System Dynamics modelling of a production and inventory system for remanufacturing to evaluate system improvement strategies

Remanufacturing activity views the reverse supply chain of reclaimed goods as integral to the traditional supply chain to the consumer. At the end of the useful life of products, a reverse supply process is activated in which unwanted materials and products are recovered from end users to recapture some of their value. Therefore, planning for the traditional supply chain of goods must take into account the recovered products. Two main processes that need to be considered are inventory control and production planning. In this paper, we model a production and inventory system for remanufacturing using a System Dynamics simulation modelling approach. The aim is to explore the dynamics of the remanufacturing process and to evaluate system improvement strategies. Specifically, the analysis focuses on the effects of capacity planning and lead times on the system which presents push and pull inventory policies driven mainly by the inventory coverage. The research findings reveal efficiency in the remanufacturing process with higher remanufacturing capacity if the quantity of remanufacturable returns and the remanufacturing lead time are increased and decreased respectively. Moreover, an increase of the production lead time has a higher effect on the system performance than an equivalent increase in the remanufacturing lead time. In addition, we provide a case study both to support these findings and to further validate the developed model.

[1]  Gp Gudrun Kiesmüller,et al.  An inventory model with dependent product demands and returns , 2001 .

[2]  E. A. van deLaan,et al.  An (s,Q) inventory model with remanufacturing and disposal , 1996 .

[3]  J. Forrester Industrial Dynamics: A Major Breakthrough for Decision Makers , 2012 .

[4]  C. John Langley,et al.  Management of Business Logistics: A Supply Chain Perspective , 2002 .

[5]  R. Teunter Economic ordering quantities for recoverable item inventory systems , 2001 .

[6]  Askiner Gungor,et al.  Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .

[7]  Erwin van der Laan,et al.  Leadtime effects and policy improvement for stochastic inventory control with remanufacturing , 2001 .

[8]  Patroklos Georgiadis,et al.  The effect of environmental parameters on product recovery , 2004, Eur. J. Oper. Res..

[9]  John D. Sterman,et al.  System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .

[10]  R G Coyle,et al.  System Dynamics Modelling: A Practical Approach , 1996 .

[11]  John D. W. Morecroft,et al.  Strategic Modelling and Business Dynamics: A Feedback Systems Approach , 2007 .

[12]  Ruud H. Teunter,et al.  Erim Report Series Research in Management Simple Heuristics for Push and Pull Remanufacturing Policies Bibliographic Data and Classifications Simple Heuristics for Push and Pull Remanufacturing Policies , 2022 .

[13]  K. Inderfurth Impact of uncertainties on recovery behavior in a remanufacturing environment , 2005 .

[14]  Rommert Dekker,et al.  Inventory Control in Hybrid Systems with Remanufacturing , 1999 .

[15]  Erwin van der Laan,et al.  Product remanufacturing and disposal: A numerical comparison of alternative control strategies , 1996 .

[16]  Patroklos Georgiadis,et al.  A system dynamics model for dynamic capacity planning of remanufacturing in closed-loop supply chains , 2007, Comput. Oper. Res..

[17]  Erwin van der Laan,et al.  Quantitative models for reverse logistics: A review , 1997 .

[18]  Marios C. Angelides,et al.  System dynamics modelling in supply chain management: research review , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[19]  Stefan Minner,et al.  Simple expressions for finding recovery system inventory control parameter values , 2003, J. Oper. Res. Soc..

[20]  Patroklos Georgiadis,et al.  The Impact of Product Lifecycle on Capacity Planning of Closed‐Loop Supply Chains with Remanufacturing , 2006 .

[21]  Yaman Barlas,et al.  Formal aspects of model validity and validation in system dynamics , 1996 .

[22]  Rainer Kleber,et al.  Dynamic Inventory Management in Reverse Logistics , 2006 .

[23]  S. Mitra Revenue management for remanufactured products , 2007 .

[24]  Martin Charter,et al.  Remanufacturing and product design: designing for the 7th generation , 2007 .

[25]  Hark Hwang,et al.  An optimal ordering and recovery policy for reusable items , 2002 .

[26]  Rommert Dekker,et al.  An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies , 1999, Eur. J. Oper. Res..

[27]  Carol Prahinski,et al.  Empirical research opportunities in reverse supply chains , 2006 .

[28]  E. A. van deLaan,et al.  Production planning and inventory control with remanufacturing and disposal , 1997 .

[29]  Gudrun P. Kiesmüller,et al.  A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes , 2003, Eur. J. Oper. Res..