Switch and recloser placement in distribution system considering uncertainties in loads, failure rates and repair rates
暂无分享,去创建一个
Afroz Alam | Biswarup Das | Vinay Pant | B. Das | A. Alam | V. Pant
[1] Hua Chen,et al. A sequential simulation technique for adequacy evaluation of generating systems including wind energy , 1996 .
[2] V. Fernao Pires,et al. A multiobjective placement of switching devices in distribution networks incorporating distributed energy resources , 2016 .
[3] M. Fotuhi-Firuzabad,et al. Optimized Sectionalizing Switch Placement Strategy in Distribution Systems , 2012, IEEE Transactions on Power Delivery.
[4] A. C. Miller,et al. Discrete Approximations of Probability Distributions , 1983 .
[5] Roy Billinton,et al. Basic data and evaluation of distribution system reliability worth , 1991, [Proceedings] WESCANEX '91.
[6] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[7] D. Rerkpreedapong,et al. Multiobjective optimal placement of switches and protective devices in electric power distribution systems using ant colony optimization , 2009 .
[8] Karen Miu,et al. Switch placement to improve system reliability for radial distribution systems with distributed generation , 2003 .
[9] Vassilios G. Agelidis,et al. Considerations of Sectionalizing Switches in Distribution Networks With Distributed Generation , 2015, IEEE Transactions on Power Delivery.
[10] W. H. Kersting. Radial distribution test feeders , 1991 .
[11] Chun-Lien Su,et al. Probabilistic load-flow computation using point estimate method , 2005 .
[12] J. Nahman,et al. Distribution system performance evaluation accounting for data uncertainty , 2003 .
[13] R. E. Brown,et al. Distribution system reliability: default data and model validation , 1998 .
[14] M. Fotuhi-Firuzabad,et al. A Reliability Cost/Worth Approach to Determine Optimum Switching Placement in Distribution Systems , 2005, 2005 IEEE/PES Transmission & Distribution Conference & Exposition: Asia and Pacific.
[15] E.F. El-Saadany,et al. Reliability Evaluation for Distribution System With Renewable Distributed Generation During Islanded Mode of Operation , 2009, IEEE Transactions on Power Systems.
[16] G. Desrochers,et al. A Monte-Carlo Simulation Method for the Economic Assessment of the Contribution of Wind Energy to Power Systems , 1986, IEEE Transactions on Energy Conversion.
[17] Biswarup Das,et al. Probabilistic load flow incorporating generator reactive power limit violations with spline based reconstruction method , 2014 .
[18] Ali A. Chowdhury,et al. Power Distribution System Reliability , 2009 .
[19] J. Morales,et al. Point Estimate Schemes to Solve the Probabilistic Power Flow , 2007, IEEE Transactions on Power Systems.
[20] Roy Billinton,et al. Optimal switching device placement in radial distribution systems , 1996 .
[21] C. Singh,et al. Ant Colony Optimization-Based Method for Placement of Sectionalizing Switches in Distribution Networks Using a Fuzzy Multiobjective Approach , 2009, IEEE Transactions on Power Delivery.
[22] Wenyuan Li,et al. Observability reliability evaluation in power systems considering data uncertainty , 2015, 2015 IEEE Eindhoven PowerTech.
[23] M. Fotuhi-Firuzabad,et al. Optimal Switch Placement in Distribution Systems Using Trinary Particle Swarm Optimization Algorithm , 2008, IEEE Transactions on Power Delivery.
[24] Alves da Silva,et al. Short-Term Load Forecasting , 2017 .
[25] Jose Roberto Bezerra,et al. Multiobjective Optimization Algorithm for Switch Placement in Radial Power Distribution Networks , 2015, IEEE Transactions on Power Delivery.
[26] Syed Nasar,et al. Electric Power Systems , 1972 .
[27] C. Lin,et al. Optimal switching placement for customer interruption cost minimization , 2006, 2006 IEEE Power Engineering Society General Meeting.
[28] J. Teng. A direct approach for distribution system load flow solutions , 2003 .
[29] Rainer Storn,et al. Differential Evolution – A Simple and Efficient Heuristic for global Optimization over Continuous Spaces , 1997, J. Glob. Optim..
[30] R. Billinton,et al. Wind power modeling and application in generating adequacy assessment , 1993, IEEE WESCANEX 93 Communications, Computers and Power in the Modern Environment - Conference Proceedings.