On Maximizing the Throughput of Multiprocessor Tasks
暂无分享,去创建一个
[1] Joseph Y.-T. Leung,et al. Combinatorial analysis of an efficient algorithm for processor and storage allocation , 1977, 18th Annual Symposium on Foundations of Computer Science (sfcs 1977).
[2] Eugene L. Lawler,et al. Scheduling a Single Machine to Minimize the Number of Late Jobs , 1983 .
[3] Klaus Jansen,et al. Scheduling to Minimize the Average Completion Time of Dedicated Tasks , 2000, FSTTCS.
[4] Clyde L. Monma,et al. Linear-Time Algorithms for Scheduling on Parallel Processors , 1982, Oper. Res..
[5] Peter Brucker,et al. Scheduling Algorithms , 1995 .
[6] Philip S. Yu,et al. Scheduling parallel tasks to minimize average response time , 1994, SODA '94.
[7] Ernst W. Mayr,et al. On-Line Scheduling of Parallel Jobs with Runtime Restrictions , 1998, ISAAC.
[8] Sanjeev Khanna,et al. A PTAS for the multiple knapsack problem , 2000, SODA '00.
[9] Hans Kellerer,et al. A Polynomial Time Approximation Scheme for the Multiple Knapsack Problem , 1999, RANDOM-APPROX.
[10] Han Hoogeveen,et al. On-line scheduling on a single machine: maximizing the number of early jobs , 2000, Oper. Res. Lett..
[11] Maciej Drozdowski,et al. Scheduling multiprocessor tasks -- An overview , 1996 .
[12] Stéphane Dauzère-Pérès,et al. Minimizing late jobs in the general one machine scheduling problem , 1995 .
[13] Philip S. Yu,et al. Scheduling parallelizable tasks to minimize average response time , 1994, SPAA '94.
[14] Errol L. Lloyd,et al. Concurrent Task Systems , 1981, Oper. Res..
[15] Anja Feldmann,et al. Dynamic Scheduling on Parallel Machines , 1994, Theor. Comput. Sci..
[16] Han Hoogeveen,et al. Complexity of Scheduling Multiprocessor Tasks with Prespecified Processor Allocations , 1994, Discret. Appl. Math..
[17] Klaus Jansen,et al. On Minimizing Average Weighted Completion Time of Multiprocessor Tasks with Release Dates , 2001, ICALP.
[18] Chung-Lun Li,et al. Minimizing total completion time in two‐processor task systems with prespecified processor allocations , 1998 .
[19] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[20] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[21] Vijay V. Vazirani,et al. Approximation Algorithms , 2001, Springer Berlin Heidelberg.
[22] J. M. Moore,et al. A Functional Equation and its Application to Resource Allocation and Sequencing Problems , 1969 .
[23] Joseph Y.-T. Leung,et al. Bin packing: Maximizing the number of pieces packed , 2004, Acta Informatica.
[24] J. Håstad. Clique is hard to approximate withinn1−ε , 1999 .
[25] Hans Kellerer,et al. The Multiple Subset Sum Problem , 2000, SIAM J. Optim..
[26] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[27] Evripidis Bampis,et al. Scheduling Independent Multiprocessor Tasks , 1997, ESA.
[28] Dorit S. Hochbaum,et al. Approximation Algorithms for NP-Hard Problems , 1996 .