The Integration of Planning into Scheduling with OMP
暂无分享,去创建一个
[1] Roman Barták. Visopt ShopFloor: On the Edge of Planning and Scheduling , 2002, CP.
[2] Subbarao Kambhampati,et al. Planning the project management way: Efficient planning by effective integration of causal and resource reasoning in RealPlan , 2001, Artif. Intell..
[3] Rina Dechter,et al. Temporal Constraint Networks , 1989, Artif. Intell..
[4] Jeremy Frank,et al. Constraint-Based Attribute and Interval Planning , 2003, Constraints.
[5] Malik Ghallab,et al. Planning with Sharable Resource Constraints , 1995, IJCAI.
[6] Stephen F. Smith,et al. Coordinating space telescope operations in an integrated planning and scheduling architecture , 1991, IEEE Control Systems.
[7] A. Cesta,et al. DDL.1: a formal description of a constraint representation language for physical domains , 1996 .
[8] Austin Tate,et al. O-Plan: control in the open planning architecture , 1986 .
[9] Stephen F. Smith,et al. Generating Feasible Schedules under Complex Metric Constraints , 1994, AAAI.
[10] Nicola Muscettola,et al. Planning in Interplanetary Space: Theory and Practice , 2000, AIPS.
[11] Stephen F. Smith,et al. A Constraint-Based Method for Project Scheduling with Time Windows , 2002, J. Heuristics.
[12] Amedeo Cesta,et al. Evaluating plans through restrictiveness and resource strength , 2005 .
[13] Amedeo Cesta,et al. Planning with Concurrency, Time and Resources: A CSP-Based Approach , 2005 .
[14] Malik Ghallab,et al. Representation and Control in IxTeT, a Temporal Planner , 1994, AIPS.
[15] Nicola Muscettola,et al. HSTS: Integrating Planning and Scheduling , 1993 .