Performance measurement for world-class manufacturing: a model for the Italian automotive industry

The continuous increase of competitiveness pushes each company to review its production processes in order to minimise as much as possible the costs and maximising customer service. The keywords are ‘zero waste’ and ‘zero loss’. There are a lot of different methods and techniques which are necessary to adopt to achieve these above objectives. Therefore, it is necessary to research the best way to implement optimisation principles. One of the best-known optimisation method is the world-class manufacturing (WCM). The implementation of WCM is a promising and a current topic. But, at the same time, it is a debated topic. The present study is a ‘pilot’ study that aims to investigate the applicability of WCM in an Italian small and medium enterprise that operates in the automotive sector. Therefore, the purpose of the research is twofold: Firstly, to provide a ‘model’ for determining the factors affecting the WCM based on core competencies of organisations. Secondly, to propose a ‘performance measures system’ in order to establish the relationship among critical factors. Hence, the research paper presents a blend of theoretical framework and practical applications. The final output is an appropriate performance measures to help managers in decision-making.

[1]  Ron McLachlin,et al.  Management initiatives and just-in-time manufacturing , 1997 .

[2]  T. C. Bond,et al.  The role of performance measurement in continuous improvement , 1999 .

[3]  Angappa Gunasekaran,et al.  World-class sustainable manufacturing: framework and a performance measurement system , 2015 .

[4]  Nilmini Wickramasinghe,et al.  Identifying the need for world class manufacturing and best practice for SMEs in the UK , 2007 .

[5]  Roger G. Schroeder,et al.  A FRAMEWORK FOR QUALITY MANAGEMENT RESEARCH AND AN ASSOCIATED MEASUREMENT INSTRUMENT , 1994 .

[6]  Roberto Revetria,et al.  A world class manufacturing implementation model , 2012 .

[7]  K. Pałucha,et al.  World Class Manufacturing model in production management , 2012 .

[8]  M. Cook Performance appraisal and true performance , 1995 .

[9]  C. G. Sreenivasa,et al.  Synergising total productive maintenance elements with ISO 9001:2008 standard based quality management system , 2014 .

[10]  H. Schneider Failure mode and effect analysis : FMEA from theory to execution , 1996 .

[11]  Andrea Rangone,et al.  Measuring resources for supporting resource‐based competition , 1995 .

[12]  Kuldip Singh Sangwan,et al.  Modeling the performance measures of world class manufacturing using interpreting structural modeling , 2015 .

[13]  Govind Sharan Dangayach,et al.  Improving productivity in Indian SMEs , 2012 .

[14]  Jaideep Motwani,et al.  Quality Practices of Indian Organizations: : An Empirical Analysis , 1994 .

[15]  Natalia Bakhtadze,et al.  The 15th IFAC Symposium on Information Control Problems in Manufacturing , 2015 .

[16]  Umit Bititci,et al.  Measuring the integrity of your business , 1995 .

[17]  H. Farsijani,et al.  World class manufacturing: techniques for implementation for small and medium sized enterprises , 1996, IEMC 96 Proceedings. International Conference on Engineering and Technology Management. Managing Virtual Enterprises: A Convergence of Communications, Computing, and Energy Technologies.

[18]  Kuldip Singh Sangwan,et al.  PERFORMANCE VALUE ANALYSIS FOR THE JUSTIFICATION OF WORLD-CLASS MANUFACTURING SYSTEMS , 2004 .

[19]  Ivanka Avelini Holjevac,et al.  Total Quality Management and Business Excellence , 2007 .

[20]  Felix T.S. Chan Design of material handling equipment selection system: an integration of expert system with analytic hierarchy process approach , 2002 .

[21]  R. Kaplan,et al.  Linking the Balanced Scorecard to Strategy , 1996 .

[22]  Maurizio Bevilacqua,et al.  Identifying manufacturing flexibility best practices in small and medium enterprises , 2002 .

[23]  Kuan Yew Wong,et al.  Critical success factors for implementing knowledge management in small and medium enterprises , 2005, Ind. Manag. Data Syst..

[24]  Nils Boysen,et al.  Just-in-Time supermarkets for part supply in the automobile industry , 2013 .

[25]  Cristina Masella,et al.  Design of performance measures for time based companies , 1991 .

[26]  Francesco Zammori,et al.  World class manufacturing in make-to-order batch-production SMEs: an exploratory analysis in northern Italy , 2017 .

[27]  Sylvia Rohlfer,et al.  Benchmarking concepts in the UK and Germany , 2004 .

[28]  Richard Schonberger,et al.  World class manufacturing : the lessons of simplicity applied , 1986 .

[29]  Callie Berliner,et al.  Cost Management for Today's Advanced Manufacturing: The Cam-I Conceptual Design , 1988 .

[30]  Fabio De Felice,et al.  Simulation Approach for the Optimization of the Layout in a Manufacturing Firm , 2013 .

[31]  Katerina Gotzamani,et al.  An empirical study of the ISO 9000 standards’ contribution towards total quality management , 2001 .

[32]  Donald Davis,et al.  A STUDY OF MEASURING THE CRITICAL FACTORS OF QUALITY MANAGEMENT , 1995 .

[33]  Lawrence M. Corbett,et al.  Business excellence in New Zealand: continuous improvement, learning, and change , 2011 .

[34]  Jaideep Motwani,et al.  Performance measurements in worldclass operations: A strategic model , 1995 .

[35]  L. J. Porter,et al.  Identification of the Critical Factors of TQM , 1996 .

[36]  Richard J. Schonberger Let's Fix It!: Overcoming the Crisis in Manufacturing , 2001 .

[37]  W. Lee,et al.  STRATEGIC MANUFACTURING CAPABILITY PURSUANCE: A CONCEPTUAL FRAMEWORK , 2004 .

[38]  Jordi Olivella,et al.  Work organisation practices for lean production , 2008 .

[39]  R. Discenza,et al.  Creative processes to develop world class systems for manufacturing , 1990, Twenty-Third Annual Hawaii International Conference on System Sciences.

[40]  Jayant V. Saraph,et al.  An Instrument for Measuring the Critical Factors of Quality Management , 1989 .

[41]  Archie Lockamy,et al.  Quality‐focused performance measurement systems: a normative model , 1998 .

[42]  Zhenxin Cao,et al.  Research of the Material Collaborative Distribution and Management for Mixed Model Automotive Assembly Process Based on Just-in-Time , 2011, 2011 International Conference on Information Management, Innovation Management and Industrial Engineering.

[43]  Maurice Gosselin An empirical study of performance measurement in manufacturing firms , 2005 .

[44]  Antonella Petrillo,et al.  Optimization of Manufacturing System through World Class Manufacturing , 2015 .

[45]  Kenton B. Walker,et al.  Corporate performance reporting revisited ‐ the balanced scorecard and dynamic management reporting , 1996 .

[46]  Fabio De Felice,et al.  Improving Operations Performance with World Class Manufacturing Technique: A Case in Automotive Industry , 2013 .

[47]  Brian H. Maskell,et al.  Performance Measurement for World Class Manufacturing: A Model for American Companies , 1991 .

[48]  G. Stewart Supply chain performance benchmarking study reveals keys to supply chain excellence , 1995 .

[49]  Sukyung Park,et al.  Computational evaluation of load carriage effects on gait balance stability , 2016, Computer methods in biomechanics and biomedical engineering.

[50]  F. D. Felice,et al.  Design and control of logistic process in an Italian Company: Opportunities and Challenges based on Industry 4.0 Principles , 2016 .

[51]  C. Voss,et al.  The impact of supply chain relationship dynamics on manufacturing performance , 2005 .

[52]  Stefano Tonchia,et al.  Manufacturing flexibility: A literature review , 1998 .

[53]  Robert J. Vokurka,et al.  Manufacturing strategic facility types , 2004, Ind. Manag. Data Syst..

[54]  John Y. Lee How to Make Financial and Nonfinancial Data Add Up , 1992 .

[55]  Simon Mosey,et al.  Understanding new‐to‐market product development in SMEs , 2005 .

[56]  A. Gurumurthy,et al.  Performance value analysis for the justification of lean manufacturing systems , 2007, 2007 IEEE International Conference on Industrial Engineering and Engineering Management.

[57]  Herbert Meyr,et al.  Supply chain planning in the German automotive industry , 2004, OR Spectr..

[58]  Angappa Gunasekaran,et al.  Justification and implementation of activity based costing in small and medium‐sized enterprises , 1999 .

[59]  Gerald Guan Gan Goh,et al.  Improving Overall Equipment Effectiveness (OEE) through integration of Maintenance Failure Mode and Effect Analysis (maintenance-FMEA) in a semiconductor manufacturer: A case study , 2015, 2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM).

[60]  Jirarat Teeravaraprug,et al.  Relationship model and supporting activities of JIT , TQM and TPM , 2011 .

[61]  Kevin W. Cruthirds,et al.  World class logistics - south of the border: an analysis of Mexican maquiladora environmentally responsible practices , 2015 .

[62]  María del Mar Espinosa,et al.  5S methodology implementation in the laboratories of an industrial engineering university school , 2015 .

[63]  A. Gunasekaran World class manufacturing in small and medium enterprises , 2000, Int. J. Manuf. Technol. Manag..

[64]  E. James Flynn,et al.  World‐class manufacturing project: overview and selected results , 1997 .

[65]  Sanjay L. Ahire,et al.  Development and Validation of TQM Implementation Constructs , 1996 .

[66]  Giorgio Mossa,et al.  Workforce Aging in Production Systems: Modeling and Performance Evaluation☆ , 2015 .

[67]  Hesan A. Quazi,et al.  Development and validation of critical factors of environmental management , 2005, Ind. Manag. Data Syst..

[68]  Andy Neely,et al.  The performance prism to boost M&A success , 2000 .

[69]  Gregory P. White A survey and taxonomy of strategy‐related performance measures for manufacturing , 1996 .

[70]  Archie Lockamy,et al.  A constraint-based framework for strategic cost management , 2003, Ind. Manag. Data Syst..

[71]  Derek Steeple,et al.  A FRAMEWORK FOR AUDITING AND ENHANCING PERFORMANCE MEASUREMENT SYSTEMS , 2000 .