Evaluating the effect of construction process characteristics to the applicability of lean principles

Purpose – This paper seeks to test the applicability of lean principles to simple construction processes using discrete‐event simulation.Design/methodology/approach – Quantitative construction data and process mapping of plastering and block‐laying processes were first gathered and established from construction project through field observation and interviews with those involved in the selected projects. Then a simulation model was built to mimic the aforementioned processes to study the impact of certain lean principles. The simulation models became like an experimentation tool where lean principles (e.g. focus on actual objects and map the value stream) were introduced to evaluate their impact on such processes.Findings – Lean principles are effective not only in complicated processes, as proved in previous studies, but also in simple processes. Enhancing the flow of construction materials means the less time they will spend in the value stream and as a result the leaner a process will be. In fact, simp...

[1]  Manuel Laguna,et al.  Business Process Modeling, Simulation and Design , 2004 .

[2]  Iris D. Tommelein,et al.  More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes , 1999 .

[3]  Fuat Erbatur,et al.  Productivity improvement in concreting operations through simulation models , 1997 .

[4]  W. Edward Back Quantifying Benefits of Electronic Technology Applied to Bulk Materials Management , 1994 .

[5]  Nader Husni Abdulhadi Simulation as a tool for re-engineering construction processes , 1998 .

[6]  Anthony D. Songer,et al.  Simulation of Construction Processes: Traditional Practices Versus Lean Principles , 1999 .

[7]  James A. Chisman Introduction to Simulation Modeling Using GPSS/PC , 1991 .

[8]  Azim Houshyar,et al.  Well-Designed Simulation; A Tool For Superior Management, Part 1 , 1994 .

[9]  Jingsheng Shi,et al.  Automated Construction‐Simulation Optimization , 1994 .

[10]  Eugene A. Miller What Is the Standard of Care , 1996 .

[11]  Iris D. Tommelein,et al.  Simulation of Buffering and Batching Practices in the Interface Detailing-Fabrication-Installation of HVAC Ductwork , 2004 .

[12]  Daniel W. Halpin,et al.  Planning and analysis of construction operations , 1992 .

[13]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[14]  O. Salem,et al.  Application of lean manufacturing principles to construction , 2005 .

[15]  Keiichiro Kobayashi,et al.  A THEORY OF DEBT DISORGANIZATION , 2004 .

[16]  Anthony D. Songer,et al.  Interplay of Project Complexity and Lean Production Methods , 2000 .

[17]  Andrew J. Crowley Construction as a manufacturing process: Lessons from the automotive industry , 1998 .

[18]  S. Abourizk,et al.  STATISTICAL PROPERTIES OF CONSTRUCTION DURATION DATA , 1992 .

[19]  Eitan Zemel,et al.  Managing Business Process Flows , 1999 .

[20]  Nick Rich,et al.  The seven value stream mapping tools , 1997 .

[21]  Luis F Alarcón Modeling waste and performance in construction , 1997 .

[22]  Gregory A. Hansen,et al.  Automating business process reengineering : using the power of visual simulation strategies to improve performance and profit , 1997 .

[23]  Iris D. Tommelein Models of Lean Construction Processes: Example of Pipe-Spool Materials Management , 1997 .

[24]  Simaan M. AbouRizk,et al.  Generic Implementation of Lean Concepts in Simulation Models , 2004 .

[25]  Simaan M. AbouRizk,et al.  FITTING BETA DISTRIBUTIONS BASED ON SAMPLE DATA , 1994 .

[26]  Glenn Ballard,et al.  Lean construction and EPC performance improvement , 1997 .

[27]  Iris D. Tommelein,et al.  Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique , 1998 .

[28]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[29]  Simaan M. AbouRizk,et al.  PROBABILISTIC SIMULATION STUDIES FOR REPETITIVE CONSTRUCTION PROCESSES , 1990 .

[30]  Arthur R. Tenner,et al.  Process Redesign: The Implementation Guide for Managers , 1996 .