Evaluating the effect of construction process characteristics to the applicability of lean principles
暂无分享,去创建一个
[1] Manuel Laguna,et al. Business Process Modeling, Simulation and Design , 2004 .
[2] Iris D. Tommelein,et al. More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes , 1999 .
[3] Fuat Erbatur,et al. Productivity improvement in concreting operations through simulation models , 1997 .
[4] W. Edward Back. Quantifying Benefits of Electronic Technology Applied to Bulk Materials Management , 1994 .
[5] Nader Husni Abdulhadi. Simulation as a tool for re-engineering construction processes , 1998 .
[6] Anthony D. Songer,et al. Simulation of Construction Processes: Traditional Practices Versus Lean Principles , 1999 .
[7] James A. Chisman. Introduction to Simulation Modeling Using GPSS/PC , 1991 .
[8] Azim Houshyar,et al. Well-Designed Simulation; A Tool For Superior Management, Part 1 , 1994 .
[9] Jingsheng Shi,et al. Automated Construction‐Simulation Optimization , 1994 .
[10] Eugene A. Miller. What Is the Standard of Care , 1996 .
[11] Iris D. Tommelein,et al. Simulation of Buffering and Batching Practices in the Interface Detailing-Fabrication-Installation of HVAC Ductwork , 2004 .
[12] Daniel W. Halpin,et al. Planning and analysis of construction operations , 1992 .
[13] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[14] O. Salem,et al. Application of lean manufacturing principles to construction , 2005 .
[15] Keiichiro Kobayashi,et al. A THEORY OF DEBT DISORGANIZATION , 2004 .
[16] Anthony D. Songer,et al. Interplay of Project Complexity and Lean Production Methods , 2000 .
[17] Andrew J. Crowley. Construction as a manufacturing process: Lessons from the automotive industry , 1998 .
[18] S. Abourizk,et al. STATISTICAL PROPERTIES OF CONSTRUCTION DURATION DATA , 1992 .
[19] Eitan Zemel,et al. Managing Business Process Flows , 1999 .
[20] Nick Rich,et al. The seven value stream mapping tools , 1997 .
[21] Luis F Alarcón. Modeling waste and performance in construction , 1997 .
[22] Gregory A. Hansen,et al. Automating business process reengineering : using the power of visual simulation strategies to improve performance and profit , 1997 .
[23] Iris D. Tommelein. Models of Lean Construction Processes: Example of Pipe-Spool Materials Management , 1997 .
[24] Simaan M. AbouRizk,et al. Generic Implementation of Lean Concepts in Simulation Models , 2004 .
[25] Simaan M. AbouRizk,et al. FITTING BETA DISTRIBUTIONS BASED ON SAMPLE DATA , 1994 .
[26] Glenn Ballard,et al. Lean construction and EPC performance improvement , 1997 .
[27] Iris D. Tommelein,et al. Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique , 1998 .
[28] James P. Womack,et al. Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .
[29] Simaan M. AbouRizk,et al. PROBABILISTIC SIMULATION STUDIES FOR REPETITIVE CONSTRUCTION PROCESSES , 1990 .
[30] Arthur R. Tenner,et al. Process Redesign: The Implementation Guide for Managers , 1996 .