Priority scheduling to minimize the total tardiness for remanufacturing systems with flow-shop-type reprocessing lines

This study considers the scheduling problem in remanufacturing systems in which end-of-use/life products are separated into their components at a single disassembly workstation, then each component is reprocessed at one of parallel flow-shop-type reprocessing lines, and finally the reprocessed components are reassembled into remanufactured products at parallel reassembly workstations. The problem is to determine the sequence of products to be disassembled at the disassembly workstation, the sequence of components to be reprocessed at each workstation of the reprocessing lines, and the allocation and sequence of the products to be reassembled at each reassembly workstation for a due date-based objective of minimizing the total tardiness. A mathematical programming model is developed to represent the problem, and a priority scheduling approach is proposed for practical applications. To test performances of priority rules, simulation experiments were done on various test instances, and the results are reported. In particular, we show from additional tests that the approach proposed in this study outperforms the previous one that determines reprocessing and reassembly schedules according to the sequence of disassembling products significantly, and also, the rule combination approach that uses different priority rules on disassembly, reprocessing, and reassembly shops outperforms the single rule approach that uses the same rule over the three subsystems.

[1]  Dong-Ho Lee,et al.  Scheduling algorithms for remanufacturing systems with parallel flow-shop-type reprocessing lines , 2015 .

[2]  Dong-Ho Lee,et al.  Iterated greedy algorithms to minimize the total family flow time for job-shop scheduling with job families and sequence-dependent set-ups , 2017 .

[3]  A. J. Clewett,et al.  Introduction to sequencing and scheduling , 1974 .

[4]  Jaehwan Yang,et al.  Hybrid Flow Shop with Parallel Machines at the First Stage and Dedicated Machines at the Second Stage , 2015 .

[5]  Surendra M. Gupta,et al.  Material flow control and scheduling in a disassembly environment , 1998 .

[6]  V. Guide Production planning and control for remanufacturing: industry practice and research needs , 2000 .

[7]  Dong-Ho Lee,et al.  Scheduling algorithms to minimise the total family flow time for job shops with job families , 2011 .

[8]  Fawaz S. Al-Anzi,et al.  The two-stage assembly scheduling problem to minimize total completion time with setup times , 2009, Comput. Oper. Res..

[9]  Joseph Y.-T. Leung,et al.  Minimizing Total Tardiness on One Machine is NP-Hard , 1990, Math. Oper. Res..

[10]  E. Shokrollahpour,et al.  A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem , 2011 .

[11]  Chung-Yee Lee,et al.  Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem , 1993 .

[12]  Dong-Ho Lee,et al.  Real-time scheduling for reentrant hybrid flow shops: A decision tree based mechanism and its application to a TFT-LCD line , 2011, Expert Syst. Appl..

[13]  Rajesh Srivastava,et al.  Scheduling policies for remanufacturing , 1997 .

[14]  Mitsuo Gen,et al.  Hybrid Genetic Algorithms for Solving Reentrant Flow-Shop Scheduling with Time Windows , 2013 .

[15]  V. Daniel R. Guide,et al.  An evaluation of order release strategies in a remanufacturing environment , 1997, Comput. Oper. Res..

[16]  Ali Allahverdi,et al.  Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan , 2009, Comput. Oper. Res..

[17]  Fawaz S. Al-Anzi,et al.  A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times , 2007, Eur. J. Oper. Res..

[18]  V. Daniel,et al.  Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system , 1997 .

[19]  Surendra M. Gupta,et al.  Multi-kanban mechanism for appliance disassembly , 2005, SPIE Optics East.

[20]  E. Sundin,et al.  Making functional sales environmentally and economically beneficial through product remanufacturing , 2005 .

[21]  V. D. R. Guide Scheduling using drum-buffer-rope in a remanufacturing environment , 1996 .

[22]  V. Daniel R. Guide,et al.  A Simulation Model of Drum-Buffer-Rope for Production Planning and Control at a Naval Aviation Depot , 1995, Simul..

[23]  Richard J. Linn,et al.  Hybrid flow shop scheduling: a survey , 1999 .