Synchronized Phasors Monitoring During the Islanding Maneuver of an Active Distribution Network

The paper describes the performances of a phasor measurement unit (PMU) prototype based on a synchrophasor estimation algorithm conceived for the monitoring of active distribution networks, as well as its experimental application during some intentional islanding and reconnection tests of an urban medium voltage power network. With respect to typical applications in transmission networks, the use of PMUs in distribution networks requires very low values of total vector error (TVE), which involves particular low values of phase errors of the synchrophasor estimates. These requirements are met by a specifically developed PMU, the characteristics and experimental characterization of which are illustrated in the paper. Three of these PMUs have been then used to monitor experimental tests carried out to assess the capability of a urban distribution network to operate autonomously when fed by a local 80 MW combined-cycle power plant. The information provided by the installed PMUs significantly facilitate the operator maneuvers and appear to be useful for the development of an improved control and management system of the active distribution network.

[1]  Carlo Muscas,et al.  A Flexible GPS-Based System for Synchronized Phasor Measurement in Electric Distribution Networks , 2006, IEEE Transactions on Instrumentation and Measurement.

[2]  James S. Thorp,et al.  IEEE Standard for Synchrophasors for Power Systems , 1998 .

[3]  A.G. Phadke,et al.  Synchronized phasor measurements in power systems , 1993, IEEE Computer Applications in Power.

[4]  T. Grandke Interpolation Algorithms for Discrete Fourier Transforms of Weighted Signals , 1983, IEEE Transactions on Instrumentation and Measurement.

[5]  M. Paolone,et al.  Analysis of black-startup and islanding capabilities of a combined cycle power plant , 2008, 2008 43rd International Universities Power Engineering Conference.

[6]  S. Standard GUIDE TO THE EXPRESSION OF UNCERTAINTY IN MEASUREMENT , 2006 .

[7]  M. Imai,et al.  New type of islanding detection system for distributed generation based on voltage angle difference between utility network and distributed generation site , 2004 .

[8]  R.J. Best,et al.  Differential ROCOF relay for Loss-of-Mains protection of Renewable Generation using phasor measurement over Internet Protocol , 2009, 2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources Into the Power Delivery System.

[9]  Nikos D. Hatziargyriou,et al.  Integrating distributed generation into electric power systems: A review of drivers, challenges and opportunities , 2007 .

[10]  D. Paunescu,et al.  Future distribution systems with dispersed generation will require network security measures as transmission systems of today , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.

[11]  B. Kasztenny,et al.  Development and Implementation of a Synchrophasor Estimator Capable of Measurements Under Dynamic Conditions , 2008, IEEE Transactions on Power Delivery.

[12]  D John Morrow,et al.  Synchrophasor Broadcast Over Internet Protocol for Distributed Generator Synchronization , 2010, IEEE Transactions on Power Delivery.

[13]  Przemyslaw Komarnicki,et al.  Observability of the distribution system , 2009 .

[14]  M. Paolone,et al.  Development of an RTU for synchrophasors estimation in active distribution networks , 2009, 2009 IEEE Bucharest PowerTech.

[15]  A.G. Phadke,et al.  Synchronized Phasor and Frequency Measurement Under Transient Conditions , 2009, IEEE Transactions on Power Delivery.

[16]  Arun G. Phadke,et al.  Synchronized Phasor Measurements and Their Applications , 2008 .

[17]  A.H. Nielsen,et al.  Monitoring of power system events at transmission and distribution level , 2006, IEEE Transactions on Power Systems.

[18]  J. Thorp,et al.  A New Measurement Technique for Tracking Voltage Phasors, Local System Frequency, and Rate of Change of Frequency , 1983, IEEE Transactions on Power Apparatus and Systems.

[19]  Jan Svec,et al.  The monitoring of power system events on transmission and distribution level by the use of phasor measurements units (PMU) , 2009 .