Production-flow-value-based job dispatching method for semiconductor manufacturing

In a wafer manufacturing system, the value added to a particular product at a station may differ significantly from that added to a different product at the same station. If an enterprise concentrates mainly on generating profits, throughput becomes a poor performance measurement for a manufacturing system. Job dispatching rules based on maximum throughput no longer guarantee maximizing profit. Hence, profitability would be a good alternative measurement. The main purpose of this study is to develop a production-flow-value-based job dispatching rule (PFV) by the theory of constraints (TOC) for wafer fabrication. This study derives a TOC cost estimation method and a profitability estimate of a WIP-wafer lot. Jobs are then prioritized based on their profitability. Thus the PFV job dispatching rule is developed. For comparison, two job dispatching rules, MCR and MBS, are also arbitrarily selected to perform simulations. The simulation results reveal that the proposed PFV maximizes the production flow value, while MCR and MBS do not.

[1]  Jonathan F. Bard,et al.  The use of upstream and downstream information in scheduling semiconductor batch operations , 1995 .

[2]  R. C. Leachman,et al.  An improved methodology for real-time production decisions at batch-process work stations , 1993 .

[3]  C. R. Glassey,et al.  Bottleneck starvation indicators for shop floor control (semiconductor manufacturing process) , 1988 .

[4]  Shu-Hsing Chung,et al.  The TOC-based algorithm for solving product mix problems , 1998 .

[5]  Reha Uzsoy,et al.  A review of production planning and scheduling models in the semiconductor industry , 1994 .

[6]  Peter Schuur,et al.  Dynamic Job Assignment Heuristics for Multi-Server Batch Operations , 1997 .

[7]  S. S. Panwalkar,et al.  A Survey of Scheduling Rules , 1977, Oper. Res..

[8]  Don T. Phillips,et al.  A state-of-the-art survey of dispatching rules for manufacturing job shop operations , 1982 .

[9]  Mauricio G. C. Resende,et al.  Closed-loop job release control for VLSI circuit manufacturing , 1988 .

[10]  Reha Uzsoy,et al.  A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .

[11]  Angappa Gunasekaran,et al.  Implementation of activity-based costing in manufacturing , 1998 .

[12]  John W. Fowler,et al.  Real-time control of multiproduct bulk-service semiconductor manufacturing processes , 1992 .

[13]  John H. Blackstone,et al.  Theory of constraints - A status report , 2001 .

[14]  C. Roger Glassey,et al.  Bottleneck Starvation Indicators for Shop Floor Control , 1988 .

[15]  Michel Baudin Manufacturing systems analysis : with application to production scheduling , 1990 .

[16]  Robert C. Kee,et al.  A comparative analysis of utilizing activity-based costing and the theory of constraints for making product-mix decisions , 2000 .

[17]  Lawrence D. Fredendall,et al.  Improving the product mix heuristic in the theory of constraints , 1997 .

[18]  M. S. Spencer,et al.  Performance measurement in a theory of constraints environment , 1998 .

[19]  C. R. Glassey,et al.  Dynamic batching heuristic for simultaneous processing , 1991 .

[20]  A. J. Clewett,et al.  Introduction to sequencing and scheduling , 1974 .

[21]  Arnick Boons,et al.  Product costing for complex manufacturing systems , 1998 .

[22]  R. J. Lewis Activity-Based Models for Cost Management Systems , 1995 .

[23]  Yoshiro Ikura,et al.  Efficient scheduling algorithms for a single batch processing machine , 1986 .

[24]  N. G. Pierce,et al.  Value-based dispatching for semiconductor wafer fabrication , 2000, 2000 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop. ASMC 2000 (Cat. No.00CH37072).