This paper presents an approach to the study of switching overvoltages during power equipment energization. Switching action is one of the most important issues in the power system restoration schemes. This action may lead to overvoltages which can damage some equipment and delay power system restoration. In this work, switching overvoltages caused by power equipment energization are evaluated using artificial-neural-network- (ANN-) based approach. Both multilayer perceptron (MLP) trained with Levenberg-Marquardt (LM) algorithm and radial basis function (RBF) structure have been analyzed. In the cases of transformer and shunt reactor energization, the worst case of switching angle and remanent flux has been considered to reduce the number of required simulations for training ANN. Also, for achieving good generalization capability for developed ANN, equivalent parameters of the network are used as ANN inputs. Developed ANN is tested for a partial of 39-bus New England test system, and results show the effectiveness of the proposed method to evaluate switching overvoltages.

[1]  K. Al-Haddad,et al.  Theory and applications of power system blockset, a MATLAB/Simulink-based simulation tool for power systems , 2000, 2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077).

[2]  R. Feuillet,et al.  Analysis and Control of Temporary Overvoltages for Automated Restoration Planning , 2002, IEEE Power Engineering Review.

[3]  Iman Sadeghkhani,et al.  Using artificial neural network to analyze harmonic overvoltages during power system restoration , 2011 .

[4]  M. Martinez Duro Damping Modelling in Transformer Energization Studies for System Restoration: Some Standard Models Compared to Field Measurements , 2009 .

[5]  Mohammad Mohammadi,et al.  Radial basis function neural network for power system load-flow , 2008 .

[6]  Mohammad Bagher Menhaj,et al.  Training feedforward networks with the Marquardt algorithm , 1994, IEEE Trans. Neural Networks.

[7]  László Prikler EMTP models for simulation of shunt reactor switching transients , 1997 .

[8]  M.M. Adibi,et al.  Overvoltage Control During Restoration , 1992, IEEE Power Engineering Review.

[9]  G. Sybille,et al.  Transformer Saturation Effects on EHV System Overvoltages , 1985, IEEE Transactions on Power Apparatus and Systems.

[10]  S. Premrudeepreechacharn,et al.  Evaluation of Switching Overvoltage in 500 kV Transmission Line Interconnection Nam Theun 2 Power Plant to Roi Et 2 substation , 2009, 2009 Asia-Pacific Power and Energy Engineering Conference.

[11]  D. Thukaram,et al.  Estimation of switching transient peak overvoltages during transmission line energization using arti , 2006 .

[12]  Iman Sadeghkhani,et al.  Radial Basis Function Neural Network Application to Measurement and Control of Shunt Reactor Overvoltages Based on Analytical Rules , 2012 .

[13]  Abbas Ketabi,et al.  Radial Basis Function Neural Network Application to Power System Restoration Studies , 2012, Comput. Intell. Neurosci..

[14]  Seyed Abbas Taher,et al.  Estimation of magnitude and time duration of temporary overvoltages using ANN in transmission lines during power system restoration , 2010, Simul. Model. Pract. Theory.

[15]  Gaston Morin Service Restoration Following a Major Failure on the Hydro-Québec Power System , 1987, IEEE Transactions on Power Delivery.