Models and Methods for Production Scheduling in the Pharmaceutical Industry
暂无分享,去创建一个
[1] J. R. Jackson. SCHEDULING A PRODUCTION LINE TO MINIMIZE MAXIMUM TARDINESS , 1955 .
[2] B. Roy,et al. Les Problemes d'Ordonnancement , 1967 .
[3] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[4] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[5] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[6] Don T. Phillips,et al. A state-of-the-art survey of dispatching rules for manufacturing job shop operations , 1982 .
[7] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[8] William L. Berry,et al. Manufacturing Planning and Control Systems , 1984 .
[9] Emile H. L. Aarts,et al. Simulated Annealing: Theory and Applications , 1987, Mathematics and Its Applications.
[10] Kenneth N. McKay,et al. Job-Shop Scheduling Theory: What Is Relevant? , 1988 .
[11] Michael Pinedo,et al. Sequencing in an Assembly Line with Blocking to Minimize Cycle Time , 1989, Oper. Res..
[12] R. Haupt,et al. A survey of priority rule-based scheduling , 1989 .
[13] Ehl Emile Aarts,et al. Simulated annealing : an introduction , 1989 .
[14] Fred Glover,et al. Tabu Search: A Tutorial , 1990 .
[15] K. Preston White,et al. Job-shop scheduling: limits of the binary disjunctive formulation , 1990 .
[16] Jim Duggan,et al. Shop Floor Control Systems , 1991 .
[17] Jan Karel Lenstra,et al. Job Shop Scheduling by Simulated Annealing , 1992, Oper. Res..
[18] Jerrt Clement,et al. Manufacturing Data Structures; Building Foundations for Excellence with Bills of Materials and.. , 1992 .
[19] Charles R. Standridge,et al. Modeling and Analysis of Manufacturing Systems , 1993 .
[20] Arabinda Tripathy. Shop Floor Control Systems: From Design to Implementation , 1993 .
[21] Upendra Dave,et al. Heuristic Scheduling Systems , 1993 .
[22] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[23] Gintaras V. Reklaitis,et al. Reactive schedule modification in multipurpose batch chemical plants , 1994 .
[24] Frank Werner,et al. Insertion Techniques for the Heuristic Solution of the Job Shop Problem , 1995, Discret. Appl. Math..
[25] Donald E. Brown,et al. Intelligent Scheduling Systems , 1995 .
[26] Matthew L. Ginsberg,et al. Limited Discrepancy Search , 1995, IJCAI.
[27] Norman M. Sadeh,et al. Backtracking Techniques for the Job Shop Scheduling Constraint Satisfaction Problem , 1995, Artif. Intell..
[28] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[29] Richard E. Korf,et al. Improved Limited Discrepancy Search , 1996, AAAI/IAAI, Vol. 1.
[30] Chung-Yee Lee,et al. Machine scheduling with an availability constraint , 1996, J. Glob. Optim..
[31] Reha Uzsoy,et al. Decomposition Methods for Complex Factory Scheduling Problems , 1996 .
[32] Yih-Long Chang,et al. Ranking Dispatching Rules by Data Envelopment Analysis in a Job Shop Environment , 1996 .
[33] E. Nowicki,et al. A Fast Taboo Search Algorithm for the Job Shop Problem , 1996 .
[34] John N. Tsitsiklis,et al. Neuro-Dynamic Programming , 1996, Encyclopedia of Machine Learning.
[35] Michel Gendreau,et al. A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times , 1996 .
[36] Pierre Hansen,et al. Variable Neighborhood Search , 2018, Handbook of Heuristics.
[37] Czesław Smutnicki,et al. Scheduling in Production of Concrete Wares , 1997 .
[38] John N. Tsitsiklis,et al. Rollout Algorithms for Combinatorial Optimization , 1997, J. Heuristics.
[39] Peter Brucker,et al. Improving Local Search Heuristics for some Scheduling Problems. Part II , 1996, Discret. Appl. Math..
[40] Toby Walsh. Depth-bounded Discrepancy Search , 1997, IJCAI.
[41] J. M. J. Schutten. Practical job shop scheduling , 1998, Ann. Oper. Res..
[42] Ferenc Friedler,et al. Combinatorial technique for short term scheduling of multipurpose batch plants based on schedule-graph representation , 1998 .
[43] Thomas Sttzle,et al. Applying iterated local search to the permutation ow shop problem , 1998 .
[44] Sheik Meeran,et al. Deterministic job-shop scheduling: Past, present and future , 1999, Eur. J. Oper. Res..
[45] Ihsan Sabuncuoglu,et al. Job shop scheduling with beam search , 1999, Eur. J. Oper. Res..
[46] Jatinder N. D. Gupta,et al. A review of scheduling research involving setup considerations , 1999 .
[47] Cees Duin,et al. The pilot method: A strategy for heuristic repetition with application to the Steiner problem in graphs , 1999, Networks.
[48] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[49] Peter Brucker,et al. Solving a chemical batch scheduling problem by local search , 2000, Ann. Oper. Res..
[50] Reha Uzsoy,et al. Evaluation and comparison of production schedules , 2000 .
[51] Gavriel Salvendy,et al. Handbook of industrial engineering , 2001 .
[52] Pierre Hansen,et al. Variable neighborhood search: Principles and applications , 1998, Eur. J. Oper. Res..
[53] Dario Pacciarelli,et al. Alternative graph formulation for solving complex factory-scheduling problems , 2002 .
[54] Thomas Stützle,et al. A beginner's introduction to iterated local search , 2001 .
[55] M. Dorigo,et al. Design of Iterated Local Search Algorithms An Example Application to the Single Machine Total Weighted Tardiness Problem , 2001 .
[56] Matthijs den Besten,et al. Design of Iterated Local Search Algorithms , 2001, EvoWorkshops.
[57] L. Mockus,et al. The integration of production plan and operating schedule in a pharmaceutical pilot plant , 2001 .
[58] Helena Ramalhinho Dias Lourenço,et al. Iterated Local Search , 2001, Handbook of Metaheuristics.
[59] Dario Pacciarelli,et al. Job-shop scheduling with blocking and no-wait constraints , 2002, Eur. J. Oper. Res..
[60] S. Binato,et al. A GRASP FOR JOB SHOP SCHEDULING , 2001 .
[61] Norbert Trautmann,et al. Storage problems in batch scheduling , 2002 .
[62] Ameet Mallik,et al. Biopharma's Capacity Crunch. (Current Research) , 2002 .
[63] Christodoulos A. Floudas,et al. Continuous-Time Optimization Approach for Medium-Range Production Scheduling of a Multiproduct Batch Plant , 2002 .
[64] Luis Puigjaner,et al. A New Framework for Batch Process Optimization Using the Flexible Recipe , 2003 .
[65] Kenneth N. McKay,et al. Integrated decision support for planning, scheduling, and dispatching tasks in a focused factory , 2003, Comput. Ind..
[66] David L. Woodruff,et al. Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .
[67] Miguel J. Bagajewicz,et al. Integrating Budgeting Models into Scheduling and Planning Models for the Chemical Batch Industry , 2003 .
[68] Ehl Emile Aarts,et al. Simulated annealing and Boltzmann machines , 2003 .
[69] Dario Pacciarelli,et al. A New Class of Greedy Heuristics for Job Shop Scheduling Problems , 2003, WEA.
[70] Kenneth N. McKay,et al. Planning, scheduling and dispatching tasks in production control , 2003, Cognition, Technology & Work.
[71] Kenneth N. McKay,et al. Planners, schedulers and dispatchers: a description of cognitive tasks in production control , 2003 .
[72] Dario Pacciarelli,et al. Production scheduling in a steelmaking-continuous casting plant , 2004, Comput. Chem. Eng..
[73] Lazaros G. Papageorgiou,et al. A mathematical programming approach for cyclic production and cleaning scheduling of multistage continuous plants , 2004, Comput. Chem. Eng..
[74] Outsourcing of R&D in the Pharmaceutical Industry , 2004 .
[75] Dario Pacciarelli,et al. A Rollout Metaheuristic for Job Shop Scheduling Problems , 2004, Ann. Oper. Res..
[76] Marcus Brandenburg,et al. Integrating collaborative planning and supply chain optimization for the chemical process industry (I) - methodology , 2004, Comput. Chem. Eng..
[77] Norman Sadeh,et al. Proactive release procedures for just‐in‐time job shop environments, subject to machine failures , 2004 .
[78] Luis Puigjaner,et al. Scheduling intermediate storage multipurpose batch plants using the S-graph , 2004 .
[79] Nilay Shah,et al. Pharmaceutical supply chains: key issues and strategies for optimisation , 2004, Comput. Chem. Eng..
[80] Eugeniusz Nowicki,et al. An Advanced Tabu Search Algorithm for the Job Shop Problem , 2005, J. Sched..
[81] Achim Kienle,et al. Short-Term Scheduling of Batch Processes : a Comparative Study of Different Approaches , 2005 .
[82] Cees Duin,et al. Looking Ahead with the Pilot Method , 2005, Ann. Oper. Res..
[83] P. McMullen,et al. A beam search heuristic method for mixed-model scheduling with setups , 2005 .
[84] Rainer E. Burkard,et al. A complex time based construction heuristic for batch scheduling problems in the chemical industry , 2006, Eur. J. Oper. Res..
[85] Reha Uzsoy,et al. Rapid Modeling and Discovery of Priority Dispatching Rules: An Autonomous Learning Approach , 2006, J. Sched..
[86] Wei Huang,et al. Scheduling of batch plants: constraint-based approach and performance investigation , 2007 .
[87] Paolo Detti,et al. Minimizing and balancing setups in a serial production system , 2007 .
[88] Thomas Stützle,et al. A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem , 2007, Eur. J. Oper. Res..
[89] Anders Bjerg Pedersen,et al. A Fast Taboo Search Algorithm for the Job Shop Scheduling Problem , 2008 .
[90] Michael Pinedo,et al. PRACTICE‐FOCUSED RESEARCH ISSUES FOR SCHEDULING SYSTEMS* , 2002 .
[91] Mauricio G. C. Resende,et al. Greedy Randomized Adaptive Search Procedures , 1995, J. Glob. Optim..
[92] G. Cole,et al. Pharmaceutical Production Facilities , 2013 .
[93] Manuel Laguna,et al. Tabu Search , 1997 .
[94] F. Glover,et al. Handbook of Metaheuristics , 2019, International Series in Operations Research & Management Science.