Planning in Companies with Dispersed Capacity

This chapter’s objective is to discuss the effect of dispersed capacity on planning in manufacturing organisations. The chapter is based on case study research conducted by the authors in a company with geographically dispersed capacity. This is augmented by a questionnaire survey intended to show that the case study company is not unique. The information collected from the two previously mentioned sources is compared with literature. The questionnaire and literature indicated that there are now substantial numbers of companies with dispersed capacity. The case study research indicates that this leads to greater planning complexity because of increased lead-times due to transhipment. In contrast with single-site companies, this complexity cannot be addressed by Just-in-Time in cases where capacity is dispersed. In-depth research has been conducted in only one company, though the questionnaire survey provides supporting data. The chapter implies that companies employing dispersed capacity need to focus on improving their planning systems to cope with the increased complexity. While the literature on Supply Chain Management (SCM) is extensive, there has been relatively little case-based research on the implications of globalisation for planning. In particular, while it is widely believed that many companies have dispersed their capacity, the evidence for this is largely anecdotal. The survey presented in the chapter provides quantitative data to support this belief.

[1]  D. Towill,et al.  Engineering the leagile supply chain , 2000 .

[2]  N. A. Duffie Heterarchical control of highly distributed manufacturing systems , 1996 .

[3]  Malcolm McDonald,et al.  Strategic Marketing Planning: A State‐of‐the‐art Review , 1992 .

[4]  D. Lambert,et al.  Issues in Supply Chain Management , 2000 .

[5]  Louiqa Raschid,et al.  Supply chain infrastructures: system integration and information sharing , 2002, SGMD.

[6]  Kirk P. Arnett,et al.  Current practices in management information systems , 1993, Inf. Manag..

[7]  Ashraf Labib,et al.  Computerised Maintenance Management Systems , 2008 .

[8]  Henrique O‘Neill,et al.  The Extended Manufacturing Enterprise Paradigm , 1994 .

[9]  Simeon Preston,et al.  Lost in migration: offshore need not mean outsourced , 2004 .

[10]  Anurag Gupta,et al.  Supply chain agent decision aid system (SCADAS) , 2001, Proceeding of the 2001 Winter Simulation Conference (Cat. No.01CH37304).

[11]  Richard R. Young,et al.  Managing Residual Disposition: Achieving Economy, Environmental Responsibility, and Competitive Advantage Using the Supply Chain Framework , 2000 .

[12]  Xian‐zhong Xu,et al.  Building market intelligence systems for environment scanning , 1995 .

[13]  Donald A. Schön,et al.  Participatory Action Research and Action Science Compared , 1989 .

[14]  Stephen John Turner,et al.  Distributed supply chain simulation across enterprise boundaries , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[15]  Sanjay Jain,et al.  Development of a high-level supply chain simulation model , 2001, Proceeding of the 2001 Winter Simulation Conference (Cat. No.01CH37304).

[16]  Gary A. Knight,et al.  Emerging patterns of international business: Implications for public policy , 2000 .

[17]  Yanqing Duan,et al.  A framework for a hybrid intelligent system in support of marketing strategy development , 1999 .

[18]  Jorge Pinho de Sousa,et al.  A component-based approach to support order planning in a distributed manufacturing enterprise , 2000 .

[19]  C. Karlsson The development of industrial networks: Challenges to operations management in an extraprise , 2003 .

[20]  Rick Tamaschke,et al.  The use and development of marketing information systems in Queensland, Australia , 1996 .

[21]  Michael J. Baker,et al.  The Marketing Book , 2002 .

[22]  Weiming Shen,et al.  Distributed Manufacturing Scheduling Using Intelligent Agents , 2002, IEEE Intell. Syst..

[23]  C. Harland Supply Chain Management: Relationships, Chains and Networks , 1996 .

[24]  Florent Frederix,et al.  An extended enterprise planning methodology for the discrete manufacturing industry , 2001, Eur. J. Oper. Res..

[25]  Douglas H. Norrie,et al.  Multi-agent Mediator architecture for distributed manufacturing , 1996, J. Intell. Manuf..