EVALUATING THE TRADE‐OFFS BETWEEN IDLING AND SHUTTING DOWN PRODUCTION LINES IN PROCESS INDUSTRIES
暂无分享,去创建一个
[1] Alan S. Manne,et al. Programming of Economic Lot Sizes , 1958 .
[2] Laurence A. Wolsey,et al. Uncapacitated Lot-Sizing Problems with Start-Up Costs , 1989, Oper. Res..
[3] Philip Wolfe,et al. Validation of subgradient optimization , 1974, Math. Program..
[4] Earl E. Bomberger,et al. A Dynamic Programming Approach to a Lot Size Scheduling Problem , 1966 .
[5] Matthew J. Sobel. Smoothing Start-Up and Shut-Down Costs in Sequential Production , 1969, Oper. Res..
[6] Thomas L. Magnanti,et al. A Strong Cutting Plane Algorithm for Production Scheduling with Changeover Costs , 1990, Oper. Res..
[7] Linus Schrage,et al. The Multiproduct Lot Scheduling Problem , 1982 .
[8] Hamilton Emmons,et al. Scheduling Production on One Machine with Changeover Costs , 1977 .
[9] Gabriel R. Bitran,et al. ON THE DESIGN OF HIERARCHICAL PRODUCTION PLANNING SYSTEMS , 1977 .
[10] Robin O. Roundy,et al. Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems , 1989 .
[11] S. Elmaghraby. The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .
[12] W. Zangwill. A Deterministic Multi-Period Production Scheduling Model with Backlogging , 1966 .
[13] Uday S. Karmarkar,et al. The Dynamic Lot-Sizing Problem with Startup and Reservation Costs , 1987, Oper. Res..
[14] Gregory Dobson,et al. The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes , 1987, Oper. Res..
[15] Renato de Matta. A Lagrangean decomposition solution to a single line multiproduct scheduling problem , 1994 .
[16] M. Guignard,et al. Applying a modified coefficient reduction method to a dynamic production scheduling model , 1992 .
[17] Tan Miller,et al. A Hierarchical Production Planning System , 1985 .
[18] A. F. Veinott. Production Planning with Convex Costs: A Parametric Study , 1964 .
[19] Robert C. Leachman,et al. A Dynamic Programming Solution to the Dynamic, Multi-Item, Single-Machine Scheduling Problem , 1988, Oper. Res..
[20] Thom J. Hodgson,et al. Addendum to Stankard and Gupta's Note on Lot Size Scheduling , 1970 .
[21] E. Silver. Deliberately slowing down output in a family production context , 1990 .
[22] Matthew J. Sobel,et al. Smoothing Start-Up and Shut-Down Costs: Concave Case , 1970 .
[23] Tan Miller,et al. A Note on the Growth of a Production Planning System: A Case Study in Evolution , 1993 .
[24] Uday S. Karmarkar,et al. The Deterministic Dynamic Product Cycling Problem , 1985, Oper. Res..
[25] C. R. Glassey,et al. Minimum Change-Over Scheduling of Several Products on One Machine , 1968, Oper. Res..
[26] Laurence A. Wolsey,et al. Coefficient reduction for inequalities in 0–1 variables , 1974, Math. Program..
[27] Monique Guignard-Spielberg,et al. Dynamic Production Scheduling for a Process Industry , 1994, Oper. Res..
[28] P. C. Jones,et al. When Is The Economic Lot Scheduling Problem Easy , 1989 .
[29] Harvey M. Wagner,et al. Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..
[30] Ferydoon Kianfar. Stronger Inequalities for 0, 1 Integer Programming Using Knapsack Functions , 1971, Oper. Res..
[31] C L Doll,et al. AN ITERATIVE PROCEDURE FOR THE SINGLE-MACHINE, MULTI-PRODUCT LOT SCHEDULING PROBLEM : A WORKING PAPER , 1973 .