The joint economic lot size problem: A review
暂无分享,去创建一个
[1] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[2] R. J. Tersine. Principles of inventory and materials management , 1982 .
[3] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .
[4] S. Goyal. “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .
[5] S. Goyal,et al. Integrated inventory models: The buyer-vendor coordination , 1989 .
[6] Prafulla Joglekar,et al. The Individually Responsible and Rational Decision Approach to Economic Lot Sizes for One Vendor and Many Purchasers , 1990 .
[7] Farrokh Nasri,et al. A comparison of alternative joint vendor-purchaser lot-sizing models , 1993 .
[8] R. Nanda,et al. Quantity discounts using a joint lot size model under learning effects—multiple buyers case , 1993 .
[9] Avijit Banerjee,et al. A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange , 1994 .
[10] Suresh Kumar Goyal,et al. A one-vendor multi-buyer integrated inventory model: A comment , 1995 .
[11] A. Banerjee,et al. An integrated JIT inventory model , 1995 .
[12] Douglas J. Thomas,et al. Coordinated supply chain management , 1996 .
[13] Henry Mintzberg. Musings on management. Ten ideas designed to rile everyone who cares about management. , 1996, Harvard business review.
[14] R. Hill. The single-vendor single-buyer integrated production-inventory model with a generalised policy , 1997 .
[15] S. Viswanathan,et al. Optimal strategy for the integrated vendor-buyer inventory model , 1998, Eur. J. Oper. Res..
[16] S. Bylka. A dynamic model for the single-vendor, multi-buyer problem , 1999 .
[17] Roger M. Hill,et al. The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem , 1999 .
[18] T. Skjøtt-Larsen,et al. Managing the Global Supply Chain , 1999 .
[19] H. Wee,et al. Economic ordering policy of deteriorated item for vendor and buyer: An integrated approach , 2000 .
[20] Suresh Kumar Goyal,et al. An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment , 2000 .
[21] M. Porter. What is strategy , 2000 .
[22] Fassil Nebebe,et al. Determination of economic production-shipment policy for a single-vendor-single-buyer system , 2000, Eur. J. Oper. Res..
[23] Moosa Sharafali,et al. Some models for understanding the cooperation between the supplier and the buyer , 2000 .
[24] Shu-Lu Hsu,et al. ORDER PROCESSING COST REDUCTION IN A JOINT VENDOR-BUYER INVENTORY SYSTEM VIA THE APPLICATION OF INFORMATION TECHNOLOGY , 2000 .
[25] S. K. Goyal,et al. On improving the single-vendor single-buyer integrated production inventory model with a generalized policy , 2000, Eur. J. Oper. Res..
[26] Shu-Lu Hsu,et al. An integrated inventory model for a single vendor and multiple buyers with ordering cost reduction , 2001 .
[27] Hui-Ming Wee,et al. The economic lot size of the integrated vendor‐buyer inventory system derived without derivatives , 2002 .
[28] M. Javad Paknejad,et al. Quality improvement and setup reduction in the joint economic lot size model , 2002, Eur. J. Oper. Res..
[29] Jason Chao-Hsien Pan,et al. A study of an integrated inventory with controllable lead time , 2002 .
[30] Chao-Kuei Huang. An integrated vendor-buyer cooperative inventory model for items with imperfect quality , 2002 .
[31] Hui-Ming Wee,et al. Production , Manufacturing and Logistics A single-vendor and multiple-buyers production – inventory policy for a deteriorating item , 2002 .
[32] M. Khouja. Optimizing inventory decisions in a multi-stage multi-customer supply chain , 2003 .
[33] L. Ouyang,et al. An integrated single-vendor single-buyer inventory system with shortage derived algebraically , 2003 .
[34] S. Goyal,et al. A simple integrated production policy of an imperfect item for vendor and buyer , 2003 .
[35] H. Wee,et al. Integrated inventory model for deteriorating items under a multi-echelon supply chain environment , 2003 .
[36] Daesung Ha,et al. A JIT lot-splitting model for supply chain management: Enhancing buyer–supplier linkage , 2003 .
[37] Suresh Kumar Goyal. A note on: On controlling the controllable lead time component in the integrated inventory models , 2003 .
[38] M. Braglia,et al. Modelling an industrial strategy for inventory management in supply chains: The 'Consignment Stock' case , 2003 .
[39] Sila Çetinkaya,et al. The Buyer-Vendor Coordination Problem: Modeling Inbound and Outbound Cargo Capacity and Costs , 2003 .
[40] Po-Chung Yang,et al. An integrated multi-lot-size production inventory model for deteriorating item , 2003, Comput. Oper. Res..
[41] M. Hariga,et al. Integrated single vendor single buyer model with stochastic demand and variable lead time , 2004 .
[42] Chinho Lin,et al. A Joint EOQ Model for supplier and retailer with deteriorating items , 2004, Asia Pac. J. Oper. Res..
[43] Jason Chao-Hsien Pan,et al. Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .
[44] Hui-Ming Wee,et al. Deteriorating item inventory model with shortage due to supplier in an integrated supply chain , 2004, Int. J. Syst. Sci..
[45] Hui-Ming Wee,et al. Production , Manufacturing and Logistics The optimal and heuristic solutions of a distribution network , 2004 .
[46] L. Ouyang,et al. Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time , 2004 .
[47] Chao-Kuei Huang. An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration , 2004 .
[48] Moshe Eben-Chaime,et al. The effect of discreteness in vendor-buyer relationships , 2004 .
[49] Tsung-Hui Chen,et al. Optimizing Supply Chain Collaboration Based on Joint Replenishment and Channel Coordination , 2005 .
[50] T. Kim,et al. Joint economic production allocation and ordering policies in a supply chain consisting of multiple plants and a single retailer , 2005 .
[51] E. J. Comeaux,et al. Joint optimization of process improvement investments for supplier–buyer cooperative commerce , 2005, J. Oper. Res. Soc..
[52] Wenyih Lee. A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering , 2005 .
[53] Liang-Yuh Ouyang,et al. Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction , 2006, Eur. J. Oper. Res..
[54] Suresh Kumar Goyal,et al. A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer , 2006 .
[55] L. Ouyang,et al. Analysis of optimal vendor-buyer integrated inventory policy involving defective items , 2006 .
[56] Hui-Ming Wee,et al. An integrated production-inventory model for ameliorating and deteriorating items taking account of time discounting , 2006, Math. Comput. Model..
[57] Jia-Yen Huang,et al. A new algorithm for optimally determining lot-sizing policies for a deteriorating item in an integrated production-inventory system , 2006, Comput. Math. Appl..
[58] R. Ibrahim,et al. Joint economic lot size in distribution system with multiple shipment policy , 2006 .
[59] Chia-Huei Ho,et al. The Single-Vendor Single-Buyer Integrated inventory Problem with Quality Improvement and lead Time Reduction - minimax Distribution-Free Approach , 2006, Asia Pac. J. Oper. Res..
[60] Taebok Kim,et al. Joint economic procurement—production–delivery policy for multiple items in a single-manufacturer, multiple-retailer system , 2006 .
[61] Sarada Prasad Sarmah,et al. Buyer vendor coordination models in supply chain management , 2006, Eur. J. Oper. Res..
[62] Mehmet Gumus,et al. Impact of Consignment Inventory and Vendor-Managed Inventory for a Two-Party Supply Chain , 2006 .
[63] Hui-Ming Wee,et al. A discussion on economic ordering policy of deteriorated item for vendor and buyer , 2006 .
[64] Xiaofei Xu,et al. INCORPORATING TRANSPORTATION COSTS INTO JIT LOT SPLITTING DECISIONS FOR COORDINATED SUPPLY CHAINS , 2006 .
[65] R. M. Hill,et al. Another look at the single-vendor single-buyer integrated production-inventory problem , 2006 .
[66] Liang Liang,et al. An integrated vendor-managed inventory model for a two-echelon system with order cost reduction , 2007 .
[67] Reza Zanjirani Farahani,et al. A joint economic lot-size model for an integrated supply network using genetic algorithm , 2007, Appl. Math. Comput..
[68] Chinho Lin,et al. A cooperative inventory policy with deteriorating items for a two-echelon model , 2007, Eur. J. Oper. Res..
[69] Beatriz Abdul-Jalbar,et al. An integrated inventory model for the single-vendor two-buyer problem , 2007 .
[70] Hui-Ming Wee,et al. A note on a single-vendor and multiple-buyers production-inventory policy for a deteriorating item , 2007, Eur. J. Oper. Res..
[71] .. M.F.Yang. Optimal Strategy for the Integrated Vendor-buyer Inventory Model with Fuzzy Annual Demand and Fuzzy Adjustable Production Rate , 2007 .
[72] Brian G. Kingsman,et al. Coordination in a single-vendor multi-buyer supply chain by synchronizing delivery and production cycles , 2007 .
[73] Liang-Yuh Ouyang,et al. Integrated vendor--buyer inventory system with sublot sampling inspection policy and controllable lead time , 2007, Int. J. Syst. Sci..
[74] Hui-Ming Wee,et al. Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives , 2007, Eur. J. Oper. Res..
[75] Sarada Prasad Sarmah,et al. Supply-chain coordination model with insufficient production capacity and option for outsourcing , 2007, Math. Comput. Model..
[76] Hui-Ming Wee,et al. Optimal replenishment Policy for an Integrated Supplier-buyer deteriorating inventory Model Considering Multiple JIT Delivery and Other Cost Functions , 2007, Asia Pac. J. Oper. Res..
[77] Leopoldo Eduardo Cárdenas-Barrón,et al. Optimizing inventory decisions in a multi-stage multi-customer supply chain: A note , 2007 .
[78] M. Darwish,et al. Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost , 2007, Eur. J. Oper. Res..
[79] C. S. P. Rao,et al. Consignment stock policy with controllable lead time for effective inventory management in supply chains , 2007, Int. J. Manuf. Technol. Manag..
[80] L. Ouyang,et al. An integrated vendor–buyer inventory model with quality improvement and lead time reduction , 2007 .
[81] H. Wee,et al. An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation , 2007 .
[82] Simone Zanoni,et al. Single-vendor single-buyer with integrated transport-inventory system: Models and heuristics in the case of perishable goods , 2007, Comput. Ind. Eng..
[83] Jonathan Burton,et al. Supply chain coordination through effective multi-stage inventory linkages in a JIT environment , 2007 .
[84] Jen-Ming Chen,et al. The profit-maximization model for a multi-item distribution channel , 2007 .
[85] Yong-Wu Zhou,et al. Optimal production and shipment models for a single-vendor-single-buyer integrated system , 2007, Eur. J. Oper. Res..
[86] P. C. Yang,et al. Global optimal policy for vendor–buyer integrated inventory system within just in time environment , 2007, J. Glob. Optim..
[87] M. A. Hoque,et al. An alternative model for integrated vendor–buyer inventory under controllable lead time and its heuristic solution , 2007, Int. J. Syst. Sci..
[88] Hui-Ming Wee,et al. A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives , 2007, Eur. J. Oper. Res..
[89] Sila Çetinkaya,et al. A note on "quality improvement and setup reduction in the joint economic lot size model" , 2007, Eur. J. Oper. Res..
[90] Yu-Cheng Hsiao. A note on integrated single vendor single buyer model with stochastic demand and variable lead time , 2008 .
[91] Kun-Jen Chung. A necessary and sufficient condition for the existence of the optimal solution of a single-vendor single-buyer integrated production-inventory model with process unreliability consideration , 2008 .
[92] Mohamed Ben-Daya,et al. Integrated inventory and inspection policies for stochastic demand , 2008, Eur. J. Oper. Res..
[93] Ab Rahman Ahmad,et al. Optimizing inventory decisions in a multi-stage supply chain under stochastic demands , 2008, Appl. Math. Comput..
[94] Mohamad Y. Jaber,et al. Coordinating a two-level supply chain with production interruptions to restore process quality , 2008, Comput. Ind. Eng..
[95] M. A. Hoque,et al. Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain , 2008, Eur. J. Oper. Res..
[96] Hui-Ming Wee,et al. Collaborative vendor-buyer inventory system with declining market , 2008, Comput. Ind. Eng..
[97] Seung-Lae Kim,et al. Production and delivery policies for enhanced supply chain partnerships , 2008 .
[98] J. Pan,et al. Integrated inventory models with fuzzy annual demand and fuzzy production rate in a supply chain , 2008 .
[99] Sila Çetinkaya,et al. Quantifying the value of buyer-vendor coordination: Analytical and numerical results under different replenishment cost structures , 2008, Eur. J. Oper. Res..
[100] M. Ben‐Daya,et al. An integrated inventory production system in a three-layer supply chain , 2008 .
[101] Chei-Chang Chiou,et al. An exact policy for enhancing buyer–supplier linkage in supply chain system , 2008 .
[102] Yu-Cheng Hsiao,et al. Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information , 2008 .
[103] Moshe Eben-Chaime,et al. How accurate is the integrated vendor–buyer continuous model? , 2008 .
[104] Joaquín Sicilia,et al. Policies for a single-vendor multi-buyer system with finite production rate , 2008, Decis. Support Syst..
[105] M. Darwish,et al. The joint economic lot sizing problem: Review and extensions , 2008, Eur. J. Oper. Res..
[106] Dong-Ping Song,et al. Quantifying the effectiveness of VMI and integrated inventory management in a supply chain with uncertain lead-times and uncertain demands , 2008 .
[107] Mallika Parveen,et al. Managing quality improvement, setup cost and lead time reductions in a just-in-time integrated inventory model , 2008, Int. J. Inf. Syst. Chang. Manag..
[108] Technical note: production allocation, lot-sizing, and shipment policies for multiple items in multiple production lines , 2008 .
[109] Hui-Ming Wee,et al. A near optimal solution for integrated production inventory supplier-buyer deteriorating model considering JIT delivery batch , 2008, Int. J. Comput. Integr. Manuf..
[110] S. Goyal,et al. Coordinating a three-level supply chain with multiple suppliers, a vendor and multiple buyers , 2008 .
[111] Hui-Ming Wee,et al. Optimal policy for a closed-loop supply chain inventory system with remanufacturing , 2008, Math. Comput. Model..
[112] Kun-Jen Chung. An improvement of an integrated single-vendor single-buyer inventory model with shortage , 2008 .
[113] Kripa Shanker,et al. Two-echelon supply chain inventory model with controllable lead time and service level constraint , 2009, Comput. Ind. Eng..
[114] Tadeusz Sawik,et al. Coordinated supply chain scheduling , 2009 .
[115] Kripa Shanker,et al. A single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying items , 2009 .
[116] Mohammad Modarres,et al. Developing a coordinated vendor-buyer model in two-stage supply chains with stochastic lead-times , 2009, Comput. Oper. Res..
[117] Mallika Parveen,et al. A JIT integrated inventory model for a buyer and a vendor considering the impact of quality improvement , 2009, Int. J. Manuf. Technol. Manag..
[118] M. A. Hoque. An alternative optimal solution technique for a single-vendor single-buyer integrated production inventory model , 2009 .
[119] Kit-Nam Francis Leung,et al. A technical note on “Optimizing inventory decisions in a multi-stage multi-customer supply chain” , 2009 .
[120] Stefan Minner,et al. Buyer–supplier cooperation and negotiation support with random yield consideration , 2009 .
[121] Chia-Huei Ho,et al. A Minimax Distribution Free Procedure for an Integrated Inventory Model with Defective Goods and Stochastic Lead Time Demand , 2009 .
[122] C. Glock. A Comment: "Integrated single vendor single buyer model with stochastic demand and variable lead time" , 2009 .
[123] Mohsen Sheikh Sajadieh,et al. An integrated vendor–buyer cooperative model under stochastic supply lead-time , 2009 .
[124] Bhaba R. Sarker,et al. Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers , 2009, Eur. J. Oper. Res..
[125] Mark T. Leung,et al. Stocking policy in a two-party vendor managed channel with space restrictions , 2009 .
[126] Yu-Jen Lin,et al. An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost , 2009, Comput. Ind. Eng..
[127] S. K. Goyal,et al. An alternative simple solution algorithm of an inventory model with fixed and variable lead time crash costs under unknown demand distribution , 2009, Int. J. Syst. Sci..
[128] Tadeusz Sawik,et al. Monolithic versus hierarchical approach to integrated scheduling in a supply chain , 2009 .
[129] M. H. Fazel Zarandi,et al. Coordination of order and production policy in buyer–vendor chain using PROSA Holonic architecture , 2009 .
[130] Mohammed A. Darwish. Economic selection of process mean for single-vendor single-buyer supply chain , 2009, Eur. J. Oper. Res..
[131] Mohammad Reza Akbari Jokar,et al. Optimizing shipment, ordering and pricing policies in a two-stage supply chain with price-sensitive demand , 2009 .
[132] Shu-Lu Hsu,et al. Replenishment and Lead Time Decisions in Manufacturer-Retailer Chains , 2009 .
[133] Mohamed E. Seliaman,et al. A Generalized Algebraic Model for Optimizing Inventory Decisions in a Multi-Stage Complex Supply Chain , 2009 .
[134] Qingyan Huang,et al. A note on “Modelling an industrial strategy for inventory management in supply chains: the ‘Consignment Stock’ case” , 2009 .
[135] S. Zanoni,et al. A one-vendor multi-buyer integrated production-inventory model: The 'Consignment Stock' case , 2009 .
[136] Hui-Ming Wee,et al. Sequential and global optimization for a closed-loop deteriorating inventory supply chain , 2010, Math. Comput. Model..
[137] Angappa Gunasekaran,et al. Consignment stock inventory model in an integrated supply chain , 2010 .
[138] Anders Thorstenson,et al. An integrated vendor-buyer model with stock-dependent demand , 2010 .
[139] Shu-Lu Hsu,et al. An integrated inventory model with controllable lead time and distribution-free demand , 2010 .
[140] Jen-Ming Chen,et al. Channel coordination under consignment and vendor-managed inventory in a distribution system , 2010 .
[141] D. Battini,et al. Consignment stock inventory policy: methodological framework and model , 2010 .
[142] Yeong-Dae Kim,et al. Inventory replenishment and delivery planning in a two-level supply chain with compound Poisson demands , 2010 .
[143] Joint optimal production-inventory model with imperfect production processes and varying deterioration rate in buoyant market , 2010 .
[144] Ata Allah Taleizadeh,et al. A particle swarm optimization approach for constraint joint single buyer-single vendor inventory problem with changeable lead time and (r,Q) policy in supply chain , 2010 .
[145] Daesung Ha. Note on: A necessary and sufficient conditions for the existence of the optimal solution of a single-vendor single-buyer integrated production-inventory model with process unreliability consideration , 2010 .
[146] S. T. A. Niaki,et al. An investigation of vendor-managed inventory application in supply chain: the EOQ model with shortage , 2010 .
[147] Jafar Razmi,et al. Developing a two-echelon mathematical model for a vendor-managed inventory (VMI) system , 2010 .
[148] C.S.P. Rao,et al. Optimization of supply chains for single-vendor–multibuyer consignment stock policy with genetic algorithm , 2010 .
[149] B. R. Sarker,et al. Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system , 2010, J. Oper. Res. Soc..
[150] Tsung-Hui Chen,et al. Optimal ordering and pricing policies for deteriorating items in one-vendor multi-retailer supply chain , 2010 .
[151] Yu-Jen Lin,et al. A stochastic periodic review integrated inventory model involving defective items, backorder price discount, and variable lead time , 2010, 4OR.
[152] M. Gümüş,et al. Calculating the benefits of vendor managed inventory in a manufacturer-retailer system , 2010 .
[153] M. Jaber,et al. Coordinating a three-level supply chain with learning-based continuous improvement , 2010 .
[154] Chinho Lin,et al. On conflict and cooperation in a two-echelon inventory model for deteriorating items , 2010, Comput. Ind. Eng..
[155] Mohammed A. Darwish,et al. Vendor managed inventory model for single-vendor multi-retailer supply chains , 2010, Eur. J. Oper. Res..
[156] Manoranjan Maiti,et al. Two warehouse inventory models for single vendor multiple retailers with price and stock dependent demand , 2010 .
[157] Kun-Jen Chung. Some comments on the economic lot size of a three-stage supply chain with backordering derived without derivatives , 2010, Eur. J. Oper. Res..
[158] Kit-Nam Francis Leung,et al. A Generalized Algebraic Model for Optimizing Inventory Decisions in a Centralized or Decentralized Multi-Stage Multi-Firm Supply Chain , 2010 .
[159] Jonas C. P. Yu,et al. Optimal deteriorating Items inventory Model with a Three-echelon Supply Chain Strategic Alliance , 2010, Asia Pac. J. Oper. Res..
[160] Christoph H. Glock,et al. A multiple-vendor single-buyer integrated inventory model with a variable number of vendors , 2011, Comput. Ind. Eng..
[161] Christoph H. Glock,et al. A comparison of alternative delivery structures in a dual sourcing environment , 2012 .