Buildability Factors Influencing Micro-Level Formwork Labour Productivity of Slab Panels in Building Floors
暂无分享,去创建一个
[1] Larry E. Toothaker,et al. Multiple Regression: Testing and Interpreting Interactions , 1991 .
[2] R. Cook. Regression Graphics , 1994 .
[3] David Stephan,et al. Practical Statistics by Example Using Microsoft Excel and Minitab , 2001 .
[4] George Jergeas,et al. Benefits of Constructability on Construction Projects , 2001 .
[5] Yuanbin Song,et al. Modeling of Functional Construction Requirements for Constructability Analysis , 2006 .
[6] Mustafa Alshawi. Improving The Constructability Of A Design Solution Through An Integrated System , 1996 .
[7] D. A. Kenny,et al. The moderator-mediator variable distinction in social psychological research: conceptual, strategic, and statistical considerations. , 1986, Journal of personality and social psychology.
[8] Colin S. Gray. ‘Intelligent’ construction time and cost analysis , 1986 .
[9] J. R. Illingworth,et al. Construction Methods And Planning , 1993 .
[10] T. Hassard,et al. Applied Linear Regression , 2005 .
[11] Jun Dong. Chen. Effects of design on buildability. , 1996 .
[12] James T. O'Connor,et al. Constructability improvement during field operations , 1988 .
[13] Malik Beshir Malik,et al. Applied Linear Regression , 2005, Technometrics.
[14] Mohan M. Kumaraswamy,et al. A study of the factors affecting construction durations in Hong Kong , 1995 .
[15] James T. O'Connor,et al. Constructability Concepts for Engineering and Procurement , 1987 .
[16] Martin Fischer,et al. Characteristics of Design-Relevant Constructability Knowledge , 1997 .
[17] Awad S. Hanna,et al. Factors influencing formwork productivity , 1993 .
[18] Richard Hyde. Buildability as a design concept for architects: a case study of laboratory buildings , 1995 .
[19] M. Hardy. Regression with dummy variables , 1993 .
[20] C. Coulton,et al. Interaction Effects in Multiple Regression , 1993 .
[21] James J. Adrian. Construction Productivity Improvement , 1987 .
[22] D. Cheetham,et al. PRODUCTIVITY, BUILDABILITY AND CONSTRUCTABILITY: IS WORK STUDY THE MISSING LINK? , 2004 .
[23] Bambang Trigunarsyah,et al. Constructability Practices among Construction Contractors in Indonesia , 2004 .
[24] R. Friedrich. In Defense of Multiplicative Terms In Multiple Regression Equations , 1982 .
[25] James T. O'Connor,et al. Collecting Constructability Improvement Ideas , 1986 .
[26] Abdulaziz M. Jarkas,et al. An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction , 2005 .
[27] S. Weisberg,et al. Applied Linear Regression (2nd ed.). , 1986 .
[28] Patrick T.I. Lam,et al. Constructability rankings of construction systems based on the analytical hierarchy process , 2007 .
[29] Christopher Nigel Preece,et al. Survey of Problems Before the Construction Industry: A Report Prepared by Sir Harold Emmerson (1962) , 2008 .