Hybrid Methods for Resource Allocation and Scheduling Problems in Deterministic and Stochastic Environments
暂无分享,去创建一个
[1] Peter J. Stuckey,et al. Lazy Clause Generation Reengineered , 2009, CP.
[2] Fabrizio Petrini,et al. Cell Multiprocessor Communication Network: Built for Speed , 2006, IEEE Micro.
[3] Ignacio E. Grossmann,et al. Using MILP and CP for the Scheduling of Batch Chemical Processes , 2004, CPAIOR.
[4] Toby Walsh,et al. Handbook of Constraint Programming , 2006, Handbook of Constraint Programming.
[5] Rina Dechter,et al. Constraint Processing , 1995, Lecture Notes in Computer Science.
[6] H. Simonis,et al. A Problem Classification Scheme for Finite Domain Constraint Solving , 2008 .
[7] Nicolas Beldiceanu,et al. Global Constraint Catalog , 2005 .
[8] Nicolas Beldiceanu,et al. A Continuous Multi-resources cumulative Constraint with Positive-Negative Resource Consumption-Production , 2007, CPAIOR.
[9] Jane W.-S. Liu. Real-Time Systems , 2000, Encyclopedia of Algorithms.
[10] Frederik Stork,et al. Stochastic resource-constrained project scheduling , 2001 .
[11] M. Golumbic. Algorithmic Graph Theory and Perfect Graphs (Annals of Discrete Mathematics, Vol 57) , 2004 .
[12] Hadrien Cambazard,et al. Integrating Benders Decomposition Within Constraint Programming , 2005, CP.
[13] Shekhar Y. Borkar,et al. Design challenges of technology scaling , 1999, IEEE Micro.
[14] Wpm Wim Nuijten,et al. Time and resource constrained scheduling : a constraint satisfaction approach , 1994 .
[15] Lurng-Kuo Liu,et al. Video Analysis and Compression on the STI Cell Broadband Engine Processor , 2006, 2006 IEEE International Conference on Multimedia and Expo.
[16] P. Brucker,et al. A new lower bound for the job-shop scheduling problem , 1993 .
[17] Vladimir Stojanovic,et al. Methods for true power minimization , 2002, ICCAD 2002.
[18] Ignacio E. Grossmann,et al. Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods , 2002 .
[19] John N. Hooker,et al. Planning and Scheduling by Logic-Based Benders Decomposition , 2007, Oper. Res..
[20] Nicola Muscettola,et al. Computing the Envelope for Stepwise-Constant Resource Allocations , 2002, CP.
[21] John L. Bresina,et al. Just-In-Case Scheduling , 1994, AAAI.
[22] Wil M. P. van der Aalst,et al. Workflow Data Patterns: Identification, Representation and Tool Support , 2005, ER.
[23] Luca Benini,et al. Multi-stage Benders Decomposition for Optimizing Multicore Architectures , 2008, CPAIOR.
[24] J. Christopher Beck,et al. Constraint-directed techniques for scheduling alternative activities , 2000, Artif. Intell..
[25] Willem Jan van Hoeve,et al. Reduced Cost-Based Ranking for Generating Promising Subproblems , 2002, CP.
[26] Hesham El-Rewini,et al. Scheduling Parallel Program Tasks onto Arbitrary Target Machines , 1990, J. Parallel Distributed Comput..
[27] Lothar Thiele,et al. Design for Timing Predictability , 2004, Real-Time Systems.
[28] Rainer Kolisch. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation , 1994 .
[29] Philip M. Wolfe,et al. Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .
[30] Erik Demeulemeester,et al. The discrete time/resource trade-off problem in project networks: a branch-and-bound approach , 2000 .
[31] Wil M. P. van der Aalst,et al. Time prediction based on process mining , 2011, Inf. Syst..
[32] Jacques F. Benders,et al. Partitioning procedures for solving mixed-variables programming problems , 2005, Comput. Manag. Sci..
[33] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[34] Gerhard Fohler,et al. Static scheduling of pipelined periodic tasks in distributed real-time systems , 1997, Proceedings Ninth Euromicro Workshop on Real Time Systems.
[35] Franz Josef Radermacher,et al. Preselective strategies for the optimization of stochastic project networks under resource constraints , 1983, Networks.
[36] Reha Uzsoy,et al. Lagrangian heuristics for scheduling new product development projects in the pharmaceutical industry , 2007, J. Heuristics.
[37] Michele Lombardi,et al. Challenging Scheduling Problem in the field of System Design , 2007 .
[38] Krzysztof Kuchcinski,et al. Global approach to assignment and scheduling of complex behaviors based on HCDG and constraint programming , 2003, J. Syst. Archit..
[39] Pascal Van Hentenryck,et al. Iterative Relaxations for Iterative Flattening in Cumulative Scheduling , 2004, ICAPS.
[40] Luca Benini,et al. Robust non-preemptive hard real-time scheduling for clustered multicore platforms , 2009, 2009 Design, Automation & Test in Europe Conference & Exhibition.
[41] Kang G. Shin,et al. Improving scalability of task allocation and scheduling in large distributed real-time systems using shared buffers , 2003, The 9th IEEE Real-Time and Embedded Technology and Applications Symposium, 2003. Proceedings..
[42] B. Flachs,et al. A streaming processing unit for a CELL processor , 2005, ISSCC. 2005 IEEE International Digest of Technical Papers. Solid-State Circuits Conference, 2005..
[43] Coniferous softwood. GENERAL TERMS , 2003 .
[44] Roman Barták,et al. Extension of O(n log n) Filtering Algorithms for the Unary Resource Constraint to Optional Activities , 2005, Constraints.
[45] Luca Benini,et al. Optimal resource allocation and scheduling for the CELL BE platform , 2011, Ann. Oper. Res..
[46] Martha E. Pollack,et al. Merging Plans with Quantitative Temporal Constraints, Temporally Extended Actions, and Conditional Branches , 2000, AIPS.
[47] R. Engelbrecht,et al. DIGEST of TECHNICAL PAPERS , 1959 .
[48] E. Boros,et al. Verifying Logic Circuits by Benders Decomposition , 1991 .
[49] Petru Eles,et al. Scheduling and mapping of conditional task graphs for the synthesis of low power embedded systems , 2003, 2003 Design, Automation and Test in Europe Conference and Exhibition.
[50] Georg Ch. Pflug,et al. A branch and bound method for stochastic global optimization , 1998, Math. Program..
[51] J. Erschler,et al. Ordonnancement de tâches sous contraintes: une approche énergetique , 1992 .
[52] Emile H. L. Aarts,et al. Constraint Satisfaction for Multiple Capacitated Job Shop Scheduling , 1994, European Conference on Artificial Intelligence.
[53] Gideon Weiss,et al. Stochastic scheduling problems II-set strategies- , 1985, Z. Oper. Research.
[54] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[55] Toby Walsh,et al. Search in a Small World , 1999, IJCAI.
[56] Daniel Mosse,et al. Guaranteeing fault tolerance through scheduling in real-time systems , 1996 .
[57] Rina Dechter,et al. Bucket Elimination: A Unifying Framework for Reasoning , 1999, Artif. Intell..
[58] Rina Dechter,et al. Temporal Constraint Networks , 1989, Artif. Intell..
[59] J. M. Tamarit,et al. Project scheduling with resource constraints: A branch and bound approach , 1987 .
[60] Ulrich Junker,et al. QUICKXPLAIN: Preferred Explanations and Relaxations for Over-Constrained Problems , 2004, AAAI.
[61] Sönke Hartmann,et al. A survey of variants and extensions of the resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..
[62] Michele Lombardi,et al. A Precedence Constraint Posting Approach for the RCPSP with Time Lags and Variable Durations , 2009, CP.
[63] Philippe Laborie,et al. Complete MCS-Based Search: Application to Resource Constrained Project Scheduling , 2005, IJCAI.
[64] Bert De Reyck,et al. A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations , 1998, Eur. J. Oper. Res..
[65] Peter Brucker,et al. A linear programming and constraint propagation-based lower bound for the RCPSP , 2000, Eur. J. Oper. Res..
[66] Bernd Becker,et al. A Definition and Classification of Timing Anomalies , 2006, WCET.
[67] Michele Lombardi,et al. Stochastic Allocation and Scheduling for Conditional Task Graphs in MPSoCs , 2006, CP.
[68] Petru Eles,et al. Scheduling of conditional process graphs for the synthesis of embedded systems , 1998, DATE.
[69] Michael R. Hansen,et al. Models and formal verification of multiprocessor system-on-chips , 2008, J. Log. Algebraic Methods Program..
[70] Luca Benini,et al. Allocation and Scheduling for MPSoCs via decomposition and no-good generation , 2005, IJCAI.
[71] Krzysztof Kuchcinski,et al. Constraints-driven scheduling and resource assignment , 2003, TODE.
[72] Peter Brucker,et al. A branch and bound algorithm for the resource-constrained project scheduling problem , 1998, Eur. J. Oper. Res..
[73] Matthew L. Ginsberg,et al. Limited Discrepancy Search , 1995, IJCAI.
[74] David Zuckerman,et al. Optimal speedup of Las Vegas algorithms , 1993, [1993] The 2nd Israel Symposium on Theory and Computing Systems.
[75] Erik Demeulemeester,et al. Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..
[76] E.A. Lee,et al. Synchronous data flow , 1987, Proceedings of the IEEE.
[77] Armin Bender. MILP based task mapping for heterogeneous multiprocessor systems , 1996, Proceedings EURO-DAC '96. European Design Automation Conference with EURO-VHDL '96 and Exhibition.
[78] Fahiem Bacchus,et al. Generalized NoGoods in CSPs , 2005, AAAI.
[79] Yuan Xie,et al. Allocation and scheduling of conditional task graph in hardware/software co-synthesis , 2001, Proceedings Design, Automation and Test in Europe. Conference and Exhibition 2001.
[80] L Bianco,et al. The Resource Constrained Project Scheduling Problem with Feeding Precedence Relations: A Lower Bound , 2009 .
[81] David Yeh,et al. Thousand-Core Chips [Roundtable] , 2008, IEEE Design & Test of Computers.
[82] Marianthi G. Ierapetritou,et al. Process scheduling under uncertainty: Review and challenges , 2008, Comput. Chem. Eng..
[83] Salah E. Elmaghraby,et al. Activity networks: Project planning and control by network models , 1977 .
[84] Daniel Brélaz,et al. New methods to color the vertices of a graph , 1979, CACM.
[85] Sanjoy K. Baruah,et al. The Non-preemptive Scheduling of Periodic Tasks upon Multiprocessors , 2006, Real-Time Systems.
[86] Wim Nuijten,et al. Randomized Large Neighborhood Search for Cumulative Scheduling , 2005, ICAPS.
[87] Willem Jan van Hoeve,et al. Global Constraints , 2006, Handbook of Constraint Programming.
[88] J. H. Patterson,et al. An Algorithm for a general class of precedence and resource constrained scheduling problems , 1989 .
[89] J. Hooker,et al. Logic-based Benders decomposition , 2003 .
[90] Jean-Charles Régin,et al. A Filtering Algorithm for Constraints of Difference in CSPs , 1994, AAAI.
[91] Philippe Laborie,et al. Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results , 2003, Artif. Intell..
[92] Stephen F. Smith,et al. From precedence constraint posting to partial order schedules: A CSP approach to Robust Scheduling , 2007, AI Commun..
[93] Michela Milano,et al. Constraint and Integer Programming , 2004, Operations Research/Computer Science Interfaces Series.
[94] Michele Lombardi,et al. Scheduling Conditional Task Graphs , 2007, CP.
[95] Luca Benini,et al. Cellflow: A Parallel Application Development Environment with Run-Time Support for the Cell BE Processor , 2008, 2008 11th EUROMICRO Conference on Digital System Design Architectures, Methods and Tools.
[96] Ken Mai,et al. The future of wires , 2001, Proc. IEEE.
[97] John N. Hooker,et al. A Hybrid Method for the Planning and Scheduling , 2005, Constraints.
[98] Thierry Vidal,et al. Handling contingency in temporal constraint networks: from consistency to controllabilities , 1999, J. Exp. Theor. Artif. Intell..
[99] Rema Padman,et al. An integrated survey of deterministic project scheduling , 2001 .
[100] Vipin Kumar,et al. A Fast and High Quality Multilevel Scheme for Partitioning Irregular Graphs , 1998, SIAM J. Sci. Comput..
[101] V. Maniezzo,et al. An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation , 1998 .
[102] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[103] Edward W. Davis,et al. An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints , 1971 .
[104] A. Shapiro,et al. The Sample Average Approximation Method for Stochastic Programs with Integer Recourse , 2002 .
[105] Luca Benini,et al. A Cooperative, Accurate Solving Framework for Optimal Allocation, Scheduling and Frequency Selection on Energy-Efficient MPSoCs , 2006, 2006 International Symposium on System-on-Chip.
[106] Erik Demeulemeester,et al. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .
[107] Toby Walsh,et al. Stochastic Constraint Programming: A Scenario-Based Approach , 2009, Constraints.
[108] David Wentzlaff,et al. Processor: A 64-Core SoC with Mesh Interconnect , 2010 .
[109] Erlendur S. Thorsteinsson. Bran h-and-Che k: A Hybrid Framework Integrating Mixed Integer Programming and Constraint Logi Programming , 2001 .
[110] S. Asano,et al. The design and implementation of a first-generation CELL processor , 2005, ISSCC. 2005 IEEE International Digest of Technical Papers. Solid-State Circuits Conference, 2005..
[111] Mike Muller. Embedded Processing at the Heart of Life and Style , 2008, 2008 IEEE International Solid-State Circuits Conference - Digest of Technical Papers.
[112] N. J.L.deSiqueira,et al. Explanation-Based Generalisation of Failures , 1988, ECAI.
[113] Hiroshi Inoue,et al. REAL-TIME MUTUAL-INFORMATION-BASED LINEAR REGISTRATION ON THE CELL BROADBAND ENGINE PROCESSOR , 2007, 2007 4th IEEE International Symposium on Biomedical Imaging: From Nano to Macro.
[114] Claude Le Pape,et al. Implementation of resource constraints in ILOG SCHEDULE: a library for the development of constraint-based scheduling systems , 1994 .
[115] Thierry Vidal,et al. CTP: A New Constraint-Based Formalism for Conditional, Temporal Planning , 2003, Constraints.
[116] Maurizio Paganini. Nomadik®: AMobile Multimedia Application Processor Platform , 2007, 2007 Asia and South Pacific Design Automation Conference.
[117] Luca Benini,et al. A Fast and Accurate Technique for Mapping Parallel Applications on Stream-Oriented MPSoC Platforms with Communication Awareness , 2007, International Journal of Parallel Programming.
[118] Willem Jan van Hoeve,et al. Decomposition Based Search - A theoretical and experimental evaluation , 2004, ArXiv.
[119] David A. Bader,et al. On the Design and Analysis of Irregular Algorithms on the Cell Processor: A Case Study of List Ranking , 2007, 2007 IEEE International Parallel and Distributed Processing Symposium.
[120] Gideon Weiss,et al. Stochastic scheduling problems I — General strategies , 1984, Z. Oper. Research.
[121] Alexandru Turjan,et al. System design using Khan process networks: the Compaan/Laura approach , 2004, Proceedings Design, Automation and Test in Europe Conference and Exhibition.
[122] Mathias Weske,et al. Business Process Management: A Survey , 2003, Business Process Management.
[123] Petru Eles,et al. Scheduling and mapping of conditional task graph for the synthesis of low power embedded systems , 2003 .
[124] Umberto Bertelè,et al. Nonserial Dynamic Programming , 1972 .
[125] John N. Hooker,et al. Planning and Scheduling to Minimize Tardiness , 2005, CP.
[126] Sharad Malik,et al. Bounds on power savings using runtime dynamic voltage scaling: an exact algorithm and a linear-time heuristic approximation , 2005, ISLPED '05. Proceedings of the 2005 International Symposium on Low Power Electronics and Design, 2005..
[127] Christian Bessiere,et al. Arc-Consistency and Arc-Consistency Again , 1993, Artif. Intell..
[128] William J. O'Brien,et al. Resource-Constrained Project Scheduling: Past Work and New Directions 1 , 2001 .
[129] Ehl Emile Aarts,et al. A computational study of constraint satisfaction for multiple capacitated job shop scheduling , 1996 .
[130] Sönke Hartmann,et al. Project scheduling with multiple modes: A comparison of exact algorithms , 1998, Networks.
[131] Mathias Weske,et al. Business Process Management: Concepts, Languages, Architectures , 2007 .
[132] Stephen F. Smith,et al. Iterative Flattening: A Scalable Method for Solving Multi-Capacity Scheduling Problems , 2000, AAAI/IAAI.
[133] I. Grossmann,et al. A decomposition approach for the scheduling of a steel plant production , 2001 .
[134] Arno Sprecher,et al. Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm , 1998, Eur. J. Oper. Res..
[135] Rolf H. Möhring,et al. Linear preselective policies for stochastic project scheduling , 2000, Math. Methods Oper. Res..
[136] Philippe Baptiste,et al. Constraint Propagation and Decomposition Techniques for Highly Disjunctive and Highly Cumulative Project Scheduling Problems , 1997, CP.
[137] Andrea Lodi,et al. Cost-Based Domain Filtering , 1999, CP.
[138] Gerhard Friedrich,et al. Handling Alternative Activities in Resource-Constrained Project Scheduling Problems , 2007, IJCAI.
[139] Krzysztof Kuchcinski,et al. A constructive algorithm for memory-aware task assignment and scheduling , 2001, CODES '01.
[140] John R. Graham. Integrating parallel programming techniques into traditional computer science curricula , 2007, SGCS.
[141] Andrea Lodi,et al. A Hybrid Exact Algorithm for the TSPTW , 2002, INFORMS J. Comput..
[142] Mark A. Peot,et al. Conditional nonlinear planning , 1992 .
[143] Fahiem Bacchus,et al. Extending Forward Checking , 2000, CP.
[144] Carmen Gervet,et al. Conjunto: Constraint Logic Programming with Finite Set Domains , 1994, ILPS.
[145] Ranga Vemuri,et al. Hardware-software partitioning and pipelined scheduling of transformative applications , 2002, IEEE Trans. Very Large Scale Integr. Syst..
[146] Lakhdar Sais,et al. Boosting Systematic Search by Weighting Constraints , 2004, ECAI.
[147] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[148] Mark Horowitz,et al. Scaling, Power and the Future of CMOS , 2007, 20th International Conference on VLSI Design held jointly with 6th International Conference on Embedded Systems (VLSID'07).
[149] Rainer Kolisch,et al. Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem , 1995 .
[150] Nicola Muscettola,et al. Temporal Dynamic Controllability Revisited , 2005, AAAI.
[151] Luca Benini,et al. A survey of design techniques for system-level dynamic power management , 2000, IEEE Trans. Very Large Scale Integr. Syst..
[152] Grant Martin,et al. Overview of the MPSoC design challenge , 2006, 2006 43rd ACM/IEEE Design Automation Conference.
[153] Rami G. Melhem,et al. Enhancing real-time schedules to tolerate transient faults , 1995, Proceedings 16th IEEE Real-Time Systems Symposium.
[154] Ian P. Gent,et al. Symmetry Breaking in Constraint Programming , 2000, ECAI.
[155] Peter van Beek,et al. Backtracking Search Algorithms , 2006, Handbook of Constraint Programming.
[156] André Langevin,et al. Dispatching and Conflict-Free Routing of Automated Guided Vehicles: An Exact Approach , 2002 .
[157] Nathan Fisher,et al. The Partitioned Multiprocessor Scheduling of Non-preemptive Sporadic Task Systems ∗ , 2006 .
[158] Willy Herroelen,et al. Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..
[159] Jun Sun,et al. Synchronization protocols in distributed real-time systems , 1996, Proceedings of 16th International Conference on Distributed Computing Systems.
[160] Paolo Faraboschi,et al. Instruction scheduling for instruction level parallel processors , 2001, Proc. IEEE.
[161] Michael H. Rothkopf. Scheduling with Random Service Times , 1966 .
[162] J. M. Moore. An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .
[163] Rajesh K. Gupta,et al. Dynamic slack reclamation with procrastination scheduling in real-time embedded systems , 2005, Proceedings. 42nd Design Automation Conference, 2005..
[164] Gilles Kahn,et al. The Semantics of a Simple Language for Parallel Programming , 1974, IFIP Congress.
[165] Jean-Charles Régin,et al. Generalized Arc Consistency for Global Cardinality Constraint , 1996, AAAI/IAAI, Vol. 1.
[166] Wayne E. Smith. Various optimizers for single‐stage production , 1956 .
[167] Robert M. Haralick,et al. Increasing Tree Search Efficiency for Constraint Satisfaction Problems , 1979, Artif. Intell..
[168] Hadrien Cambazard,et al. Decomposition and Learning for a Hard Real Time Task Allocation Problem , 2004, CP.
[169] Alice C. Parker,et al. SOS: Synthesis of application-specific heterogeneous multiprocessor systems , 2001, J. Parallel Distributed Comput..
[170] Gilbert Laporte,et al. The integer L-shaped method for stochastic integer programs with complete recourse , 1993, Oper. Res. Lett..
[171] Luca Benini,et al. Allocation, Scheduling and Voltage Scaling on Energy Aware MPSoCs , 2006, CPAIOR.
[172] Philippe Baptiste,et al. Constraint-based scheduling , 2001 .
[173] Mohammad Ranjbar,et al. A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling , 2009, Eur. J. Oper. Res..
[174] J. Erschler,et al. Raisonnement temporel sous contraintes de ressource et problèmes d'ordonnancement , 1991 .
[175] Peter J. Stuckey,et al. Why Cumulative Decomposition Is Not as Bad as It Sounds , 2009, CP.
[176] M. Golumbic. Algorithmic graph theory and perfect graphs , 1980 .
[177] Marco Laumanns,et al. Performance assessment of multiobjective optimizers: an analysis and review , 2003, IEEE Trans. Evol. Comput..
[178] Rainer Kolisch,et al. Experimental investigation of heuristics for resource-constrained project scheduling: An update , 2006, Eur. J. Oper. Res..
[179] F. Frances Yao,et al. A scheduling model for reduced CPU energy , 1995, Proceedings of IEEE 36th Annual Foundations of Computer Science.
[180] Luca Baldini,et al. Synthesis of pipelined systems for the contemporaneous execution of periodic and aperiodic tasks with hard real-time constraints , 2004, 18th International Parallel and Distributed Processing Symposium, 2004. Proceedings..
[181] Petru Eles,et al. Overhead-conscious voltage selection for dynamic and leakage energy reduction of time-constrained systems , 2004, Proceedings Design, Automation and Test in Europe Conference and Exhibition.
[182] Michele Lombardi,et al. Allocation and scheduling of Conditional Task Graphs , 2010, Artif. Intell..
[183] Rolf H. Möhring,et al. Scheduling project networks with resource constraints and time windows , 1988 .
[184] Jakob Axelsson. Architecture synthesis and partitioning of real-time systems: a comparison of three heuristic search strategies , 1997, Proceedings of 5th International Workshop on Hardware/Software Co Design. Codes/CASHE '97.
[185] Franz Josef Radermacher,et al. Algorithmic approaches to preselective strategies for stochastic scheduling problems , 1983, Networks.
[186] Petru Eles,et al. Bus access optimization for distributed embedded systems based on schedulability analysis , 2000, DATE '00.
[187] Fabrizio Petrini,et al. Multicore Surprises: Lessons Learned from Optimizing Sweep3D on the Cell Broadband Engine , 2007, 2007 IEEE International Parallel and Distributed Processing Symposium.
[188] David D. Bedworth,et al. Integrated Production, Control Systems: Management, Analysis, and Design , 1982 .
[189] M. Suzuoki,et al. Overview of the architecture, circuit design, and physical implementation of a first-generation cell processor , 2006, IEEE Journal of Solid-State Circuits.
[190] Roman Barták,et al. Temporal Networks with Alternatives: Complexity and Model , 2007, FLAIRS.
[191] E. W. Davis,et al. Multiple Resource–Constrained Scheduling Using Branch and Bound , 1978 .
[192] Roman Barták,et al. Modelling Alternatives in Temporal Networks , 2007, 2007 IEEE Symposium on Computational Intelligence in Scheduling.
[193] Paul Shaw,et al. Using Constraint Programming and Local Search Methods to Solve Vehicle Routing Problems , 1998, CP.
[194] Mats Carlsson,et al. New Filtering for the cumulative Constraint in the Context of Non-Overlapping Rectangles , 2008, CPAIOR.
[195] Lucio Bianco,et al. An Exact Algorithm to Minimize the Makespan in Project Scheduling with Scarce Resources and Feeding Precedence Relations , 2009, CTW.
[196] J. Christopher Beck,et al. A General Framework for Scheduling in a Stochastic Environment , 2007, IJCAI.
[197] Francesco Poletti,et al. Communication-aware allocation and scheduling framework for stream-oriented multi-processor systems-on-chip , 2006, Proceedings of the Design Automation & Test in Europe Conference.
[198] Dongkun Shin,et al. Power-aware scheduling of conditional task graphs in real-time multiprocessor systems , 2003, ISLPED '03.
[199] Nicola Muscettola,et al. Dynamic Control Of Plans With Temporal Uncertainty , 2001, IJCAI.
[200] Vipul Jain,et al. Algorithms for Hybrid MILP/CP Models for a Class of Optimization Problems , 2001, INFORMS J. Comput..
[201] Philippe Refalo,et al. Impact-Based Search Strategies for Constraint Programming , 2004, CP.
[202] Ken Kennedy,et al. Optimizing Compilers for Modern Architectures: A Dependence-based Approach , 2001 .
[203] Trevor N. Mudge,et al. Power: A First-Class Architectural Design Constraint , 2001, Computer.
[204] Lothar Thiele,et al. Mapping Applications to Tiled Multiprocessor Embedded Systems , 2007, Seventh International Conference on Application of Concurrency to System Design (ACSD 2007).
[205] Luca Benini,et al. A Constraint Programming Approach for Allocation and Scheduling on the CELL Broadband Engine , 2008, CP.
[206] BendersDecompositionJ. N. Hooker,et al. Verifying Logic Circuits by Benders Decomposition , 1994 .
[207] Solomon W. Golomb,et al. Backtrack Programming , 1965, JACM.
[208] Christian Bessiere,et al. MAC and Combined Heuristics: Two Reasons to Forsake FC (and CBJ?) on Hard Problems , 1996, CP.
[209] Klaus Neumann,et al. Resource-Constrained Project Scheduling with Time Windows , 2006 .
[210] Malik Ghallab,et al. Planning with Sharable Resource Constraints , 1995, IJCAI.
[211] Klaus Neumann,et al. Project scheduling with inventory constraints , 2003, Math. Methods Oper. Res..
[212] Andrea Lodi,et al. Optimization-Oriented Global Constraints , 2004, Constraints.
[213] Ahmed Amine Jerraya,et al. Roundtable: Envisioning the Future for Multiprocessor SoC , 2007, IEEE Des. Test Comput..
[214] Toby Walsh,et al. Stochastic Constraint Programming , 2002, ECAI.