .

[2]  Marvin Rausand,et al.  Reliability centered maintenance , 1998 .

[3]  Wenbin Wang A two-stage prognosis model in condition based maintenance , 2007, Eur. J. Oper. Res..

[4]  A. H. Christer,et al.  A data deficiency based parameter estimating problem and case study in delay time PM modeling , 2000 .

[5]  W. Marsden I and J , 2012 .

[6]  Terje Aven,et al.  A delay-time model with safety constraint , 2009, Reliab. Eng. Syst. Saf..

[7]  Rose Baker,et al.  Developing and Testing the Delay-Time Model , 1993 .

[8]  A. H. Christer,et al.  A delay-time-based maintenance model of a multi-component system , 1995 .

[9]  Wenbin Wang,et al.  A delay-time model for repairable machinery: maximum likelihood estimation of optimum inspection intervals , 1997 .

[10]  Rose Baker,et al.  Estimating the delay-time distribution of faults in repairable machinery from failure data , 1991 .

[11]  Philip A. Scarf,et al.  A fully subjective approach to modelling inspection maintenance , 2003, Eur. J. Oper. Res..

[12]  A. H. Christer,et al.  Delay Time Models of Industrial Inspection Maintenance Problems , 1984 .

[13]  Wenbin Wang,et al.  An overview of the recent advances in delay-time-based maintenance modelling , 2012, Reliab. Eng. Syst. Saf..

[14]  H. I. Freedman,et al.  A time-delay model of single-species growth with stage structure. , 1990, Mathematical biosciences.

[15]  Wenbin Wang,et al.  A case study of modelling preventive maintenance of a production plant using subjective data , 1998, J. Oper. Res. Soc..

[16]  A. H. Christer,et al.  A Recent Mathematical Development in Maintenance Theory , 1989 .

[17]  Wenbin Wang,et al.  An inspection model based on a three-stage failure process , 2011, Reliab. Eng. Syst. Saf..

[18]  Xu Congmin Delay Time Model Based on Imperfect Maintenance , 2009 .

[19]  S. Rahman Reliability Engineering and System Safety , 2011 .

[20]  Wenbin Wang An inspection model for a process with two types of inspections and repairs , 2009, Reliab. Eng. Syst. Saf..

[21]  A. H. Christer Delay-Time Model of Reliability of Equipment Subject to Inspection Monitoring , 1987 .

[22]  J. Simons,et al.  Complex coordinate rotation calculation of branching ratios , 1982 .