Applying Value Stream Mapping Technique for Production Improvement in a Manufacturing Company: A Case Study

The purpose of this paper is to explain how value stream mapping (VSM) is helpful in lean implementation and to develop the road map to tackle improvement areas to bridge the gap between the existing state and the proposed state of a manufacturing firm. Through this case study, the existing stage of manufacturing is mapped with the help of VSM process symbols and the biggest improvement areas like excessive TAKT time, production, and lead time are identified. Some modifications in current state map are suggested and with these modifications future state map is prepared. Further TAKT time is calculated to set the pace of production processes. This paper compares the current state and future state of a manufacturing firm and witnessed 20 % reduction in TAKT time, 22.5 % reduction in processing time, 4.8 % reduction in lead time, 20 % improvement in production, 9 % improvement in machine utilization, 7 % improvement in man power utilization, objective improvement in workers skill level, and no change in the product and semi finished product inventory level. The findings are limited due to the focused nature of the case study. This case study shows that VSM is a powerful tool for lean implementation and allows the industry to understand and continuously improve towards lean manufacturing.

[1]  M. L. Emiliani,et al.  Using value‐stream maps to improve leadership , 2004 .

[2]  David Taylor,et al.  Manufacturing Operations and Supply Chain Management: The LEAN Approach , 2000 .

[3]  R. Schonberger Japanese manufacturing techniques : nine hidden lessons simplicity , 1982 .

[4]  John R. Shook,et al.  Learning to See: Value Stream Mapping to Create Value and , 1998 .

[5]  Preetinder Singh Gill Application of Value Stream Mapping to Eliminate Waste in an Emergency Room , 2012 .

[6]  John B. Kidd,et al.  Toyota Production System , 1993 .

[7]  Jayant Rajgopal,et al.  Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study , 2007 .

[8]  Kuldip Singh Sangwan,et al.  Productivity and quality improvement through value stream mapping: a case study of Indian automotive industry , 2012 .

[9]  Bhim Singh,et al.  Value stream mapping as a versatile tool for lean implementation: an Indian case study of a manufacturing firm , 2009 .

[10]  Cecil Bozarth,et al.  ANALYZING THE IMPACT OF SPACE UTILIZATION AND PRODUCTION PLANNING ON PLANT SPACE REQUIREMENTS - A CASE STUDY AND METHODOLOGY , 2006 .

[11]  Daniel T. Jones,et al.  The machine that changed the world : based on the Massachusetts Institute of Technology 5-million dollar 5-year study on the future of the automobile , 1990 .

[12]  John Naylor Operations Management , 1995 .

[13]  James Richardson Beyond Partnership: Strategies for Innovation and Lean Supply , 1994 .

[14]  Nick Rich,et al.  The seven value stream mapping tools , 1997 .

[15]  G. Saranya Improvement of Crankshaft Assembly Supply Chain Using Lean Techniques-A Case Study , 2012 .

[16]  S. Vinodh,et al.  Application of value stream mapping in an Indian camshaft manufacturing organisation , 2010 .