A new approach for project scheduling using fuzzy dependency structure matrix

As an alternative solution, the Dependency Structure Matrix (DSM) is a useful tool in project scheduling when approaching information dependency issues between activities. However, the current DSM ...

[1]  Tyson R. Browning,et al.  Applying the design structure matrix to system decomposition and integration problems: a review and new directions , 2001, IEEE Trans. Engineering Management.

[2]  Jian Zuo,et al.  Prediction System for Change Management in Construction Project , 2010 .

[3]  Yao-Tsung Ko,et al.  A Dynamic Planning Approach for New Product Development , 2009, Concurr. Eng. Res. Appl..

[4]  Chen-Tung Chen,et al.  Applying fuzzy method for measuring criticality in project network , 2007, Inf. Sci..

[5]  Yoram Reich,et al.  From DSM-Based Planning to Design Process Simulation: A Review of Process Scheme Logic Verification Issues , 2009, IEEE Transactions on Engineering Management.

[6]  Wei Chen,et al.  Project scheduling for collaborative product development using DSM , 2003 .

[7]  Syed Ahsan Sharif,et al.  DSM as a knowledge capture tool in CODE environment , 2007, J. Intell. Manuf..

[8]  Yuanfang Cai,et al.  Coordination Implications of Software Architecture in a Global Software Development Project , 2008, Seventh Working IEEE/IFIP Conference on Software Architecture (WICSA 2008).

[9]  Robert P. Smith,et al.  A model-based method for organizing tasks in product development , 1994 .

[10]  Srinivas N Mohan Managing unmanned flight projects using methods in complex product development , 2002, Proceedings, IEEE Aerospace Conference.

[11]  Amr A. Oloufa,et al.  Using DSM for modeling information flow in construction design projects , 2004 .

[12]  Steven D. Eppinger,et al.  A decision support tool for predicting the impact of development process improvements , 2001 .

[13]  Ali A. Yassine,et al.  Engineering design management: An information structure approach , 1999 .

[14]  Morteza Bagherpour,et al.  A new approach for solving fuzzy critical path problem using analysis of events , 2011, Expert Syst. Appl..

[15]  Lou Y. Liang Grouping decomposition under constraints for design/build life cycle in project delivery system , 2009, Int. J. Technol. Manag..

[16]  Matthew J. Liberatore,et al.  Critical Path Analysis With Fuzzy Activity Times , 2008, IEEE Transactions on Engineering Management.

[17]  S D Eppinger,et al.  Innovation at the speed of information. , 2001, Harvard business review.

[18]  Osama Moselhi,et al.  Forecasting project status by using fuzzy logic , 2006 .

[19]  Shih-Pin Chen,et al.  A simple approach to fuzzy critical path analysis in project networks , 2008 .

[20]  Steven D. Eppinger,et al.  A Model-Based Framework to Overlap Product Development Activities , 1997 .

[21]  Mao-Jiun J. Wang,et al.  A fuzzy multi-criteria decision-making approach for robot selection , 1993 .

[22]  Koshy Varghese,et al.  A web-based system for design interface management of construction projects , 2010 .

[23]  A. Kaufmann,et al.  Introduction to fuzzy arithmetic : theory and applications , 1986 .

[24]  Ying-Shen Juang,et al.  An integrated information system for product design planning , 2008, Expert Syst. Appl..

[25]  Koshy Varghese,et al.  Project Scheduling using Dependency Structure Matrix , 2005 .

[26]  Baoding Liu,et al.  Fuzzy project scheduling problem and its hybrid intelligent algorithm , 2010 .

[27]  Ali Yassine,et al.  Complex Concurrent Engineering and the Design Structure Matrix Method , 2003, Concurr. Eng. Res. Appl..

[28]  D. V. Steward,et al.  The design structure system: A method for managing the design of complex systems , 1981, IEEE Transactions on Engineering Management.

[29]  Koshy Varghese,et al.  Application of Dependency Structure Matrix for Activity Sequencing in Concurrent Engineering Projects , 2006 .