Discussion of “Bridging the gap between theory and practice in basic statistical process monitoring”
暂无分享,去创建一个
[1] William H. Woodall,et al. Bridging the gap between theory and practice in basic statistical process monitoring , 2016 .
[2] William H. Woodall,et al. Another Look at the EWMA Control Chart with Estimated Parameters , 2015 .
[3] Charles P. Quesenberry,et al. The Effect of Sample Size on Estimated Limits for and X Control Charts , 1993 .
[4] Lawrence G. Tatum. Robust estimation of the process standard deviation for control charts , 1997 .
[5] Willem Albers,et al. New Corrections for Old Control Charts , 2003 .
[6] Axel Gandy,et al. Guaranteed Conditional Performance of Control Charts via Bootstrap Methods , 2011, 1111.4180.
[7] Ronald J. M. M. Does,et al. On guaranteed in-control performance for the Shewhart X and control charts , 2018 .
[8] Ronald J. M. M. Does,et al. A Robust X¯ Control Chart , 2012, Qual. Reliab. Eng. Int..
[9] Ronald J. M. M. Does,et al. Correction factors for Shewhart and control charts to achieve desired unconditional ARL , 2016 .
[10] Ronald J. M. M. Does,et al. A Robust Standard Deviation Control Chart , 2012, Technometrics.