Abstract In the case of a super high-rise building construction project located downtown, where the space for keeping construction materials is extremely limited, a variety of approaches are attempted to enhance such operation ratio. Nevertheless, it is very difficult to derive a proper method of adopting a quantitative indicator, for the purpose of providing a qualitative indicator of operation ratio that depends on the experience of skillful workers. Therefore, decision-making concerning lift planning and operation of the current super high-rise building construction project relies on the experience and intuition of skillful workers, based on a different standard for each construction company. In this study, a lifting planning time calculating algorithm that has been developed is used, in consideration of the acceleration/deceleration capacity of the construction lift. The suggested algorithm is verified through simulation technique, and finally quantitative and systematic methods of lifting operation are proposed.
[1]
Vipin Kumar,et al.
Introduction to Data Mining
,
2022,
Data Mining and Machine Learning Applications.
[2]
Soon-Wook Kwon,et al.
SIMULATION METHOD OF CONSTRUCTION HOIST OPERATING PLAN FOR HIGH RISE BUILDINGS CONSIDERING LIFTING HEIGHTS AND LOADS
,
2010
.
[3]
Yoonseok Shin,et al.
An Algorithm for Hoisting Time Calculation in Super-tall Building Construction
,
2011
.
[4]
William J. Cook,et al.
Solution of a Large-Scale Traveling-Salesman Problem
,
1954,
50 Years of Integer Programming.
[5]
T. B Boffey.
Graph theory in operations research
,
1982
.