EVALUATING THE TRADE‐OFFS BETWEEN IDLING AND SHUTTING DOWN PRODUCTION LINES IN PROCESS INDUSTRIES

The costs of starting-up and shutting down production lines (and plants) in a process industry are often quite high. Therefore, when a plant's capacity significantly exceeds its forecast demand over an annual planning horizon, a manufacturer must either plan temporary production line shutdowns during the year, or plan to temporarily idle production lines without formally shutting line(s) down. The trade-offs between these two strategies can be complex. In this paper, we propose a methodology to evaluate the impact of both strategies on a plant's production costs by developing an analytical model based on the authors' experience with several process industries.

[1]  Alan S. Manne,et al.  Programming of Economic Lot Sizes , 1958 .

[2]  Laurence A. Wolsey,et al.  Uncapacitated Lot-Sizing Problems with Start-Up Costs , 1989, Oper. Res..

[3]  Philip Wolfe,et al.  Validation of subgradient optimization , 1974, Math. Program..

[4]  Earl E. Bomberger,et al.  A Dynamic Programming Approach to a Lot Size Scheduling Problem , 1966 .

[5]  Matthew J. Sobel Smoothing Start-Up and Shut-Down Costs in Sequential Production , 1969, Oper. Res..

[6]  Thomas L. Magnanti,et al.  A Strong Cutting Plane Algorithm for Production Scheduling with Changeover Costs , 1990, Oper. Res..

[7]  Linus Schrage,et al.  The Multiproduct Lot Scheduling Problem , 1982 .

[8]  Hamilton Emmons,et al.  Scheduling Production on One Machine with Changeover Costs , 1977 .

[9]  Gabriel R. Bitran,et al.  ON THE DESIGN OF HIERARCHICAL PRODUCTION PLANNING SYSTEMS , 1977 .

[10]  Robin O. Roundy,et al.  Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems , 1989 .

[11]  S. Elmaghraby The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .

[12]  W. Zangwill A Deterministic Multi-Period Production Scheduling Model with Backlogging , 1966 .

[13]  Uday S. Karmarkar,et al.  The Dynamic Lot-Sizing Problem with Startup and Reservation Costs , 1987, Oper. Res..

[14]  Gregory Dobson,et al.  The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes , 1987, Oper. Res..

[15]  Renato de Matta A Lagrangean decomposition solution to a single line multiproduct scheduling problem , 1994 .

[16]  M. Guignard,et al.  Applying a modified coefficient reduction method to a dynamic production scheduling model , 1992 .

[17]  Tan Miller,et al.  A Hierarchical Production Planning System , 1985 .

[18]  A. F. Veinott Production Planning with Convex Costs: A Parametric Study , 1964 .

[19]  Robert C. Leachman,et al.  A Dynamic Programming Solution to the Dynamic, Multi-Item, Single-Machine Scheduling Problem , 1988, Oper. Res..

[20]  Thom J. Hodgson,et al.  Addendum to Stankard and Gupta's Note on Lot Size Scheduling , 1970 .

[21]  E. Silver Deliberately slowing down output in a family production context , 1990 .

[22]  Matthew J. Sobel,et al.  Smoothing Start-Up and Shut-Down Costs: Concave Case , 1970 .

[23]  Tan Miller,et al.  A Note on the Growth of a Production Planning System: A Case Study in Evolution , 1993 .

[24]  Uday S. Karmarkar,et al.  The Deterministic Dynamic Product Cycling Problem , 1985, Oper. Res..

[25]  C. R. Glassey,et al.  Minimum Change-Over Scheduling of Several Products on One Machine , 1968, Oper. Res..

[26]  Laurence A. Wolsey,et al.  Coefficient reduction for inequalities in 0–1 variables , 1974, Math. Program..

[27]  Monique Guignard-Spielberg,et al.  Dynamic Production Scheduling for a Process Industry , 1994, Oper. Res..

[28]  P. C. Jones,et al.  When Is The Economic Lot Scheduling Problem Easy , 1989 .

[29]  Harvey M. Wagner,et al.  Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..

[30]  Ferydoon Kianfar Stronger Inequalities for 0, 1 Integer Programming Using Knapsack Functions , 1971, Oper. Res..

[31]  C L Doll,et al.  AN ITERATIVE PROCEDURE FOR THE SINGLE-MACHINE, MULTI-PRODUCT LOT SCHEDULING PROBLEM : A WORKING PAPER , 1973 .