A new approach for project scheduling using fuzzy dependency structure matrix
暂无分享,去创建一个
[1] Tyson R. Browning,et al. Applying the design structure matrix to system decomposition and integration problems: a review and new directions , 2001, IEEE Trans. Engineering Management.
[2] Jian Zuo,et al. Prediction System for Change Management in Construction Project , 2010 .
[3] Yao-Tsung Ko,et al. A Dynamic Planning Approach for New Product Development , 2009, Concurr. Eng. Res. Appl..
[4] Chen-Tung Chen,et al. Applying fuzzy method for measuring criticality in project network , 2007, Inf. Sci..
[5] Yoram Reich,et al. From DSM-Based Planning to Design Process Simulation: A Review of Process Scheme Logic Verification Issues , 2009, IEEE Transactions on Engineering Management.
[6] Wei Chen,et al. Project scheduling for collaborative product development using DSM , 2003 .
[7] Syed Ahsan Sharif,et al. DSM as a knowledge capture tool in CODE environment , 2007, J. Intell. Manuf..
[8] Yuanfang Cai,et al. Coordination Implications of Software Architecture in a Global Software Development Project , 2008, Seventh Working IEEE/IFIP Conference on Software Architecture (WICSA 2008).
[9] Robert P. Smith,et al. A model-based method for organizing tasks in product development , 1994 .
[10] Srinivas N Mohan. Managing unmanned flight projects using methods in complex product development , 2002, Proceedings, IEEE Aerospace Conference.
[11] Amr A. Oloufa,et al. Using DSM for modeling information flow in construction design projects , 2004 .
[12] Steven D. Eppinger,et al. A decision support tool for predicting the impact of development process improvements , 2001 .
[13] Ali A. Yassine,et al. Engineering design management: An information structure approach , 1999 .
[14] Morteza Bagherpour,et al. A new approach for solving fuzzy critical path problem using analysis of events , 2011, Expert Syst. Appl..
[15] Lou Y. Liang. Grouping decomposition under constraints for design/build life cycle in project delivery system , 2009, Int. J. Technol. Manag..
[16] Matthew J. Liberatore,et al. Critical Path Analysis With Fuzzy Activity Times , 2008, IEEE Transactions on Engineering Management.
[17] S D Eppinger,et al. Innovation at the speed of information. , 2001, Harvard business review.
[18] Osama Moselhi,et al. Forecasting project status by using fuzzy logic , 2006 .
[19] Shih-Pin Chen,et al. A simple approach to fuzzy critical path analysis in project networks , 2008 .
[20] Steven D. Eppinger,et al. A Model-Based Framework to Overlap Product Development Activities , 1997 .
[21] Mao-Jiun J. Wang,et al. A fuzzy multi-criteria decision-making approach for robot selection , 1993 .
[22] Koshy Varghese,et al. A web-based system for design interface management of construction projects , 2010 .
[23] A. Kaufmann,et al. Introduction to fuzzy arithmetic : theory and applications , 1986 .
[24] Ying-Shen Juang,et al. An integrated information system for product design planning , 2008, Expert Syst. Appl..
[25] Koshy Varghese,et al. Project Scheduling using Dependency Structure Matrix , 2005 .
[26] Baoding Liu,et al. Fuzzy project scheduling problem and its hybrid intelligent algorithm , 2010 .
[27] Ali Yassine,et al. Complex Concurrent Engineering and the Design Structure Matrix Method , 2003, Concurr. Eng. Res. Appl..
[28] D. V. Steward,et al. The design structure system: A method for managing the design of complex systems , 1981, IEEE Transactions on Engineering Management.
[29] Koshy Varghese,et al. Application of Dependency Structure Matrix for Activity Sequencing in Concurrent Engineering Projects , 2006 .